Saturday, November 14, 2026Cortlandt, New YorkWeatherSearch
cortlandt.news
Local news · Reporting produced with AI
← Meeting & documents
Official certified transcript

2026-03-03 · Planning Board

Imported from the Town’s original PDF. Speakers follow the printed labels. Citations use PDF pages rather than video timestamps.

Original certified PDF ↗ · Archived original ↓

Certificate date text differs or is incomplete; title-page date matches index. Review original certificate.

Page 1 Original page ↗

      TOWN OF CORTLANDT

  PLANNING AND ZONING BOARDS




        BOARD MEETING




           Town Hall

        1 Heady Street

Cortlandt Manor, New York 1057

        March 3, 2026

    6:30 p.m. - 7:42 p.m.

Page 2 Original page ↗

                                                             Page 2
March 3, 2026

MEMBERS PRESENT:


     Steven Kessler, Chairman

     Thomas A. Bianchi, Vice Chairman

     Kevin Kobasa, Member

     Peter McKinley, Member

     Jeff Rothfeder, Member

     Kellan Cantrell, Alternate



MEMBERS ABSENT:


     Nora Hildinger, Member



ALSO PRESENT:


     Chris Kehoe, AICP, Director of Planning

     Michael Cunningham, Esq., Deputy Town Attorney

     Heather LaVarnway, CNU-A, Planner

     Chris Lapine, P.E., Engineer

     Catherine Brosnan, P.E., Assistant Civil Engineer




                        Geneva Worldwide, Inc.
            228 Park Ave S - PMB 27669. New York, NY 10003

Page 3 Original page ↗

                                                              Page 3
1    March 3, 2026

 2    (The board meeting commenced at 6:30 p.m.)

 3             MR. STEVEN KESSLER:           Welcome to the

 4   planning board meeting of March 3rd. Please rise

 5   for the pledge.

 6             MULTIPLE:       I pledge allegiance to the

 7   flag of the United States of America and to the

 8   republic for which it stands, one nation under

 9   God, indivisible with liberty and justice for

10   all.

11             MR. KESSLER:        Roll please, Chris.

12             MR. CHRIS KEHOE:          Mr. Kobasa.

13             MR. KEVIN KOBASA:           Here.

14             MR. KEHOE:       Ms. Timko?

15             MS. KAREN TIMKO:          Here.

16             MR. KEHOE:       Mr. Rothfeder?

17             MR. JEFF ROTHFEDER:           Here.

18             MR. KEHOE:       Mr. Kessler?

19             MR. KESSLER:        Here.

20             MR. KEHOE:       Mr. Bianchi?

21             MR. THOMAS BIANCHI:           Here.

22             MR. KEHOE:       Mr. Cantrell?

23             MR. KELLAN CANTRELL:            Here.

24             MR. KEHOE:       Mr. McKinley?



                        Geneva Worldwide, Inc.
            228 Park Ave S - PMB 27669. New York, NY 10003

Page 4 Original page ↗

                                                            Page 4
1    March 3, 2026

 2             MR. PETER MCKINLEY:          Here.

 3             MR. KEHOE:      Ms. Hildinger noted as

 4   absent.

 5             MR. KESSLER:       Thank you. We have a

 6   change to the agenda tonight. There are two items

 7   that’ll be removed from the agenda per the,

 8   excuse me. Excuse me.

 9             UNIDENTIFIED FEMALE:            Sorry.

10             MR. KESSLER:       We have two changes to the

11   agenda. We have two items that be removed per the

12   applicant’s request. That is the public hearing

13   regarding VS Construction for Evergreen Manner,

14   and secondly, under old business, the application

15   of 70 Roa Hook Road Realty for a site development

16   plan by Annesville Circle for a former car wash.

17   Can I please have a motion for the adoption of

18   our minutes, the meeting of February 2nd?

19             MR. BIANCHI:       So moved.

20             MR. MCKINLEY:         Second.

21             MR. KESSLER:       Second, thank you. One the

22   question, all in favor?

23             MULTIPLE:      Aye.

24             MR. KESSLER:       Opposed? All right. First



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 5 Original page ↗

                                                            Page 5
1    March 3, 2026

 2   item is a letter dated February 20, 2026 from Jim

 3   Annicchiarico requesting the fifth six-month time

 4   extension for preliminary plat approval for the

 5   Pomona Development, LLC subdivision located on

 6   the south side of Revolutionary Road south of

 7   Eaton Lane. Jeff?

 8               MR. ROTHFEDER:      Mr. Chair, I move that

 9   we approve resolution 6-26. Is that right?

10               MR. KESSLER:     Yeah, that’s it.

11               MR. ROTHFEDER:      Yeah.

12               MR. KESSLER:     Second please.

13               MR. BIANCHI:     Second.

14               MR. KESSLER:     And on the question? All

15   in favor?

16               MULTIPLE:    Aye.

17               MR. KESSLER:     Opposed? Okay. All right,

18   the next item is a public hearing and it’s an

19   adjourned public hearing. It is the public

20   hearing application of Yeshiva Ohr Hameir for

21   site plan approval, an amended special permit for

22   a university, college or seminary, and a wetland

23   permit for a proposed 51,730 square foot

24   dormitory building, the repurposing of other



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 6 Original page ↗

                                                            Page 6
1    March 3, 2026

 2   buildings on site, site improvements including

 3   storm water, landscaping, and building facade

 4   renovations located at the existing Yeshiva Ohr

 5   Hameir campus at 141 Furnace Woods Road, latest

 6   drawings, February 18, 2026. Mr. Schwartz, good

 7   evening.

 8              MR. BRAD SCHWARTZ:         Good evening,

 9   Chairman Kessler, members of the board and staff.

10   For the record, Brad Schwartz from Zarin and

11   Steinmetz representing the Yeshiva, joined

12   tonight by Steve Marino, Dan Ciarcia, and my

13   associate Vincent Pedone. So were last here on

14   January 6th. That was the second public hearing

15   session. Tonight will be the third public hearing

16   session.

17              Since the last meeting our team met with

18   town staff to address certain outstanding

19   engineering items. We made a submission on

20   February 18th addressing those engineering items,

21   including a letter from Mr. Ciarcia. I’m not

22   going to run the table on all of them, but just

23   to highlight a few. As requested by planning, we

24   submitted a photometric plan that shows all dark



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 7 Original page ↗

                                                            Page 7
1    March 3, 2026

 2   sky compliant lighting. Thanks to engineering’s

 3   assistance, we met on site with the fire

 4   department and resolved all turnaround and

 5   accessibility issues on the site with the fire

 6   department and addressed all those outstanding

 7   items. We also submitted a revised SWPPP and we

 8   think we made a lot of progress as was mentioned

 9   during the work session with respect to the storm

10   water design. The board had requested updated

11   architectural floor plans. We submitted those as

12   well. So you have all of this info that was

13   recently submitted. Our team is here to answer

14   any questions. Otherwise, we’re happy to listen

15   to the additional public comment this evening and

16   hopefully your board will be in a position to

17   close the hearing at the end of the night.

18            MR. KESSLER:        Okay. Well, the board has

19   I think, a number of comments, but let’s wait

20   until after we hear from the public and then

21   we’ll address them.

22            MR. SCHWARTZ:         Perfect.

23            MR. KESSLER:        With that, this is a

24   public hearing. Is there anybody that wishes to



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 8 Original page ↗

                                                            Page 8
1    March 3, 2026

 2   comment on the application? Please come up, state

 3   your name, address for the record. Yeah, please.

 4            MS. LINDA MCMANN:          Hi, good evening.

 5   Linda McMann, 14 Lakeview Avenue West. Good

 6   evening chair person and members of the planning

 7   board. Thank you for the opportunity to speak

 8   this evening. I’d like to emphasize the

 9   importance of grounding this application review

10   of the town’s established land use standards and

11   environmental protections. The Yeshiva’s proposal

12   presents significant questions about code

13   compliance, neighborhood compatibility, and

14   potential impacts to sensitive wetland areas, all

15   of which require careful fact-based evaluation

16   under town codes and SEQRA. My comments this

17   evening focus on these core regulatory

18   responsibilities and why they should guide the

19   board’s decision moving forward.

20            First, I respect respectfully urge the

21   board to apply chapter 307 of the Town Code,

22   which clearly establishes the standards governing

23   what may be built and how it must relate to its

24   surroundings. The code requires the new



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 9 Original page ↗

                                                            Page 9
1    March 3, 2026

 2   development be compatible with the scaled massing

 3   roof forms and materials of the neighborhood.

 4   This property is located within and directly

 5   adjacent to an established single family

 6   residential neighborhood. Because of this, I

 7   asked the board, I asked that the board require

 8   any new buildings, including the proposed 51,000

 9   square foot dormitory to be designed in a matter

10   that reflects the existing residential character

11   of both the campus and the neighboring homes.

12   Large multistory institutional structures are

13   markedly different in massing and appearance from

14   the existing buildings on the site and from the

15   surrounding residential area. Under chapter 307,

16   compatibility is not optional, it’s a

17   requirement. RLUIPA does not override or displace

18   neutral general, applicable, applicable land use

19   regulations such as these. RLUIPA does not

20   prevent the board from enforcing objective zoning

21   criteria related to height, massing, neighborhood

22   character, aesthetics, and environmental

23   standards so as long as they’re applied fairly

24   and uniformly. In this case, the board is acting



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 10 Original page ↗

                                                            Page 10
1    March 3, 2026

 2   fully within its authority.

 3            Second, I would like to address the

 4   potential risk that the construction activity,

 5   particularly any building expansion, may pose to

 6   the wetlands. Any materials or runoff entering

 7   the wetlands can travel through the Blue Mountain

 8   Reservation, flow into Lake Rose, and ultimately

 9   reach the field in front of the middle school. As

10   many of you likely know, that front field floods

11   during heavy storms. Given this downstream

12   vulnerability, especially in an area where

13   children are present, it is essential that a

14   thorough, well-documented, science-based

15   environmental investigation be conducted in

16   accordance with Chapter 179.

17            This need is heightened by the fact that

18   one of the stated justifications for the sewer

19   installation was concerns that nitrates and

20   pathogens could be present in the wetlands.

21   RLUIPA does not exempt any applicant from meeting

22   environmental requirements under Chapter 179, and

23   these obligations remain critical to ensuring the

24   protection of our wetlands and safety of our



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 11 Original page ↗

                                                            Page 11
1    March 3, 2026

 2   community.

 3            With that being said, under Chapter 179,

 4   as well as SEQRA, I respectfully request that the

 5   board require comprehensive groundwater sampling,

 6   a downstream contamination, contamination

 7   analysis, soil testing in the flood prone areas

 8   of the middle school. Without baseline

 9   groundwater data, a downstream impact assessment

10   and complete wetland studies, the board cannot

11   confidently make the legally required finding

12   that this project will not adversely affect

13   wetlands, public lands, or public health.

14            These are not extraordinary requests.

15   These are basic safeguards required when

16   development is proposed adjacent to protected

17   wetlands, known flood prone areas and public

18   facilities used by children.

19            Along these lines, it is essential to

20   recognized that large scale construction as well

21   as tree removal, can significantly alter

22   hydrology. Redirected storm water has the

23   potential to carry untreated runoff directly into

24   protected wetlands. At this time, it is not clear



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 12 Original page ↗

                                                            Page 12
1    March 3, 2026

 2   that the applicant has demonstrated that these

 3   impacts will be avoided or sufficiently mitigated

 4   as required under Chapter 179.

 5            Therefore, I ask that a wetlands

 6   environmental analysis be submitted to the board

 7   that evaluates the cumulative impacts of the

 8   building. Expansion tree, tree removal

 9   construction activity, alter drainage patterns,

10   changes to grading and storm water runoff.

11            In closing, I urge the board to ensure

12   that all applicable, applicable sections of town

13   codes and SEQRA are fully satisfied before any

14   special permit amendment or wetlands permit is

15   granted. These reviews are designed to protect

16   our environmental resources, public safety and

17   wellbeing of the entire community. Once again,

18   RLUIPA does not prevent the board from requiring

19   full compliance with these neutral standard

20   regulatory requirements. Thank you for your time

21   and for your thorough evaluation of this

22   application. I look forward to the forthcoming

23   results on the environmental impact analysis.

24   Thank you.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 13 Original page ↗

                                                            Page 13
1    March 3, 2026

 2            MR. KESSLER:        Thank you. Anybody else

 3   wish to comment?

 4            MS. SHERRY ANN COOK:            Good evening,

5    ladies and gentlemen. I am Sherry Ann Cook. I

6    reside within the town of Cortlandt, and I am

 7   speaking regarding a great deal of work and

 8   research I’ve done on this, the entirety of this

 9   project, especially the records that I got from

10   the Department of Health as a result of my FOIL.

11   I believe that no matter what is said at any of

12   these public hearings, that the town undertaking

13   what the Yeshiva could not do for itself from

14   2007 until 2021 presents a specific question on

15   federal law of whether or not the town itself has

16   violated the establishment clause for separation

17   between church and state. Against the

18   representations for RLUIPA, also known by some as

19   RLUIPA or religious and institutionalized persons

20   land use act. I present that these questions can

21   be answered by a federal court.

22            I do not, I am personally very upset

23   that our tax dollars and public grants were used

24   to forward the interests of only a religious



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 14 Original page ↗

                                                            Page 14
1    March 3, 2026

 2   entity. And the case law that I have researched,

 3   which started out from a decision of 1994,

 4   involving Kiryas Joel and the Woodbury school

 5   district, gave me the trail of this case law

 6   about the violation of the establishment clause

 7   between separation of church and state. The town

 8   has forwarded the interests of only the yeshiva,

 9   no other entity.

10               The project that the town undertook does

11   not represent any secular or public purpose.

12   These 130 proposed or possible or potential

13   houses that might at some unknown future be

14   utilized, the town never even had those pieces or

15   parcels of property authorized for the wastewater

16   to go to the county trunk and the Peekskill

17   sanitary sewer district. Only the yeshiva is

18   allowed and authorized to ever use that facility.

19   No matter what sewer district you create here,

20   the Yeshiva is consistently mentioned as the only

21   customer.

22               I reviewed over 667 pages. I filed with

23   Chris Kehoe, David Steinmetez, because I expected

24   him to be here tonight. And Laroue Shatzkin, I



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 15 Original page ↗

                                                            Page 15
1    March 3, 2026

 2   filed everything that I have given, that I have

 3   received. I have given it to the town as well as

 4   anybody who’s authorized me to email the

 5   documents to them. So the town, what they did in

 6   creating the sewer district and only doing so

 7   with public funds for the Yeshiva presents this

 8   establishment clause issue. I’m not even going to

 9   get into the merits because honestly, it seems

10   like no matter what anybody says or does, it

11   doesn’t matter, because everybody just wants to

12   go forward with this. And I think that’s

13   inappropriate.

14              I personally think Michael Cunningham,

15   copying Senator Harckham on correspondence, that

16   Michael Preziosi and Michael Cunningham were the

17   leads on what the town did, that Dr. Becker

18   started this whole thing in 2020 with a short

19   form EAF for a SEQRA, which was rejected. The

20   time, expense and money that has been put into

21   this, and there are documents from the county

22   legislators that says, the town has paid for all

23   of this, or gotten public grants from public tax

24   dollars.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 16 Original page ↗

                                                            Page 16
1    March 3, 2026

 2             So all of that, everybody can argue

 3   about the separation of church and state issue

 4   that is for a federal court determination in my

 5   experience as paralegal working with federal

 6   courts.

 7             The second thing that I want to bring up

 8   is that I think that I have more than established

 9   to the planning board and the town that there are

10   multiple acts of what is known as bad faith in

11   legal terms. There’s proof in the Department of

12   Health records that someone at the Yeshiva tried

13   to bribe a health inspector on February 1, 2024.

14   They are now going by the Yeshiva form

15   settlements since January of ‘25. You know,

16   they’re working in New Jersey and not having any

17   kind of real legal, from what I understand, legal

18   standing here in New York for operating while

19   they’re in New Jersey. The tax certificate I gave

20   to you guys, I’ve given this town a whole lot of

21   documents, well over a thousand pages at my own

22   expense. But I think that I have shown that for

23   the last, at minimum 15 years, and at least

24   almost 20, they have been incompetent in running



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 17 Original page ↗

                                                            Page 17
1    March 3, 2026

 2   their own property that has led to the pollution

 3   and the detriment of the community at large. Dr.

 4   Becker is well aware that people had to pay to

 5   install private aerators in lakes around their

 6   homes because of the pollution they were dumping.

 7            The Department of Health records bear

 8   out multiple violations, multiple agreements that

 9   they never stuck to. And when the Westchester

10   County Department of Health said that they had to

11   cease all actions in 2021 on that property, that

12   is when the town stepped in with the sewer

13   project that is almost identical to the one they

14   were trying to get approved with the Department

15   of Health prior. I think that speaks to their

16   very bad faith.

17            The issue of health inspector being,

18   attempting to be bribed, makes me have to wonder

19   who else have they bribed or tried to bribe. And

20   I’m not going to name names, but I have

21   suspicions, which is why I might suggest that

22   Michael Cunningham, and at least Michael Preziosi

23   recuse themselves from anything to do with these

24   projects immediately because there is more than



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 18 Original page ↗

                                                            Page 18
1    March 3, 2026

 2   just an appearance of impropriety, as well as

 3   that for Senator Harckham. He is central to any

 4   funding that has been given to the town.

 5            Taxpayer dollars have been used and will

 6   be used in the future for the sewer pump station.

 7   We’re paying for that, not them, we are. The

 8   value of the sewer district and the, and the

 9   value of our town has gone up, therefore, more

10   taxes to be collected. We are bearing that

11   expense because they’re getting the benefit of

12   all of that. This is truly upsetting. There are

13   plenty of people who are angry about it. And I

14   think I have demonstrated more than enough that

15   there is more than enough bad faith by all of

16   them to say that they are not deserving of any

17   consideration from this board for anything.

18            The other thing that I will bring up

19   here is that they keep classifying their

20   application as a type two proceeding or type two

21   action under SEQRA. On the research I have done,

22   because they are changing the use of student

23   dormitories for older buildings into private

24   residences, because they’re expanding the



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 19 Original page ↗

                                                            Page 19
1    March 3, 2026

 2   footprint of their sanctuary, because they’re

 3   putting up this new building and it encompasses

 4   more than 10 acres of land on their 37 acres,

 5   including the pathways, the walking pathways that

 6   have to be put in that was added as a result of

 7   concern for students’ safety. Because of all of

 8   these things affect more than 10 acres of land,

 9   at minimum, there should be a type one

10   proceeding, and I respectfully request the

11   planning board force them into a full

12   environmental review for all of these things.

13            Dr. Becker’s application in 2020 and Mr.

14   Preziosi’s in 2021 and in 2022, clearly it could

15   be argued that there were less than the truthful

16   answers to the application. The fact that the

17   authorization that the county legislators gave to

18   the town for authorization to use the sanitary

19   sewer district, the Peekskill one, the mere fact

20   that the town has not accounted for any sort of

21   calculation for whether or not the Peekskill

22   sanitary sewer district can handle any uptick

23   from these potential 130 homes is a big omission.

24   And to me, it it’s interpreted as this was only



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 20 Original page ↗

                                                            Page 20
1    March 3, 2026

 2   for the yeshiva. Even the authorization to use

 3   the Peekskill sanitary sewer district is solely

 4   for the yeshiva. And our public dollars have been

 5   used to accomplish this.

 6            With those arguments in mind, if anybody

 7   wants me to email everything to them directly

 8   instead of Chris Kehoe and Laroue Shatzkin, I

 9   will be happy to do so. I have literally

10   submitted over 1,000 pages of documents to you,

11   well, to the town. I don’t think they should be

12   allowed to do this, especially on the public dime

13   with the town’s consent. It is unfair to every

14   property owner in the district. It was unfair to

15   every property owner to create this Furnace Woods

16   sewer district when everybody else is on septic

17   just like they used to be.

18            And if I believe that there is talk

19   about court intervention, and I would hate to see

20   that play out with we have enough political angst

21   in the world right now. But I would request that

22   you respectfully, respectfully keep all of these

23   things that I have said in mind.

24            MR. KESSLER:        Can I ask you a question?



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 21 Original page ↗

                                                               Page 21
1    March 3, 2026

2                MS. COOK:       Of course.

3                MR. KESSLER:        You really want to leave

4    on the record the accusations you made about

5    certain people in the town?

6                MS. COOK:       I have said that --

7                MR. KESSLER:        Without, without any

8    proof.

 9               MS. COOK:       No, no, no, no. It’s based

10   upon what’s in the Department of Health records.

11   There are main players who are constantly

12   involved.

13               MR. KESSLER:        But you’re accusing them

14   of wrongdoing.

15               MS. COOK:       I have said that they should

16   recuse themselves because there’s, in my

17   estimation, more than just an appearance of

18   impropriety. But even an appearance of

19   impropriety would warrant at least recusing

20   themselves from anything further to do with this,

21   if anybody wants to seek court intervention,

22   especially or if there’s an investigation that

23   takes place. Whether Mr. Cunningham or anybody

24   else is directly involved, I can only go by



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 22 Original page ↗

                                                            Page 22
1    March 3, 2026

 2   what’s in the Department of Health records. And

 3   there’s a strong suspicion because Michael

 4   Preziosi and Mr. Cunningham are key players for

 5   what was done through the town and for the

 6   yeshiva.

 7              MR. KESSLER:      Okay. I gave you an

8    opportunity. Let me ask you another question.

9    You’ve been posting things on Next Door?

10              MS. COOK:     Yes.

11              MR. KESSLER:      I’m curious why you

12   consider the Yeshiva a cult.

13              MS. COOK:     Miriam Webster’s --

14              MR. KESSLER:      Yeah.

15              MS. COOK:     -- Definition of any

16   organized religion is defined as a cult.

17              MR. KESSLER:      Okay. Let me, let me read

18   you what the definition of a cult is, if you’ll

19   give me one --

20              MS. COOK:     Out of, if you would mind,

21   sir, out of which, out of which --

22              MR. KESSLER:      Wait, let me, let me, let

23   me you, you --

24              MS. COOK:     Okay.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 23 Original page ↗

                                                            Page 23
1    March 3, 2026

 2            MR. KESSLER:        You’re citing definition.

 3   A cult is generally defined as a social group

 4   with unorthodox, extreme or novel beliefs, often

 5   characterized by intense devotion to a

 6   charismatic leader, strict control and isolation

 7   from society. Historically, the term stems from

 8   Latin cultus, adoration and cultivation

 9   originally referring to a system of religious

10   worship, of rituals. Modern usage often implies

11   manipulative, coercive, or dangerous behaviors.

12   Is that what you’re claiming?

13            MS. COOK:       I would ask you to direct

14   your attention to the fact that women are

15   discriminated in their, in their practice of

16   religion. It’s their right to do so. But that

17   kind of fanaticism in this day and age for women

18   to not be educated on an equal level with men

19   goes towards that. And all the other words that

20   have commas in them. Fanatical, they exclude

21   everybody else. My definition that I got from

22   Merriam Webster dictionary is what I based the

23   word cult on.

24            MR. KESSLER:        Okay.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 24 Original page ↗

                                                            Page 24
1    March 3, 2026

 2            MS. COOK:       So I used a primary source.

 3            MR. KESSLER:          Okay. But you also then

 4   withdrew that comment in subsequent posts, did

 5   you not? Did you edit it out?

 6            MS. COOK:       No.

 7            MR. KESSLER:          No? Oh, okay. I just

 8   wonder if, you know, using that kind of language

 9   is, you know, creates --

10            MS. COOK:       I’m using that word based

11   upon a primary source, the Merriam Webster

12   dictionary.

13            MR. KESSLER:          Okay. All right, well

14   thank you for your comments.

15            MS. COOK:       Thank you.

16            MR. KESSLER:          Anybody else wish to

17   comment? [applause] Please, please, please.

18   Rather than applaud, why don’t you comment?

19   Anybody else wish to comment? Sure.

20            MR. JOHN MUELLER:          John Mueller 25

21   Lakeview Avenue West. I just want a

22   clarification. I’m, I’m not involved much, I

23   don’t do much reading or so, I just hear, you

24   know, it’s hearsay. But am I to believe that what



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 25 Original page ↗

                                                            Page 25
1    March 3, 2026

 2   I just heard here, that us taxpayers are paying

 3   for this sewer line for the yeshiva? Is that, is

 4   that true?

 5            MR. KESSLER:        My understanding that the

 6   sewer line was through a grant from the state? Is

 7   that correct?

 8            MR. MICHAEL CUNNINGHAM:             There are a few

 9   different grants. The only town funds, there was

10   500,000, because the pipe was upsized. So then

11   others along the route could connect. There’s

12   about 130 other parcels that could connect.

13            MR. MUELLER:        Yeah. But I’m

14   understanding that they cannot tie into it. So

15   $500,000 of our money went into the pipeline?

16            MR. KESSLER:        Any, anybody along the

17   sewer route is allowed to connect to the sewer.

18   They have to pay, admittedly, there’s a cost to

19   doing so. But as long as the sewer line runs in

20   front of their houses they are allowed to connect

21   to that sewer line. So it is a fact that there

22   are 130 homes that have the potential to connect

23   to that same sewer line that the yeshiva will be

24   connected to. It’s a question of whether they



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 26 Original page ↗

                                                               Page 26
1    March 3, 2026

 2   choose to and if they choose to pay the cost to,

 3   to provide that connection. The homeowner has to

 4   provide that, has to provide, has to pay for the

 5   connection.

 6               MR. MUELLER:        Okay. Thank you for the

 7   clarification.

 8               MR. KESSLER:        Okay. You’re welcome.

 9               MR. EDDIE TATLIAN:           Eddie Tatlian in

10   2146 Maple Avenue. So on that note where we’ve, I

11   know we’ve, I’ve been here before discussing the

12   cost of this and the costs are very astronomical.

13   And as --

14               MR. KESSLER:        I’m sorry, the cost of?

15               MR. TATLIAN:        The cost of tying into the

16   sewer.

17               MR. KESSLER:        Oh, yes.

18               MR. TATLIAN:        Okay, for a residence that

19   is along this pipeline. Okay. And it seems like,

20   like everybody’s been saying, we are the

21   taxpayers and $500,000 of our taxpayer money went

22   into the yeshiva. Where’s, where, where do we get

23   a break to tie into that line? We had no input on

24   the design of that, where it could have been



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 27 Original page ↗

                                                            Page 27
1    March 3, 2026

 2   designed a different way where it been more

 3   affordable for the people that live there to tie

 4   into. We had no say in that whatsoever. The cost

 5   to be what, what we have to pay for is just out

 6   of control. There are people whose their, their,

 7   their houses are, they distribute their, their

 8   their waste into their septic in the back of

 9   their homes, which is in downward position. So

10   they need, they need a pump from their house just

11   to get to the pump that they have to buy in the,

12   for the sewer system. So you say that we’re

13   allowed to tie into it, but at what cost? And why

14   don’t we get any break? And we’re the taxpayers

15   and they don’t pay any taxes. So how does that,

16   that even fair?

17            MR. KESSLER:        I mean, not, not to

18   minimize your, your concerns, but these are

19   really the town board issues. I mean, the town

20   board is the one that authorizes the sewer

21   district and, and the, of the sizes of that sewer

22   pipe. So why are, why isn’t there a member here

23   from that board during these meetings? Why do

24   our, our, our concerns get pushed to the side



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 28 Original page ↗

                                                            Page 28
1    March 3, 2026

 2            because they’re not here?

 3            MR. KESSLER:        Well, I mean, the sewer, I

 4   mean, that, that, that’s a done deal. I mean,

 5   that, that was done by the town board. We’re now

 6   here just to address their site plan, what they

 7   wish to do on their site in terms of, you know,

 8   building a dormitory and a and a number of other

 9   items there. You know, that’s our purview right

10   now. The sewer district is, is and, and and the

11   establishment of that district had nothing to do

12   with this board. So, you know, I hate to say it,

13   but the issues that you raise really belong with

14   the town board and not with this board.

15            MR. TATLIAN:        But it’s all tied into

16   this situation. It’s all tied into this.

17            MR. KESSLER:        Well --

18            MR. TATLIAN:        Without, without that

19   sewer, we wouldn’t be having these conversations

20   to begin with. That was, that’s what led us to

21   the, to the development of these buildings was

22   that sewer.

23            MR. KESSLER:        Yeah. And, and we’ve been

24   discussing that sewer for, I don’t know, 20



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 29 Original page ↗

                                                            Page 29
1    March 3, 2026

 2   years, 20 years now, this sewer has been an issue

 3   until it finally got approved by the town board.

 4   I mean, the site has always been problematic with

 5   their septic system. And the sewer was proposed,

 6   as I said, 20 years ago to alleviate that issue

 7   with their septic system. And now it’s finally

 8   come to fruition or close to it. And, you know,

 9   hopefully that will alleviate it. Now what we are

10   here to do is discuss what they want to what

11   they’re proposing in terms of, you know, know,

12   modifying their site to build a dormitory and

13   make enhancements to their other buildings. I

14   mean, that, that’s what we are here to decide on.

15            MR. TATLIAN:        And what, what about,

16   where do we find out about the road itself, about

17   them repairing the road back to its original

18   condition? Because I, I would like to know if

19   they’re going to do, if they’re going to remove

20   the asphalt that’s existing there, or they just

21   plan on going on top of it, because it’s already

22   been, already had a project done about 15 years

23   ago where they just went on top of it and keep

24   raising the, raising the elevation, raising the



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 30 Original page ↗

                                                            Page 30
1    March 3, 2026

 2   elevation.

 3            MR. KESSLER:        Right.

 4            MR. TATLIAN:        And, you know, the water

 5   that pools in front of people’s driveways and

 6   then freezes up in the wintertime is hazardous.

 7   So I want to know, you know, are they going to

 8   rip, rip out what’s there and reclaim that and go

 9   down to a, a better elevation? Or are they just

10   going to keep going on top --

11            MR. KESSLER:        Again, that’s a town board

12   issue. Now, the town board, when they meet, they

13   do have the, help me out here. I’m not so

14   familiar with their processes, but don’t they

15   have an open comment on their agenda at times at

16   the town board?

17            MR. KEHOE:       Well, they do. But also, you

18   know, the engineering department is overseeing

19   that construction project. So you could always

20   speak to the town engineer, Mike Preziosi.

21   Katie’s here. I don’t know if you’re comfortable

22   to speak on that, but the road will be redone.

23            MS. KATIE BROSNAN:           Sure. Hello, Katie

24   Brosnan, assistant civil engineer with the



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 31 Original page ↗

                                                            Page 31
1    March 3, 2026

2    engineering department. So typically, I can tell

3    you, I do a lot of water main jobs. This is

4    obviously sewer. But whenever we come through,

5    usually we wait a season and then we mill and

6    pave, we typically mill two inches and then pave

7    over that the whole width of the road. That’s

8    what we typically do for water main projects.

9    It’s my understanding that that’s what we’re

10   going to do for sewer, once it’s done. And we do

11   usually wait a season because we want the trench

12   to settle to make sure there’s no waves in the

13   pavement.

14               MR. TATLIAN:     Understood. So you are

15   milling?

16               MS. BROSNAN:     Yes sir.

17               MR. TATLIAN:     You are milling the whole,

18   the whole street.

19               MS. BROSNAN:     That is, that’s my

20   understanding.

21               MR. TATLIAN:     Curb to curb?

22               MS. BROSNAN:     That’s my understanding.

23               MR. TATLIAN:     Okay. Alright. Thank you.

24               MR. KESSLER:     Okay. Thank you. Thanks,



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 32 Original page ↗

                                                            Page 32
1    March 3, 2026

 2   Katie. Anybody else wish to comment on the

 3   application? Okay. Let’s talk, we had discussed

 4   this at the work session. So Brad, why don’t you

 5   come back up? One of the ma major concerns, I

 6   think was if this thing were to be approved, how

 7   this construction would be phased, you know, over

 8   what period of time, you know, how do you deal

 9   with a cafeteria that’s being fixed?

10            MR. SCHWARTZ:         Yep.

11            MR. KESSLER:        You know, while you have

12   students there, those kinds of things.

13            MR. SCHWARTZ:         Sure.

14            MR. KESSLER:        So why, can you discuss

15   that, please?

16            MR. SCHWARTZ:         So, Mr. Chairman,

17   candidly, I don’t have the answers to those

18   questions. I heard those questions. They’re very

19   fair ones. And, and then we just need to, I

20   think, supply that information to you, to your

21   board in terms of phasing sequencing. Certainly

22   the students will be fed. So the cafeteria, I’m

23   sure will be constructed appropriately with

24   respect to the, to the dorm. I just don’t, I



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 33 Original page ↗

                                                            Page 33
1    March 3, 2026

 2   don’t have that exact timing, but we’ll get you

 3   that information.

 4            MR. KESSLER:        And somebody else on the

 5   board raised the issue about, you know, how do we

 6   ensure that everything you say you’re going to do

 7   is going to be done as part of, you know, to

 8   complete this project. You know, the re-facing of

 9   the buildings and the building of the dormitory,

10   et cetera.

11            MR. SCHWARTZ:         So what’s shown on the

12   approved plans needs to be implemented. And then

13   the town, the building department has enforcement

14   authority over those plans. And I heard there was

15   some conversation about potentially tying CO to

16   those improvements, so I think that’s something

17   else that we could discuss going forward as

18   conditions in the resolution.

19            MR. KESSLER:        Comments from the board?

20            MR. BIANCHI:        I want to revisit what we

21   discussed I think at the last meeting regarding

22   the student population.

23            MR. SCHWARTZ:         Mm-hmm.

24            MR. KEHOE:       Make sure you use your mic.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 34 Original page ↗

                                                               Page 34
1    March 3, 2026

 2               MR. BIANCHI:        Is it on?

 3               MR. KEHOE:       Is it on?

 4               MR. BIANCHI:        I don’t think it’s on.

 5               MR. MCKINLEY:         Green, it’s got to go

 6   green.

 7               MR. BIANCHI:        How’s that?

 8               MR. KESSLER:        Yeah.

 9               MR. KEHOE:       Yeah.

10               MR. KESSLER:        There you go.

11               MR. BIANCHI:        All right. Yeah, I want to

12   revisit the discussion we had at the last meeting

13   regarding the student population. And from my

14   notes, it indicates that you are proposing when

15   and if the facility is constructed and amended

16   that you would house five students or people per

17   room and there are 64 rooms, which equals 320

18   student population, total population, right? Is

19   that correct if I say that? Total population or

20   just students?

21               MR. SCHWARTZ:         Correct.

22               MR. BIANCHI:        Which?

23               MR. SCHWARTZ:         Students, students.

24               MR. BIANCHI:        Students. Okay. And I just



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 35 Original page ↗

                                                            Page 35
1    March 3, 2026

 2   want to confirm, I think Mr. Steinzmetz indicated

 3   that he would, his, his client would agree to

 4   that as a cap.

 5             MR. SCWARTZ:       Right. While not legally

 6   required, Mr. Bianchi, our client is amenable to

 7   a student cap of 320 students.

 8             MR. KESSLER:       Okay. I thought we had

 9   conversations that, you know, the maximum allowed

10   is 320, but perhaps there’d be some lesser number

11   that would get approved. And if you wanted to

12   increase that number, you would come back and

13   make that request.

14             MR. SCHWARTZ:        So I am covering for, for

15   David tonight. I heard that that was a

16   conversation, but again, our voluntary suggestion

17   is a 320 cap and, and how that condition in the

18   resolution gets fleshed out and finalized is

19   something that I think we’ll be happy to continue

20   talking to the board and staff in the ensuing

21   months.

22             MR. KESSLER:       Yeah. I think, you know,

23   the thinking, at least my thinking, I can’t speak

24   for the board obviously you know, is that, you



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 36 Original page ↗

                                                               Page 36
1    March 3, 2026

 2   know, if we’re talking about four people to a

 3   room, that should be the initial cap. And if you

 4   then come want to increase that to five people

 5   per room, you would come back and make the case

 6   for that.

 7               MR. SCHWARTZ:         I think that’s --

 8               UNIDENTIFIED MALE:           That’s correct.

 9               MR. SCHWARTZ:         I think that’s, that’s an

10   on, that’s an ongoing discussion

11               UNIDENTIFIED MALE:           Yes.

12               MR. KESSLER:        I know. I said it.

13               UNIDENTIFIED MALE:           I want him to know.

14               MR. KESSLER:        Oh, okay. I’m sure he

15   knows.

16               UNIDENTIFIED MALE:           It doesn’t sound

17   like it.

18               MR. KESSLER:        Well.

19               MR. SCHWARTZ:         Again, Mr. Chairman, the

20   details of that condition can be fleshed out. Our

21   offer remains the 320. Again, we submitted a

22   letter that frankly sets forth what we believe is

23   the legal standards that no cap is required and,

24   and can be required by your board. But



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 37 Original page ↗

                                                            Page 37
1    March 3, 2026

 2   voluntarily we offer the 320. If you’re thinking

 3   a different number, that’s a conversation that we

 4   can continue to have.

 5            MR. KESSLER:        And we will have that

 6   conversation, absolutely.

 7            MR. BIANCHI:        Just to follow up on that,

 8   what’s the number of non-students that are going

 9   to be housed there approximately?

10            MR. SCHWARTZ:         I’ll get you that answer

11   as well. I don’t know.

12            MR. KEHOE:       While, while they’re looking

13   for that, Tom, one thing that the attorney wanted

14   to make clear that. Within the architect’s

15   building elevations and floor plans they now

16   clearly depict what a four-bedroom unit would

17   like look like and what a five-bedroom unit would

18   look like. And they did that in general, but

19   partially in response to some of your comments.

20            MR. BIANCHI:        Okay.

21            MR. KEHOE:       So they wanted to make it

22   clear that in those drawings they do show what a

23   five-bedroom unit would look like.

24            MR. KESSLER:        My understanding from the



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 38 Original page ↗

                                                            Page 38
1    March 3, 2026

 2   last meeting was that they said there were 75

 3   additional, 75 additional people beyond the

 4   student population. That’s what my notes say

 5   currently.

 6            MR. SCHWARTZ:         I’ll have to verify that.

 7            MR. KESSLER:        Okay.

 8            MR. CHRIS LAPINE:           Mr. Chairman, their

 9   plans show up to 86 on their bulk table.

10            MR. KESSLER:        Okay.

11            MR. BIANCHI:        I’m sorry, 86?

12            MR. LAPINE:        Eighty-six on their bulk

13   table of staff and family members.

14            MR. BIANCHI:        Thanks.

15            MR. KESSLER:        All right, any other

16   comments from the board?

17            MR. ROTHFEDER:         And just that, as I

18   brought up about the work session, and I actually

19   mentioned it to David informally last month,

20   about the green building technology, which again,

21   has been in the, discussed since last July.

22   Westchester Planning Board brought it up, we

23   brought it up, and nothing’s been done.

24            MR. SCHWARTZ:         So I’ve talked to our



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 39 Original page ↗

                                                            Page 39
1    March 3, 2026

 2   client about that. They’re continuing to evaluate

3    Mr. Rothfeder. And so again, that could be

 4   continued to be explored and evaluated in the

 5   next couple of months. But they have not

 6   forgotten about that comment and the yeshiva is

 7   looking into it. We heard you on that one.

 8            MR. ROTHFEDER:         Thank you.

 9            MR. KESSLER:        Kellan?

10            MR. CANTRELL:         Yeah. I just have a

11   couple of questions about the wetland area. So

12   how much of the wetland are you disturbing in

13   square feet?

14            MR. SCHWARTZ:         So, Mr. Cantrell, what

15   I’m going to do is, is defer to Mr. Marino, our

16   wetlands --

17            MR. KEHOE:       Yeah. I’d like, I’d like to

18   actually, if, if it’s all right to have you make

19   sort of a formal presentation to remind us of

20   where we are with the wetlands and the DEC.

21            MR. STEVE MARINO:          Sure. Okay. good

22   evening. Steve Marino, Tim Miller Associates. As

23   you know, there are wetlands on the site that are

24   regulated both by the town and by New York State



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 40 Original page ↗

                                                            Page 40
1    March 3, 2026

 2   DEC. Those lines are not co-terminus, we ended up

 3   with two separate lines. DEC delineated, the

 4   official delineation for DEC is based on historic

 5   delineation that was done about 20 years ago by

 6   Steve Coleman. Paul Jaehnig has recently gone out

 7   to the field on behalf of the town, as the town’s

 8   consultant and flagged the wetland, which in, in

 9   his opinion, that’s a different and slightly

10   smaller line than the DEC line. So there are two

11   lines that we’re working with.

12              At this time, there is no impact to the

13   DEC wetland based on previous discussions and my

14   discussions with the DEC. A retaining wall has

15   been built at the edge of the existing parking

16   lot or is proposed to the edge of the existing

17   parking lot, which will then bring that

18   disturbance outside of the DEC wetland. So there

19   is no DEC wetland disturbance. There is a a minor

20   encroachment into the town wetland disturbance in

21   an area in town wetland in an area that is

22   currently maintained and has been for many years

23   as lawn.

24              The majority of the wetland area,



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 41 Original page ↗

                                                            Page 41
1    March 3, 2026

 2   anywhere in close proximity to the existing

 3   parking and buildings has been maintained as lawn

 4   for many years. So there is some encroachment

 5   into DEC and town buffers. We cover that. We did

 6   provide a wetland narrative and description of

 7   the wetland as well as of the disturbances to

 8   both town and DEC wetlands as part of our recent

 9   submission. There is buffer encroachment.

10            I had a sit down with the DEC and in New

11   Paltz, went over the plans with them as they

12   existed at that time. Their only comment was that

13   they would like to see the disturbance that we

14   had previously proposed in the wetland taken out

15   of the wetland so that there’s no wetland

16   disturbance. They’re well aware of the disturbed

17   nature of the site, the amount of impervious

18   parking lots and buildings, et cetera, that

19   already exist in the state buffer. But they did

20   have the comment please pull that parking area

21   out of the wetland. And Mr. Ciarcia has revised

22   the plans. This most recent submission now shows

23   all disturbance outside of the wetland. That was

24   the only significant comment that the DEC had.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 42 Original page ↗

                                                            Page 42
1    March 3, 2026

 2               MR. KESSLER:     So you’re saying that

 3   there is now no disturbance in the buffer as

 4   defined by the DEC?

 5               MR. MARINO:     No, there’s no, no. There’s

 6   no disturbance in the wetland.

 7               MR. KESSLER:     In the wetland?

 8               MR. MARINO:     As defined by the DEC.

 9               MR. KEHOE:     And is that in the, the sort

10   of the turnaround area down below the building in

11   the gray?

12               MR. MARINO:     Right, exactly.

13               MR. KEHOE:     Right.

14               MR. MARINO:     Yep.

15               MR. SCHWARTZ:      It’s for the fire --

16               MR. LAPINO:     Is the DEC wetland or the

17   town wetland?

18               MR. MARINO:     Both. Both. The most, the

19   area of largest wetland and buffer disturbance is

20   for the creation of this new fire access, fire

21   truck turnaround in the southwest corner of the

22   property. You can see it. It’s shown on the

23   graphic that’s shown right now, it’s that gray

24   gravel, which is proposed to be a gravel or



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 43 Original page ↗

                                                            Page 43
1    March 3, 2026

 2   pavers area for the turnaround of the fire

 3   access.

 4             MR. LAPINE:       Steve?

 5             MR. MARINO:       Yes?

 6             MR. LAPINE:       Can I ask you a quick

 7   question? I know we had met in early February and

 8   you were going to seek documentation from the

 9   DEC? Is what --

10             MR. MARINO:       And we’re expecting it

11   anytime. I didn’t get it today. I expected to.

12   Sarah Pawliczak of the DEC is the person I sat

13   down with and went over the plans. She said she

14   would send us something, because I did make the

15   point to her that the town would like to get some

16   correspondence and I expect it any time.

17             MR. LAPINE:       So the feedback you’re

18   giving us tonight is based on your conversations

19   with her. So the current plans --

20             MR. MARINO:       Conversations, phone calls,

21   like I say, sit down, but I don’t have anything

22   in writing just Yet.

23             MR. LAPINE:       So, the current plan that’s

24   before the board where there is some compensatory



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 44 Original page ↗

                                                              Page 44
1    March 3, 2026

 2   excavation within a DEC wetland, that’ll be --

 3              MR. MARINO:        Yes. That’s also, yes --

 4              MR. LAPINE:        That’ll be revised and the

 5   grading taken out?

 6              MR. MARINO:        No, the, well, okay, Chris,

 7   that’s a good point. The, there is disturbance in

 8   the DEC wetland for the floodplain compensation,

 9   but they didn’t really look at that in terms of a

10   disturbance rather than a remodel, remolding and

11   replanting of that area.

12              MR. LAPINE:        Okay.

13              MR. MARINO:        So yes, that is, that was

14   included in our discussion with that. They’re

15   well aware of all these things that are going on.

16              MR. KESSLER:        So the DEC has no concern,

17   you’ve taken the disturbance from the wetland

18   area to the satisfaction of DEC?

19              MR. MARINO:        Yes. That’s my

20   understanding. And we’re still waiting to hear

21   that.

22              MR. KESSLER:        Are they comfortable with

23   your disturbance in the buffer?

24              MR. MARINO:        Yes. Yes.



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 45 Original page ↗

                                                            Page 45
1    March 3, 2026

 2            MR. KEHOE:       And they need --

 3            MR. KESSLER:        That’ll also be in the

 4   correspondence?

 5            MR. MARINO:        That will also be in the

 6   correspondence. That was also, I, just so I can

 7   make it very clear. I went to DEC with the plan

 8   as it existed in December of 2025. That was the

 9   last plan that had been submitted. I sat down

10   with them and discussed that plan. Their only

11   comment on that plan was, can you get the

12   disturbance out of the wetland entirely? And so

13   we subsequently revised the plan. I sent that to

14   the DEC. She got back to me saying that that was

15   okay, but I’m just waiting for written

16   correspondence.

17            MR. KESSLER:        So, and these, these are

18   the plans dated February 18th that show that?

19            MR. MARINO: Yes.

20            MR. KEHOE:       And, and you will need a DEC

21   permit for the --

22            MR. MARINO:        We will need a DEC, we’ll

23   have to go, and, and I made this very clear when

24   I talked to Sarah at the DEC, we didn’t, we don’t



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 46 Original page ↗

                                                            Page 46
1    March 3, 2026

 2   take anything she says right now as a permit, as

 3   an absolute endorsement of the project, just I

 4   wanted some immediate feedback that we’re on the

 5   right track and that we will be presenting them

 6   with an application for a permit, and we will be

 7   going through a full permit review with the DEC.

 8            MR. KEHOE:       Can you just explain your

 9   experience? We have typically conditioned our

10   approvals on the ultimate issuance of the DEC

11   permit. There are --

12            MR. MARINO:        It makes sense.

13            MR. KEHOE:       -- there are other views

14   that the DEC permit should be in place first. My

15   impression is that the DEC probably won’t issue

16   the permit until they know where the town stands.

17            MR. MARINO:        Right. Well, for one thing,

18   they can’t issue the permit until a SEQRA

19   determination has been made.

20            MR. KEHOE:       So, if the town, if the

21   planning board did it differently and made a

22   SEQRA determination earlier in the process, which

23   isn’t our normal way of doing it, we make the

24   SEQRA determination at the end of the process,



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 47 Original page ↗

                                                            Page 47
1    March 3, 2026

 2   then they could issue the permit because SEQRA

 3   would’ve been closed.

 4            MR. MARINO:        In advance of that, yes.

 5   Okay. We just prefer, generally Chris, not to do

 6   it that way, because if there are then plan

 7   changes, it goes back that it has to go back to

 8   the DEC, then it goes back to the town. It, it

 9   makes it more difficult. So we’d like to have a

10   final plan from the, from the town before we go

11   to them with the --

12            MR. KEHOE:       But that, but that’s an

13   important nuance. And maybe that is we don’t

14   typically adopt findings in environmentally, sort

15   of close SEQRA, earlier in the process, which is

16   what SEQRA wants you to do sometimes. So maybe

17   that’s one of the reasons why historically we’ve

18   always conditioned the permit.

19            MR. MARINO:        If we don’t get, get the

20   permit from the DEC or there are changes to the

21   plan based on our application to the DEC, we

22   would have to come back to the board to finalize,

23   you know, those changes and details.

24            MR. KEHOE:       Alright, Kellan.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 48 Original page ↗

                                                            Page 48
1    March 3, 2026

 2            MR. KESSLER:        And and, and --

 3            MR. KEHOE:       Sorry.

 4            MR. CANTRELL:         Yeah, no, I, I’ve gotten

 5   permits in Greenburgh and Scarsdale before and

 6   we’ve done it the opposite. That’s just, that’s

 7   my experience. Have you, have you ever had it the

 8   opposite way, where you’ve gotten the DEC permit

 9   and then gotten the local permit?

10            MR. MARINO:        On larger projects like

11   this when there’s a full SEQRA review, we

12   generally --

13            MR. CANTRELL:         Full SEQRA, like a short

14   environmental assessment or a full EAF?

15            MR. MARINO:        Well, well, we’re going,

16   basically we’re going through a part three

17   essentially right now, the long form EAF. And DEC

18   won’t, will not issue their permit until we have

19   a SEQRA determination, which in Cortlandt, as

20   Chris mentioned, tends to come at the end of the,

21   of the process.

22            MR. CANTRELL:         Maybe I’ve been working

23   with someone else, I don’t know. It could be.

24            MR. KESSLER:        And just also, I don’t



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 49 Original page ↗

                                                            Page 49
1    March 3, 2026

 2   know, we got this Chris, I don’t know who wrote

 3   this. I don’t know if this is Jaehnigs or

 4   whomever. But there’s also a reduction in

 5   impervious surfaces?

 6            MR. MARINO:        Yes. There’s a reduction of

 7   about 4,000 square feet in impervious surface in

 8   the buffers.

 9            MR. KESSLER:        In the buffers?

10            MR. MARINO:        In the buffers, yeah. I,

11   just as a reminder, at one point, you know, the

12   sanctuary building there on the south end of the

13   building was at one time proposed to be extended

14   about 85 feet --

15            MR. KESSLER:        Right.

16            MR. MARINO: -- out. That would’ve been

17   significantly in the DEC buffer, that would’ve

18   been right up against the edge of the wetland. As

19   you know, that was removed and the sanctuary

20   improvements have now been installed inside the

21   new building.

22            MR. KESSLER:        Right.

23            MR. MARINO:        So that that disturbance is

24   not necessary. And as part of our submission, we



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 50 Original page ↗

                                                            Page 50
1    March 3, 2026

 2   also have a long list, there’s a diagram and a

 3   long list of mitigation measures that are

 4   proposed to offset some of these new buffer

 5   impacts. But again, historically, for more than

 6   40 years, most of the impacts in the buffers on

 7   this site have existed and this is more

 8   redevelopment than anything else.

 9            MR. LAPINE:        I just had a question about

10   how you chose the mitigation site. Does it

11   connect to the existing system?

12            MR. MARINO:        Yes, it does.

13            MR. LAPINE:        It does.

14            MR. MARINO:        Yes, it does.

15            MR. LAPINE:        And then that, so the way

16   that I’m looking at it on the site plan up here,

17   the grade kind of goes down towards the

18   buildings, right? So the grade to the right

19   slopes downward towards --

20            MR. MARINO:        Not really towards the

21   buildings. You can see that there’s that long

22   finger that goes up there, which is that black

23   line, that’s the DEC wetland. And water, the

24   grade flows in that direction.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 51 Original page ↗

                                                            Page 51
1    March 3, 2026

 2            MR. LAPINE:        Towards the wetland?

 3            MR. MARINO:        Towards the wetland.

 4            MR. LAPINE:        There’s like a wetland you

 5   know, connection there to other wetlands and

 6   then, yeah.

 7            MR. MARINO:        Yes.

 8            MR. LAPINE:        And then the trail, what is

 9   that going to be made of? Just wood chips?

10            MR. MARINO:        Wood chips, yeah. And that

11   we, I spoke to DEC, I brought that up as well,

12   because they’re aware of that. The trail is about

13   a half mile long. And, and as you know, it’s, it

14   was proposed in response to neighbor concerns

15   about students walking on the road. We wanted to

16   give them another option on site to walk. So

17   we’re proposing a four foot wide, we had

18   originally said four to six foot wide wood chip

19   trail from the building, looping around, crossing

20   the watercourse down there in the western part of

21   the site, coming back around and back to the

22   building again. It’s about half a mile long. DEC

23   prefers four feet wide for a wood chip trail

24   rather than going six feet wide. So we’ve revised



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 52 Original page ↗

                                                              Page 52
1    March 3, 2026

 2   it to be a four foot wide trail.

 3              MR. LAPINE:        No trees are to be removed?

 4              MR. MARINO:        No trees, because with a

 5   wood chip trail, you can, you know, move in and

 6   out of existing trees and not have to take any

 7   down.

 8              MR. LAPINE:        Thank you.

 9              MR. KESSLER:        Any more comments?

10              MR. KEHOE:       Just, just one other thing.

11              MR. KESSLER:        Yeah.

12              MR. KEHOE:       As this is getting fleshed

13   out, you have mentioned in recent correspondence

14   with respect to parking. Parking had never really

15   been an issue on this site in the past, but you

16   brought up that an interpretation of the yeshiva,

17   a seminary special permit would require a certain

18   number of parking spaces, which would over park

19   the site. And you’ve mentioned that the planning

20   board has the ability to waive that parking.

21              MR. MARINO:        Yes.

22              MR. KEHOE:       But you also mentioned that

23   the parking can be land banked on the site?

24              MR. MARINO:        We do have there, yes.



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 53 Original page ↗

                                                            Page 53
1    March 3, 2026

 2            MR. KEHOE:       You would need to reflect

 3   that on a future plan of where that, you don’t

 4   have to design it, but that needs to be shown

 5   where it’s going to be on the plan.

 6            MR. MARINO:        I know that we did describe

 7   it as there’s an existing concrete slab on the

 8   site that was historically the site of a barn. It

 9   remains on site and has been used, again

10   historically, as overflow parking when necessary

11   a couple times a year for holidays. And then

12   there are also basketball courts immediately

13   adjacent to that slab that can also be used as

14   overflow parking when necessary. But again, as

15   Chris said, historically, there, there aren’t

16   that many vehicles coming and going from the site

17   so parking has never been an issue.

18            MR. KEHOE:       I just want to mention one

19   other thing. Brad, could you address the type two

20   comment? I think some of the type two issues have

21   to do with respect to maybe bureaucratic

22   regulations with respect to district formation or

23   something having to do with the sewer, because

24   we’re not processing this application as a type



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 54 Original page ↗

                                                               Page 54
1    March 3, 2026

 2   two action. This is a long form EAF unlisted

 3   action.

 4               MR. SCHWARTZ:         That’s my understanding,

 5   Mr. Kehoe. And, and I think the comment was with

 6   respect to this application, I think that comment

 7   was incorrect. This is not being treated as a

 8   type two.

 9               MR. KESSLER:        Any more comments from the

10   board?

11               MR. BIANCHI:        Just a clarification, on

12   the January narrative that you supplied for the

13   application for a town wetland permit, you

14   mentioned that there’s a reduction in the

15   impervious service, this is for Dan. And so

16   there’s a table in there that lists several

17   figures regarding proposed, existing impervious

18   surface and proposed wetlands disturbance and

19   proposed buffer disturbance. Have those numbers

20   changed with any of the architecture and

21   modifications to the building?

22               MR. MARINO:        No. Not, no. I believe what

23   you’re reading is the most recent submission. So

24   that would be the numbers that are reflected by



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 55 Original page ↗

                                                               Page 55
1    March 3, 2026

 2   the --

 3               MR. KESSLER:        Well, I mean, this, this

 4   what, what Mr. Bianchi’s referring to is a

 5   January 24th letter we received. I don’t know who

 6   wrote it.

 7               MR. BIANCHI:        Yeah, that’s right. Yeah.

 8               MR. KESSLER:        But, you know, yet your

 9   plans, the latest plans of February, what did I

10   say 18th? So I think Tom’s question is

11   appropriate here. You know, do the 18th --

12               MR. MARINO:        Okay. I will double check

13   that. I mean, Dan and I have been working very

14   closely on the development of the plans and, and

15   wetland impacts. I may have had some information

16   earlier --

17               MR. KESSLER:        Okay.

18               MR. MARINO -- then the actual plans were

19   filed.

20               MR. KESSLER:        You, you submitted this?

21   Is this yours?

22               MR. MARINO:        Is it basic wetland

23   narrative and --

24               MR. KEHOE:       Yeah, that’s a detailed



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 56 Original page ↗

                                                              Page 56
1    March 3, 2026

 2   wetland narrative dated January 24th. And I think

 3   the concern is that the drawings are now dated

 4   February 18th.

 5              MR. LAPINE:        For, for the board

 6   understanding the most recent storm water

 7   pollution prevention plan that was submitted, the

 8   increase in onsite impervious for the total site

 9   is 10,000 square feet. I think what Mr. Marino’s

10   been referring to in terms of the reduction in

11   impervious area is the reduction of impervious

12   area, which was in the town wetland buffer

13   before.

14              MR. MARINO:        In the buffers, yes.

15              MR. KESSLER:        The wetlands and the

16   buffers?

17              MR. MARINO:        Thank you, Chris.

18              MR. KESSLER:        That’s what the table

19   says. Okay. Well just --

20              MR. MARINO:        Yeah, we will double check

21   to make sure that’s still consistent with that

22   plan.

23              MR. KESSLER:        -- that it’s consistent

24   with the current plans.



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 57 Original page ↗

                                                               Page 57
1    March 3, 2026

 2               MR. MARINO:        But like I said, I was

 3   working with him, I had those numbers while he

 4   was tweaking other things on the plan, so.

 5               MR. BIANCHI:        All right. Thank you.

 6               MR. KESSLER:        All right, last --

 7               MR. TATLIAN:        And just for the board’s

 8   reference --

 9               MR. KESSLER:        -- yeah, sure. Any more

10   public comment before we figure out what to do

11   here.

12               MR. TATLIAN:        So through a couple of

13   meetings I’ve been through, I realized that the

14   wetlands area has decreased. Am I correct in

15   that? From what it used to be? Wasn’t there a map

16   that showed the wetlands a certain size and a

17   decrease? Okay. And how and when was that, that

18   last site survey done to show the decrease in

19   there?

20               MR. KESSLER:        Let’s let the expert

21   comment.

22               MR. MARINO:        The town’s consultant, Paul

23   Jaehnig, delineated the wetlands at the end of

24   2025, and the survey was done December, October,



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 58 Original page ↗

                                                            Page 58
1    March 3, 2026

 2   in November, December of 2025. So the red line

 3   that you see there is the most recent, oh no,

 4   that’s the floodplain line. There is, like I

 5   said, there are two wetland lines on the plan. It

 6   may not show up at this scale, but there’s two

 7   wetland lines. One is the town’s line, but they,

 8   they are the recent lines. DEC was out there with

 9   me early last year and Paul Jaehnig did the

10   town’s line towards the end of last year.

11             MR. KESSLER:       All right.

12             MR. TATLIAN:       So is it, is it true to

13   say that the weather patterns we’ve had these

14   past few years might’ve lent to that? Now here we

15   have two, two storms with about almost two feet

16   of snow that we received this winter, which we

17   haven’t seen that in many, many years, probably

18   20 years. If we were to do a site survey after

19   this winter, would this, would this map change?

20             MR. MARINO:       No, it wouldn’t change, I

21   mean --

22             MR. TATLIAN:       Why not?

23             MR. MARINO:       Well, Mr. Jaehnig

24   specifically does his wetland delineation



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 59 Original page ↗

                                                            Page 59
1    March 3, 2026

 2   primarily based on soils. And soils take a long

 3   time to change. So one wet winter, a couple of

 4   wet seasons, a couple of dry seasons don’t change

 5   the soil types significantly enough that that’s

 6   something that really changes.

 7            MR. TATLIAN:        So, so --

 8            MR. MARINO:        We don’t, we don’t re-

 9   delineate wetlands every year. Generally, it’s a

10   10-year limit on 10-year expiration on wetland

11   delineations.

12            MR. TATLIAN:        Well, what if we’re going

13   into another 10 years of, you know, the old

14   fashioned New York winters like we’ve had all of

15   our lives growing up and it’s just been recently

16   that we haven’t had these winters.

17            MR. MARINO:        Well, the only thing to say

18   to that is what if we don’t? So I, I don’t know

19   the answer.

20            MR. TATLIAN:        Well then maybe, maybe the

21   line shouldn’t be changing. Maybe they shouldn’t

22   be changing. I think it’s something to consider

23   and maybe there should be an average taken where,

24   you know, we’re, we’re, we’re pulling everything



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 60 Original page ↗

                                                            Page 60
1    March 3, 2026

 2   back so quickly and so much, and maybe, maybe we

 3   need to have more of a buffer there because I

 4   can’t imagine what’s going to happen after the

 5   snow melts and who knows how much more snow we’re

 6   going to get this year or the next 10 years. We

 7   don’t know that.

 8            MR. KESSLER:        Point noted, Thank you.

 9   Last, again, last call for the public? Staff?

10   Board? All right, so let, let’s discuss process

11   and how we proceed here. Our thinking is now that

12   this is, what our third public hearing?

13            MR. SCHWARTZ:         Correct.

14            MR. KESSLER:        That, you know, we’ve

15   heard from the public. and we’ll take that under,

16   all under consideration, that we close the public

17   hearing, but clearly we want to keep the record

18   open here for at least, I’m thinking almost 45

19   days for the public to continue to comment. Now,

20   just because the public hearing is closed, that

21   doesn’t mean we’re making a decision. There’s

22   still a lot of work to be done with the, with the

23   staff, engineering and others to flesh out a lot

24   of the issues that still exist with the layout of



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 61 Original page ↗

                                                            Page 61
1    March 3, 2026

 2   the plan. So with your approval, we’d like to,

 3   you know, once we close the public hearing, we

 4   have a requirement, a state requirement that we

 5   have to make a decision in 62 days, this board.

 6   We do not want to do that. So we need the

 7   applicant to grant us an extension of that 62 day

 8   period for us to go through all the information

 9   and for staff, as I said, to continue to work out

10   the details of the proposal. So, Brad, with, with

11   your, you know, we will close the public hearing

12   if you give us permission to extend that 62 day

13   clock until some point where we decide it’s ready

14   to come back to the board for discussion. And,

15   and as was said during the meeting, you know,

16   there’s still points that we have to discuss in

17   terms of student camp and other things, and the

18   designation of exactly what’s going to happen in

19   each of the buildings, those kinds of things. And

20   this board will certainly do that and come to

21   hopefully some agreement with the applicant on

22   those issues. So, if we do close the public

23   hearing, do you agree to grant an extension of a

24   62 day clock?



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 62 Original page ↗

                                                            Page 62
1    March 3, 2026

 2            MR. SCHWARTZ:         We absolutely grant and

 3   consent to the extension.

 4            MR. KESSLER:        Okay.

 5            MR. SCHWARTZ:         I heard the comment at

 6   the works extension about in perpetuity, and if

 7   that’s the board’s desire, you got it. As a

 8   matter of practice, I, we typically extend to

 9   some period of time. So understanding that the

10   board needs a good amount of time, I would

11   suggest six months, I think would be fair and

12   reasonable, but I defer to the board as to --

13            MR. KESSLER:        I’m sure it’s going to be

14   a reasonable amount of time.

15            MR. SCHWARTZ:         Yeah.

16            MR. KESSLER:        I just, you know, we just

17   want to make sure everybody has enough time to

18   look this over and for you to respond to the

19   issues. I mean, we’ve had, I don’t know how many

20   revisions now, we’ve had now five revisions to

21   the plan to date, in the last, last 11 months. So

22   clearly this back and forth work with staff and

23   the board and, and the applicant is important

24   work to be done. So, you know, it, it’s not



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 63 Original page ↗

                                                            Page 63
1    March 3, 2026

 2   unusual for there to be continuing, continuing

 3   amendments to the plan, to the to the plat. So if

 4   there’s no --

 5            MR. KEHOE:       And also the extension of

 6   the public comment period.

 7            MR. KESSLER:        Oh, yes, yes. Well, we’ll

 8   make that part of the part of the motion, which

 9   is going to be done by Kevin.

10            MR. KOBASA:        I’d like to make, make a

11   motion to close the hearing.

12            MR. KESSLER:        Oh, sure. Yeah. Okay.

13            UNIDENTIFIED MALE:           I just got kind of a

14   --

15            MR. KESSLER:        Before we close it,

16   absolutely.

17            UNIDENTIFIED MALE:           This new

18   construction, is this building just for students

19   and staff or, because I heard something in the

20   pipe that it’d be for families or --

21            MR. KESSLER:        There are a number of

22   buildings on the campus. The, the proposed

23   dormitory is just for students and they are,

24   they’re what’s the word, they’re rehabilitating



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 64 Original page ↗

                                                             Page 64
1    March 3, 2026

 2   the other buildings and repurposing the other

 3   buildings for staff, weekend visitors, those

 4   kinds of things.

 5             UNIDENTIFIED MALE:           Okay. So no, no

 6   permanent families --

 7             MR. KESSLER:        For the rabbi and --

 8             UNIDENTIFIED MALE:           Right. Right.

 9             MR. KESSLER:        -- and such.

10             UNIDENTIFIED MALE:           Okay.

11             MR. KESSLER:        So, yes, but to answer

12   your question, the proposed dormitory is just for

13   students. They proposed four beds per room

14   initially, which would mean 256 students. And

15   they would like the potential to put five beds in

16   a room, which would meet 320 students.

17             UNIDENTIFIED MALE:           Okay.

18             MR. KESSLER:        And that’s what we’re

19   going to be discussing with them in terms of a

20   cap.

21             UNIDENTIFIED MALE:           Thank you very much.

22             MR. KESSLER:        Okay.

23             MR. TATLIAN:        There’s also for teachers

24   families to live there, aren’t there?



                        Geneva Worldwide, Inc.
            228 Park Ave S - PMB 27669. New York, NY 10003

Page 65 Original page ↗

                                                            Page 65
1    March 3, 2026

 2               MR. KOBASA:     Yes.

 3               MR. KESSLER:     There are other buildings,

 4   as I said, there are buildings that are going to

 5   be used for staff, office, weekend and staff,

 6   there’s one building for two families, there’s

 7   the sanctuary, the dorm, some storage areas. Yes.

 8   The, there, there are a total of eight buildings

 9   on the site. The one new one will be the

10   dormitory. The others will be repurposed for

11   various uses. That, that’s the proposal.

12               MR. KEHOE:     And, and the repurposing is

13   specifically called out in building floor plans

14   exactly what can happen in each room, in each

15   building.

16               MR. KESSLER:     Right.

17               MR. LAPINE:     Mr. Chairman they didn’t

18   make a on a record, I forgot which particular

19   meeting, but some of these staff are married and

20   both themselves and their partner, their wives

21   will also be residing on campus. And if they had

22   a child, they would also be living in those units

23   that are being repurposed for them.

24               MR. KESSLER:     Thank you.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 66 Original page ↗

                                                            Page 66
1    March 3, 2026

 2            MS. COOK:       Hi. Sorry.

 3            MR. KESSLER:        That’s okay.

 4            MS. COOK:       Thank you for a reminder. I

 5   did put in further FOILS with the DEC,

 6   Environmental Facilities Corporation, Departments

 7   of Agriculture and Markets, and a couple of

 8   others for documents that showed up in the

 9   Department of Health records. Just, I will

10   provide whatever I get to the town

11            MR. KESSLER:        Okay.

12            MS. COOK:       And I’m sure there are a lot

13   of people who want discuss it.

14            MR. KESSLER:        In the motion that we’re

15   about to make, we’re going to keep the period

16   open for, I think until, what do we say? May

17   15th. So May, you’ll have until May 15th from the

18   time we close the public hearing tonight to

19   submit whatever information you think is relevant

20   for our deliberations.

21            MS. COOK:       I appreciate that, Mr.

22   Kessler. Thank you.

23            MR. KEHOE:       And also, along those lines,

24   what I received today from you will be directly



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 67 Original page ↗

                                                            Page 67
1    March 3, 2026

 2   provided to all of the planning board members.

 3             MS. COOK:      That’s cool. I really think

 4   we’re spinning our wheels here and a lot of

 5   people feel that way. It’s sad that we have to

 6   get to this particular point, but I bear no

 7   particular personal ill will against anybody or

 8   any entity in general. I moved into this

 9   neighborhood for a reason, but this particular

10   situation has become questioning, challenging and

11   it’s made me wonder whether or not I’m going to

12   live here and who might be voted out the next

13   time the elections come around. It’s very

14   upsetting. That’s not intended as a threat

15   either.

16             MR. KESSLER:       I understand. Thank you.

17             MS. COOK:      Have a good day, evening.

18             MR. KESSLER:       Alright Kevin, we were in

19   the process --

20             MR. KOBASA:       I think there’s one more.

21             MR. KESSLER:       Oh, I’m sorry. Another,

22   one more comment. I’m sorry. We’ll get there.

23             MR. STEVE ROTOLO:         Thank you for hearing

24   me out. Steve Rotolo, 50 Lakeview Avenue. I don’t



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 68 Original page ↗

                                                            Page 68
1    March 3, 2026

 2   think that we should be closing this particular

 3   public hearing at this point in time. There’s a

 4   multitude of issues that have not been answered,

 5   particularly the number of people that are going

 6   to be utilizing this facility on a massive scale.

 7   Just going through some of the numbers here, this

 8   place is almost doubling in size, literally

 9   doubling in size, if you take a look at it.

10   They’re going from 226 people, as noted on their

11   plans to 434. And that’s not even talking about

12   the hotel, the accommodations for visitors and

13   all this other things that are going on here.

14   This is not the time to close this. It needs more

15   time to be reviewed, particularly by the public.

16   I mean, just look at the difference in buildings

17   in occupancy levels. You’re going to tell me that

18   the Dakota building that has five sleeping rooms

19   is only going to operate only be occupied by two

20   people at any time into perpetuity? Look at each

21   one of those items. There’s a potential of 600

22   people.

23             MR. KESSLER:       Okay.

24             MR. ROTOLO:       Okay. On a three-acre lot.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 69 Original page ↗

                                                            Page 69
1    March 3, 2026

 2   They may have a big footprint in the, in the

 3   area, but they’re putting the density of this is

 4   an extremely large size. It’s a three-story

 5   building over 50 feet tall. You’re not looking at

 6   this right. And I have not seen the answers

 7   coming through.

 8            MR. KESSLER:        Okay.

 9            MR. ROTOLO:        I don’t know what you guys

10   are looking at. Maybe you have more information

11   than I do, that all these answers have come that

12   have been brought up by the public here, but I

13   don’t see any of it.

14            MR. KESSLER:        Okay. Let’s, let’s be

15   clear on the numbers. You threw out a lot of

16   numbers there. Let me tell you the reality here.

17   Right now, they have 217 students, and I’m not,

18   I’m not, you know --

19            MR. ROTOLO:        Plus nine staff members.

20            MR. KESSLER:        Wait, no. Plus 75 staff

21   members, that’s what they have now.

22            MR. KEHOE:       That’s what they’re

23   approved, approved for.

24            MR. ROTOLO:        That’s not what it says on



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 70 Original page ↗

                                                            Page 70
1    March 3, 2026

 2   their plans.

 3             MR. KESSLER:       That’s, that’s what

 4   they’re approved for. And, okay, so they have 217

 5   currently and they have 75 staff. Okay, so let’s

 6   see, what is that? That’s 292. They’re proposing

 7   to go with four people in a room, It would be 256

 8   students and with five people in a room, 320. So

 9   if we were to allow five people in a room, you’d

10   be going from 217 to 320. As Chris said, their

11   plan shows 89 staff. Chris, is that the number?

12             MR. LAPINE:       Eighty-six.

13             MR. ROTOLO:       Eighty-six.

14             MR. KESSLER:       Eighty-six. So the --

15             MR. ROTOLO:       The staff’s family.

16             MR. KESSLER:       Correct. Staff and the

17   family.

18             MR. ROTOLO:       Staff members are 28 going

19   from nine -- according to their charts on their

20   paperwork is going from 320 plus 28 plus 86. And

21   we don’t know anything about the hotel, visitor

22   accommodations.

23             MR. KESSLER:       No. That there’s no, don’t

24   forget a lot -- there’s no hotel, but a lot, a



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 71 Original page ↗

                                                              Page 71
1    March 3, 2026

 2   lot of these buildings are, you’ve got to put

 3   them all together because they are people

 4   scattered in all the buildings.

 5              MR. ROTOLO:        Yeah.

 6              MR. KESSLER:        So all I’m saying is that

 7   217 and 75 is the number, the most that it could

 8   possibly be if we were to approve what they’re

 9   asking for would be 320 plus 86. That would be

10   the most. I --

11              MR. ROTOLO:        Okay. That’s 500 people.

12   And then you get the visitors that come, holidays

13   --

14              MR. KESSLER:        That’s 400 people.

15              MR. ROTOLO:        -- et cetera, and so on.

16              MR. KESSLER:        That’s 400 people. But

17   again, that’s what they’re asking for. That’s not

18   necessarily what we’re going to approve. We

19   haven’t gotten to that point yet. But there’s no

20   600 people. Let’s be clear. I don’t want, you

21   know, misrepresentations about what they’re --

22              MR. ROTOLO:        It can be that many. You’re

23   not, you’re not looking at the bigger picture

24   here.



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 72 Original page ↗

                                                            Page 72
1    March 3, 2026

 2            MR. KESSLER:        You can’t accommodate,

 3   there’s no room to accommodate 600 people.

 4            MR. ROTOLO:        Apparently there is,

 5   according to their charts. You got area, like the

 6   Dakota building, five sleeping rooms. They’re

 7   saying there’s only going to be two people in

 8   those rooms ever, according to their charts.

 9            MR. LAPINE:        The Dakota building is

10   where they have a majority of their offices and

11   no sleeping rooms anywhere.

12            MR. ROTOLO:        Well, it doesn’t say that.

13            MR. LAPINE:        Yes.

14            MR. ROTOLO:        Believe me. If you look at

15   it properly, you’ll see that it’s being

16   particularly secretive about what’s going on

17   there. You’ve got Texas building got eight, eight

18   sleeping rooms will never be occupied more than

19   four people.

20            MR. KESSLER:        They, they’re saying --

21            MR. ROTOLO:        That’s what it says on

22   their chart.

23            MR. KESSLER:        They’re representing the

24   Texas family will have two -- the Texas building



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 73 Original page ↗

                                                            Page 73
1    March 3, 2026

 2   will have two families. That’s what they’re

 3   saying.

 4             MR. ROTOLO:       That that’s not what it

 5   says on the plans.

 6             MR. KESSLER:       If we were to ever approve

 7   this, we will make sure that each building is

 8   clearly identified as to its use and its

 9   occupancy.

10             MR. ROTOLO:       Well, that’s what we’re

11   waiting for. We haven’t seen any of that. As the

12   public, we haven’t seen it. I’ve been to three

13   meetings so far and we keep asking the same

14   questions and we never get the answers.

15             MR. KESSLER:       Well, there is --

16             MR. ROTOLO:       That new report that just

17   came out, didn’t answer, didn’t answer a quarter

18   of the questions that were asked on that document

19   that just came through.

20             MR. KESSLER:       As Chris pointed out,

21   there is a chart that shows what the occupancy is

22   for each of the buildings totaling 86 people. And

23   we will make sure that that is adhered to as part

24   of any, if we were to ever approve this.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 74 Original page ↗

                                                             Page 74
1    March 3, 2026

 2              MR. ROTOLO:       I want to see the documents

 3   to say, stipulate exactly what’s going on there.

 4              MR. LAPINE:       It’s on --

 5              MR. ROTOLO:       Because it’s not happening.

 6   We keep asking for it and it never comes. I’m

 7   telling you it’s a fact. Look at the new plans.

 8   It just came out.

 9              MR. KESSLER:       Right.

10              MR. ROTOLO:       February 15th.

11              MR. SCHWARTZ:        Let me provide this to

12   you.

13              MR. ROTOLO:       Yeah. Yeah. There you go.

14   Right there.

15              MR. SCHWARTZ:        Here’s a table on sheet

16   one. So all the information is documented on this

17   drawing.

18              MR. ROTOLO:       I know, but you’ve got five

19   sleeping rooms and only two people are ever going

20   to occupy them. That’s what you’re telling me.

21              MR. SCHWARTZ:        That’s what’s being

22   represented, correct.

23              MR. ROTOLO:       So, the other four rooms

24   are going to sit empty forever, literally



                        Geneva Worldwide, Inc.
            228 Park Ave S - PMB 27669. New York, NY 10003

Page 75 Original page ↗

                                                            Page 75
1    March 3, 2026

 2   forever. What are they being used for? What’s the

 3   storage shed being used for? What’s actually

 4   going in that proposed storage shed? You go to

 5   every one of these rooms, there’s a potential to

 6   put multitudes of people in these rooms.

 7            MR. LAPINE:        Sir. What’s also not being

 8   noted here is there --

 9            MR. ROTOLO:        I kid you not.

10            MR. LAPINE:        Yeah. What’s also not being

11   noted here is there is an annual fire inspection

12   that takes place on the campus.

13            MR. ROTOLO:        Listen, I know that. I’ve

14   been through this already. Okay. Thank you for

15   putting that out. But I know all about that.

16   There’s still a bunch of questions that I brought

17   up.

18            MR. LAPINE:        But that, that was --

19            MR. ROTOLO:        Sprinkler systems --

20            MR. LAPINE:        Sprinkler systems aside,

21   that fire inspection also includes occupancy of

22   each of these rooms. So, if there’s an occupancy

23   greater than what was approved on this set of

24   plans that’s before you, that would be a



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 76 Original page ↗

                                                            Page 76
1    March 3, 2026

 2   violation that would have to be rectified.

 3            MR. ROTOLO:        Okay. I’ve heard all this

 4   before. We’ve been fighting this thing for 20

 5   years. Nothing has changed. The place is still a

 6   dump. The wall outside is falling down. They

 7   don’t do any maintenance over there. This is a

 8   serious potential hazard.

 9            MR. LAPINE:        This is an enforceable

10   document once they have this signed, campus

11   population table.

12            MR. ROTOLO:        I’m still saying and

13   requesting that you keep this open for another

14   term. So you spend a little bit more time and

15   bring up more of these questions and they start

16   answering the questions that have already been

17   asked. Okay? It’s not happening. It’s simply not

18   happening. I know they’re trying to push this

19   through in the dead of winter or whatever. A lot

20   of people couldn’t come tonight because of the

21   weather outside. But I could go on for a week and

22   I’m not going to, but I’m seriously requesting

23   that you do not close this public hearing at this

24   time. Thank you.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 77 Original page ↗

                                                            Page 77
1    March 3, 2026

 2            MS. VALERIE FRISCIA:            Good evening.

 3   Thank you very much. I’m Valerie Friscia. I live

 4   at 19 Shaw Highway. I have a letter and basically

 5   what it says is that the Peekskill waterway

 6   system, treatment system stated clearly that it

 7   could not accept flows exceeding more than 10,000

 8   gallons per day for this site. So if this cap is

 9   not kept, we are going to be exceeding that

10   without even including the 135 houses that were

11   also stated that could be hooked up. Despite

12   these loads limitations, this facility has

13   continued operating, now with the septic system

14   reportedly failed, wetlands being impacted. The

15   proposal to expand operations raises serious

16   environmental, legal, and financial concerns for

17   the town. Approving expansion under these

18   circumstances would expose the town to potential

19   violations of state environmental conservation,

20   wetland protection laws, public health liability,

21   increased discharge beyond previously documented

22   capacity limitations, long-term environmental

23   remedial costs. Expansion should not even

24   considered until a full inspection of



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 78 Original page ↗

                                                            Page 78
1    March 3, 2026

 2   environmental and health inspection is completed

 3   and publicly released, independent confirmation

 4   is provided that no untreated wastewater is

 5   entering regulated wetlands, verify that the

 6   infrastructure exists to handle all the

 7   wastewater within legal limits, the town provides

 8   transparency regarding what has changed since

 9   2020 sewer district petition. As a resident, I’m

10   asking the board to pause any approval on

11   expansions until these issues are fully resolved.

12   Moving forward without addressing documented

13   septic failure and capacity limits would be

14   irresponsible. I respectfully request that this

15   letter be entered into the public record and that

16   the board provide a written response outlining

17   how it intends to address these concerns. The

18   community deserves transparency, environmental

19   protection, and responsible governance.

20            MR. KESSLER:        Thank you. Okay. Can we

21   get from the Peekskill sewer district, because

22   I’m sure when they did the expansion, when they

23   did the sewer district, there was no sense as to

24   the number of people that potentially could be at



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 79 Original page ↗

                                                            Page 79
1    March 3, 2026

 2   the yeshiva. So can we get something from the

 3   sewer district that says if they were to put in

 4   320 people, plus 86 staff, plus 140 houses along

 5   the route, all hooking up that the Peekskill

 6   Sewer District can accommodate that? Okay. And

 7   that should hopefully answer all the questions,

 8              MS. COOK:     Excuse me. But then wouldn’t

 9   that require an amendment of the permit issued by

10   the Board of Legislatures that only included 141

11   Furnace Woods Road?

12              MR. KESSLER:      It didn’t only include 141

13   Furnace --

14              MS. COOK:     Right. But if we are going to

15   talk about, and this is the main bone of

16   contention on some of the things I said tonight.

17              MR. KESSLER:        The, the fact is anybody

18   can hook in if they want to. So it’s not just the

19   yeshiva.

20              MS. COOK:     Okay. Okay.

21              MR. KESSLER:      If you have, if you have

22   something that says otherwise, please share that.

23              MS. COOK:     I believe the permit --

24              UNIDENTIFIED MALE:         The wallet says



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 80 Original page ↗

                                                            Page 80
1    March 3, 2026

 2   otherwise.

 3               MS. COOK:    I’m sorry?

 4               MR. KESSLER:     If you have documentation

 5   --

 6               MS. COOK:    I’ll, we’ll take it up

 7   elsewhere.

 8               MR. KESSLER:     Okay. Thank you. Where

 9   were we? Okay, and again. Okay. Last call. Okay.

10   And I think we were about to make a motion. So

11   take two.

12               MR. KOBASA:     I’d like to make a motion

13   to close the hearing with the comment period

14   extended to May 15th and a commitment from the

15   applicant to extend the 60-day time clock if

16   needed, which Was given.

17               MR. KESSLER:     Which he, which he did --

18               MR. SCHWARTZ:      Consent granted

19               MR. KESSLER:     -- in perpetuity.

20               MR. SCHWARTZ:      Yep. In perpetuity.

21               MR. BIANCHI:     Second.

22               MR. KESSLER:     Okay, second. Thank you

23   Tom. On the motion, any question on the motion?

24   All in favor?



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 81 Original page ↗

                                                            Page 81
1    March 3, 2026

 2              MULTIPLE:     Aye.

 3              MR. KESSLER:      Opposed? Okay.

 4              MR. SCHWARTZ:        Thank you.

 5              MR. KESSLER:      Thank you all.

 6              MR. SCHWARTZ:        Goodnight.

 7              MR. KESSLER:      Thank you, public. Thank

 8   you for participating. We appreciate it. Okay,

 9   last item this evening is new business, the

10   application of Rafael Triana of High Q Electric

11   for renewal of a specialty trade contractor, a

12   special permit for an electrical contractor

13   located at 1 Dogwood Road. Drawings dated April

14   5, 2022. Good evening.

15              MR. RAFAEL TRIANA:         Good evening.

16              MR. KESSLER:      You are?

17              MR. TRIANA:      Rafael Triana. Welcome.

18              MR. KESSLER:      We’re going to set a

19   public hearing on your application for the next

20   meeting.

21              MR. TRIANA:      Okay.

22              MR. KESSLER:      So we’ll make it easy for

23   you. So with that, Karen?

24              MS. TIMKO:     I’d like to make a motion on



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 82 Original page ↗

                                                            Page 82
1    March 3, 2026

 2   item PB 2026-4, High Q Electric and the motion is

 3   to set a public hearing for April 7, 2026.

 4               MR. ROTHFEDER:       Second.

 5               MR. KESSLER:     Second. Thank you. On the

 6   question.

 7               MR. KEHOE:     On the question. So the code

 8   requires a public hearing. We went through this

 9   before. I’ll be working with you. I’ll send you

10   the list of abutters, I’ll send you the public

11   hearing notice. You’re responsible for sending it

12   out. There’s not too many abutters. And then

13   we’ll be back here in April to hold the hearing.

14               MR. TRIANA:     Okay.

15               MR. KEHOE:     Okay.

16               MR. KESSLER:     All right, we’re on the

17   question. All in favor?

18               MULTIPLE:     Aye.

19               MR. KESSLER:     Opposed? Thank you.

20               MR. TRIANA:     I’d like to say something

21   too. Thank you to Michael and Chris. You guys

22   have been great. Appreciate the help. I know I’ve

23   been a little late, but I appreciate it.

24               MR. KESSLER:     Okay. We’ll see you next



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 83 Original page ↗

                                                               Page 83
1    March 3, 2026

 2   month.

 3               MR. TRIANA:        Thank you.

 4               MR. KESSLER:        Thank you.

 5               MR. KOBASA:        All right. The time is

 6   7:42. The meeting’s adjourned.

 7               MR. KESSLER:        Thank you.

 8                (The public board meeting concluded at

 9   7:42.)

10




                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 84 Original page ↗

                                                                      Page 84


                             CERTIFICATE OF ACCURACY



     I, Juliana Castano, certify that the foregoing

     transcript of the Planning Board meeting of the

     Town of Cortlandt on March , 2026 was prepared

     using the required transcription equipment and is a

     true and accurate record of the proceedings.



        Certified By



        ________________________________________



        Date: March 17, 2026




GENEVAWORLDWIDE, INC

228 Park Ave S - PMB 27669

New York, NY 10003




                                 Geneva Worldwide, Inc.