Page 1
TOWN OF CORTLANDT
PLANNING BOARD
Steven Kessler, Chairperson Town Supervisor
Thomas A. Bianchi, Vice-Chairperson Town Hall, 1 Heady Street Richard H. Becker, MD
Cortlandt Manor, NY 10567
Nora Hildinger Main #: 914-734-1080 Town Board
Kevin Kobasa Fax #: 914-788-0294 James F. Creighton
Peter McKinley Cristin Jacoby
Jeff Rothfeder Planning Staff email: Robert Mayes
Karen Timko, Alternate chrisk@townofcortlandtny.gov Joyce C. White
Kellan Cantrell, Alternate
TO JOIN THE MEETING REMOTELY USE THE ZOOM LINK BELOW:
https://us02web.zoom.us/j/83787936918?pwd=rB5pYgCpQgA2beguEBMYCfzkixcFVb.1
WORK SESSION…………………………………………………………..MARCH 3, 2026 6:00 PM
1. Discuss March 3, 2026 Regular Planning Board Meeting Agenda.
MEETING AGENDA………………………………………………….……... PLANNING BOARD
TOWN OF CORTLANDT
6:30 TUESDAY EVENING*
MARCH 3, 2026
1. PLEDGE TO THE FLAG
2. ROLL CALL
3. CHANGES TO THE AGENDA BY MAJORITY VOTE
4. ADOPTION OF THE MINUTES OF THE MEETING OF FEBRUARY 2, 2026
5. CORRESPONDENCE
PB 1-16 a. Letter dated February 20, 2026 from Jim Annicchiarico requesting the 5th, 6-
month time extension of Preliminary Plat approval for the for the Pomona
Development, LLC (Boga) subdivision located on the south side of
Revolutionary Rd., south of Eton Lane.
6. PUBLIC HEARINGS (ADJOURNED FROM PREVIOUS MEETING)
PB 2025-7 a. Public Hearing: Application of the Yeshiva Ohr Hameir for Site Plan approval,
an amended Special Permit for a University, College or Seminary and a Wetland
Permit for a proposed 51,730 sq. ft. dormitory building, the repurposing of other
buildings on site, and site improvements including stormwater, landscaping and
building façade renovations located at the existing Yeshiva Ohr Hameir campus
at 141 Furnace Woods Rd. Drawings latest revised February 18, 2026. (see prior
PB 7-09)
PB 2025-5 b. Public Hearing: Application of VS Construction Corp. for Site Plan approval
and for Tree, Wetland and Steep Slope permits for a proposed 96,850 sq. ft.
Assisted Living Facility located in the Medical Oriented District (MOD) at 2003
Crompond Road. Drawings latest revised November 20, 2025. (Public Hearing
to be adjourned to the April 7, 2026 meeting at the applicant’s request)
Page 2
7. OLD BUSINESS
PB 2025-18 a. Application of 70 Roa Hook Realty LLC for Site Development Plan approval
to redevelop the site of the partially constructed Crystal Clean Carwash facility
to a proposed vehicle showroom and service facility for property located at 70
Roa Hook Rd. Drawings dated January 22, 2026 (see prior PB 13-16)
8. NEW BUSINESS
PB 2026-4 a. Application of Rafael Triana of High Q Electric for renewal of a Specialty-
Trade Contractor Special Permit for an electrical contractor located at 1
Dogwood Rd. Drawings dated April 5, 2022 (see prior PB’s 8-99 & 2020-18)
9. ADJOURNMENT
Next Regular Meeting; TUESDAY, APRIL 7, 2026 at 6:30* PM
Agenda information is also available at www.townofcortlandt.com
* Regular meeting will begin at the conclusion of the work session
2|Page
Page 3
February 20, 2026
Steven Kessler, Chairman
Town of Cortlandt Planning Board
Town Hall
One Heady Street
Cortlandt Manor, New York 10567
Re: Time Extension Request for
Preliminary Plat Approval - PB #1-16
Pomona Development, LLC
Revolutionary Road
Tax Map Designation: 23.15-1-43
Dear Chairman Kessler and Members of the Planning Board:
The above referenced project received conditional Preliminary Subdivision Plat approval from the
Planning Board via Resolution No. 9-23 on September 5, 2023, valid for a period of six (6) months. This
approval was extended via Resolution No. 3-24 for an additional six (6) months on March 5, 2024,
extended via Resolution No. 8-24 on September 11, 2024, extended via Resolution No. 7-25 on April 1,
2025 and extended via Resolution No. 17-25 on September 4, 2025.
We continue to work through the Realty Subdivision application process with the applicant and the
Westchester County Department of Health for their review and approval. Therefore, the Applicant
respectfully requests a 5th six (6) month time extension of the approval.
We respectfully request this item be placed on the March 3, 2026 Planning Board agenda for
consideration of approval of the time extension. Should you have any questions or require additional
information please contact me at the above number. Thank you for your time and consideration in this
matter.
Respectfully submitted,
James C. Annicchiarico
Project Engineer
cc: Cafo Boga, Pomona Development, LLC, Property Owner/Applicant
File: Boga-Revolutionary Rd-Cortlandt-3 Lot Subdivision-Letter-Time Extension-20260220
Page 4
DRAFT
TOWN OF CORTLANDT RESOLUTION NO. 6-26
PLANNING BOARD
PB 1-16
WHEREAS, the application of Pomona Development, LLC for Preliminary Plat approval pursuant
to Sections 276 and 277 of the New York State Town Law and Chapter 265 (Subdivision
Regulations) of the Town of Cortlandt Code and for permits pursuant to Chapter 179 (Wetlands),
259 (Steep Slopes) and Chapter 283 (Trees) for a proposed 3 lot major subdivision of a 16.78 acre
parcel of property as shown on a 13 page set of drawings entitled “Subdivision Plan for Pomona
Development” prepared by Cronin Engineering, P.E., P.C. latest revision dated April 26, 2023 was
approved on September 5, 2023 by Resolution 9-23, and
WHEREAS, the subject property of 16.78 acres is zoned R-20, single family residential, is located
on the southeast end of Revolutionary Road, approximately 500 feet southeast of Eton Lane and is
designated on the Town of Cortlandt Tax Maps as Section 23.15, Block 1, Lot 43, and
WHEREAS, by Resolutions 3-24, 8-24, 5-25 & 7-25 and 17-25 the Planning Board previously
granted four, six-month time extensions of Preliminary Plat approval, and
WHEREAS, by letter a dated February 20, 2026 James Annicchiarico requested the 5th, 6-month
time extension of Preliminary Plat approval in order to continue to meet the conditions of said
approval.
NOW THEREFORE BE IT RESOLVED that the Planning Board hereby APPROVES the 5th six-
month month time extension of Preliminary Plat approval said extension to expire on September 5,
2026.
TO BE CONSIDERED FOR ADOPTION: MARCH 3, 2026
Page 5
MEMORANDUM
TO: Town of Cortlandt Planning Board
FROM: Christopher Lapine, PE,
DATE: February 11, 2026
RE: PB2025- 7 Yeshiva Ohr Hameir
LaBella has performed a review of the plans prepared by Ciarcia Engineering, P.C. in support of the “Amended
Site Plan associated with the construction of the three-story dormitory building, extension of sanctuary building,
conversion of existing classrooms to staff housing, storage building, cafeteria and kitchen renovations, chalet
renovation, façade improvements, and associated utility improvements. submitted on February 9, 2026.
At the request of the Applicant our office reviewed a January 27, 2026, site plan submittal in response to our
January 20, 2026, response letter. The review was to focus on critical elements which included grading, exterior
ADA accessibility, fire apparatus maneuvering, stormwater design, floodplain evaluation and mitigation which
could alter the overall site program. Our office reissued our comment letter on January 29, 2026, indicating
which items had been addressed, partially addressed, and not addressed. Due to the incomplete submittal, it
was determined the application was to be removed from the February agenda.
On February 9, 2026, this office received a revised set of site plans, and Stormwater Pollution Prevention Plan,
which included a partial floodplain evaluation and no mitigation analysis. A summary of the submittal and our
comments are provided. Outstanding comments from previous review letters which are outstanding or partially
addressed are noted.
February 9, 2026 Submission
• Stormwater Pollution Prevention Plan, dated February 6, 2026
• Site Plan Set
1. Cover Sheet, dated February 9, 2026 (Prepared by Ciarcia Engineering, P.C.)
2. Sheet 1 of 15 – Project Information, revised February 9, 2026 (Prepared by Ciarca Engineering,
P.C.)
3. Sheet 2 of 15 - Existing / Demolition Plan, revised February 9, 2026 (Prepared by Ciarcia
Engineering, P.C.)
4. Sheet 3 of 15 - Site Plan, Revised February 9, 2026 (Prepared by Ciarcia Engineering, P.C.)
5. Sheet 4 of 15 - Grading and Utility Plan, revised February 9, 2026 (Prepared by Ciarcia
Engineering, P.C.)
6. Sheet 5 of 15 - Erosion Control Plan, revised February 9, 2026 (Prepared by Ciarcia Engineering,
P.C.)
7. Sheet 6 of 15 – Proposed On-Site Sewer Design, revised February 9, 2026 (Prepared by Ciarcia
Engineering, P.C.)
Page 6
Page 2
8. Sheet 7 of 15 – Proposed On-Site Watermain, revised February 9, 2026 (Prepared by Ciarcia
Engineering, P.C.)
9. Sheet 8 of 15 – Proposed Road Profile, revised February 9, 2026 (Prepared by Ciarcia Engineering,
P.C.)
10. Sheet 9 of 15 – Fire Protection Plan Fire Truck Turning Analysis, revised February 9, 2026 (Prepared
by Ciarcia Engineering, P.C.)
11. Sheet 10 of 15 – 2025 Fire Code Figure D103.1 Analysis, revised February 9, 2026 (Prepared by
Ciarcia Engineering, P.C.)
12. Sheet 11 of 15 –Details, revised February 9, 2026 (Prepared by Ciarcia Engineering, P.C.)
13. Sheet 12 of 15 – Details, revised February 9, 2026 (Prepared by Ciarcia Engineering, P.C.)
14. Sheet 13 of 15 – Sewer Details, revised February 9, 2026 (Prepared by Ciarcia Engineering, P.C.)
15. Sheet 14 of 15 – Misc Details, dated February 9, 2026 (Prepared by Ciarcia Engineering, P.C.)
16. Sheet 15 of 15 – Walking Trails, revised February 9, 2026 (Prepared by Ciarcia Engineering, P.C.)
Our comments are as follows.
Administrative
1. ALL plans subsequently submitted to the Town for review must be designed for construction and be
complete for review by all regulatory agencies having jurisdiction (e.g. WCDOH, NYSDEC, WCDEF, etc.).
2. The portions of the proposed improvements are located with Zone A Floodplain, as shown on the Flood
Insurance Rate Map # 36119C0019F. Zone A does not have a base flood elevation determined. Per
Chapter 175-17.E, within Zone A, when no base flood elevation data is available, the lowest floor
(including basement) shall be elevated at least three feet above the highest adjacent grade.
Calculations for a flood study have been provided, but no watershed mapping to support the analysis.
PREVIOUS COMMENT PARTIALLY ADDRESSED.
3. Per Chapter 175-14.B(3) whenever any portion of a floodplain is authorized for development, the
volume of space occupied by the authorized fill or structure below the base flood elevation shall be
compensated for and balanced by an hydraulically equivalent volume of excavation taken from below
the base flood elevation at or adjacent to the development site. All such excavations shall be
constructed to drain freely to the watercourse. No area below the water line of a pond or other body
of water can be credited as a compensating excavation. Calculations shall be provided demonstrated
conformance with this requirement. PREVIOUS COMMENT NOT ADDRESSED
4. Per Chapter 175-15.C(3) New and replacement sanitary sewage systems shall be designed to
minimize or eliminate infiltration of floodwaters. Sanitary sewer and storm drainage systems for
buildings that have openings below the base flood elevation shall be provided with automatic backflow
valves or other automatic backflow devices that are installed in each discharge line passing through
a building's exterior wall. NOT ADDRESSED, REQUIRES COMPLETED FLOOD STUDY WITH MAPPING.
5. Main will become public. Each building shall be equipped with a separate meter and backflow
prevention provided on the domestic water and fire supply. PREVIOUS COMMENT NOT ADDRESSED
6. The water main and sanitary sewer MUST be designed in accordance with Town of Cortlandt
Standards, the New York State Sanitary Code and the Recommended Standards for Wastewater
Facilities and Water Works (10 States), latest edition. PREVIOUS COMMENT NOT ADDRESSED
7. A written request addressed to the Town Supervisor and Town Board must be submitted by the
applicant regarding the main water extensions. This request must identify all utilities and
infrastructure proposed for dedication to the Town. PREVIOUS COMMENT NOT ADDRESSED
8. The applicant must prepare and submit a Map, Plan and Report (MPR) to the Town for the water
facilities. PREVIOUS COMMENT NOT ADDRESSED
Page 7
Page 3
9. Please provide a letter from the Town’s Water Division indicating that the water system has the
capacity to provide finished water storage to the project after all other committed flows. PREVIOUS
COMMENT NOT ADDRESSED
10. Applicant to remit payment for water extension fees. Fees will be agreed upon prior to submission
based upon the following: PREVIOUS COMMENT NOT ADDRESSED
a. Water main extension fee is $4,000 plus $2 per gallon of estimated consumption for
commercial entities.
11. The Yeshiva was incorporated into the Peekskill Sanitary Sewer District 2022. The initial sanitary flow
was 16,000 based on the existing bedroom count and student population. The current application to
construct a new dormitory building is proposing an increase of approximately 9,500 gpd (actual to be
determined based upon Engineer’s Report. Based upon correspondence with DOTS. Westchester
County Department of Environmental Facilities will require inflow and infiltration (I&I) mitigation at a
ratio of 1:1 for the increase in flow. PREVIOUS COMMENT NOT ADDRESSED
12. Provide vehicle maneuvering plans for refuse vehicles. PREVIOUS COMMENT NOT ADDRESSED
13. The NYS DEC has taken jurisdiction of the onsite wetlands, and the applicant is pursuing an Article 24
permit with DEC. The applicant shall provide the Town Planning Board copies of correspondence with
the NYSDEC regarding their jurisdictional determination and any permit to disturb wetlands or adjacent
areas.
14. Provide a legend for all plans. Some sheets are still missing legends. PREVIOUS COMMENT NOT
ADDRESSED
15. Provide a Phasing and Construction Plan for proposed dorm and existing buildings to be altered outlining
the sequencing of project work, pedestrian corridors, and how student population housing will be
managed during the on-site improvements. PREVIOUS COMMENT NOT ADDRESSED
16. Due to the concerns raised related to the safety of the students walking alongside Furnace Wood Road,
provide traffic-calming options along Furnace Wood Road for the benefit of the students. PREVIOUS
COMMENT NOT ADDRESSED
Plans
1. Sheet 1 of 15 – Accessible routes from the dorms and living quarters to cafeteria shall be depicted and
adequate slope conformance provided. This will require depicting proposed grading and spot
elevations, to confirm slope. A slope of 5.3 % is shown which exceeds maximum allowable slope of 5%
for an ADA path. PREVIOUS COMMENT NOT ADDRESSED.
2. Sheet 1 of 15 – Adequate slopes for ADA accessible spaces shall be demonstrated as well as accessible
routes to building entries from said spaces. This will require additional contours and spot elevations at
the end and beginning of each parking space to demonstrate compliance with maximum allowable ADA
parking slope of 2%. PREVIOUS COMMENT PARTIALLY ADDRESSED.
3. Sheet 1 of 15 – The Campus Population table is not displaying properly on this sheet.
4. Sheet 2 of 15 – Identify path of construction access and limits construction fence outside of the Town
Wetland to accommodate the removal of the building located south of the existing chalet. PREVIOUS
COMMENT NOT ADDRESSED.
10. Sheet 3 of 15 – Please call out areas where new curbing, asphalt, and sidewalks are proposed. Use
shading to decipher proposed vs existing asphalt and sidewalks. Provide a visually distinct delineation
between existing asphalt and proposed asphalt. PREVIOUS COMMENT PARTIALLY ADDRESSED.
11. Sheet 3 of 15 – Relocate proposed storage building to minimize impact into the wetland buffer. Remove
portions of concrete slab in buffer and restore with lawn to assist in managing post -development flows.
PREVIOUS COMMENT NOT ADDRESSED.
Page 8
Page 4
12. Sheet 4 of 15 –Maximum fire access drive slope is 10%. Grading revisions will need to be made to
accommodate the slope. PREVIOUS COMMENT PARTIALLY ADDRESSED.
13. Sheet 4 of 15 – Depict how roof leaders will be connected to the on-site drainage system for all
improvements and provide pipe sizes and slopes for all improvements. PREVIOUS COMMENT
PARTIALLY ADDRESSED
14. Sheet 4 of 15 – Depict how the proposed stormwater basin will discharge. PREVIOUS COMMENT
PARTIALLY ADDRESSED.
15. Sheet 4 of 15 – Proposed grading is depicted within the NYSDEC wetland for the fire truck turn around
and floodplain mitigation. Please provide correspondence from the NYSDEC approving this.
16. Sheet 4 of 15 – Provide contours and spot elevations for new sidewalks between Dallas Building and
Chalet Building, surrounding the new dormitory, and courtyard; spot elevations on the west side of
dormitory; contours on east side of dormitory; and spot elevations between the proposed dormitory and
staff building to decipher flow of runoff. PREVIOUS COMMENT PARTIALLY ADDRESSED.
17. Sheet 4 of 15 – Provide top and bottom elevations for all walls. PREVIOUS COMMENT NOT ADDRESSED
18. Sheet 4 of 15 – Label all watermain tees, hydrants, and valves. PREVIOUS COMMENT NOT ADDRESSED
19. Sheet 4 of 15 – Label all rim and invert elevation of drainage structures.
20. Sheet 4 of 15 – Show the analyzed floodplain elevation.
21. Sheet 5 of 15 – The sequencing notes indicate the construction of a sediment trap during the course of
construction, which appears to be at location of stormwater management basin. Plan should identify
outlet of trap and provide calculations for sizing the depth and area of disturbance being captured. Also
provide details of sediment trap. PREVIOUS COMMENT PARTIALLY ADDRESSED.
22. Sheet 6 of 15 – Future easement width varies on the plan. Town requested a of 20-ft wide easement
along the center of the sanitary sewer main for the benefit of the Town of Cortlandt in the event the
Town is required to take ownership of the sanitary sewer main. Please rectify and call out as such.
PREVIOUS COMMENT NOT ADDRESSED
23. Sheet 6 of 15 – Provide source of rim and invert elevation at pump station and datum used to determine
said elevations. PREVIOUS COMMENT NOT ADDRESSED
24. Sheet 6 of 15 – Label the station and elevation of each crossing in the profile. PREVIOUS COMMENT
NOT ADDRESSED
25. Sheet 6 of 15 – Provide stationing and invert connections of all lateral connections along the proposed
new sanitary line. PREVIOUS COMMENT NOT ADDRESSED
26. Sheet 6 of 15 – It appears the existing on-site sanitary sewer laterals are intended to connect to the
proposed new sanitary line. How was the elevation of each connection verified? Please call out existing
laterals as existing laterals. PREVIOUS COMMENT NOT ADDRESSED
27. Sheet 6 of 15 - There are 4-inch SDR 35 sewer service entering SMH-7 and sewer lateral entering SMH
2. The inverts should be verified and shown on profile to confirm adequacy of proposed connections.
PREVIOUS COMMENT NOT ADDRESSED
28. Sheet 6 of 15 – The type of pipe, length, and slope of proposed dormitory connection should be
identified on the plan. There shall be no bends in the sanitary lateral between the building and proposed
point of new sanitary connection.
29. Sheet 6 of 15 – Provide invert elevations and slopes of all new service connections. PREVIOUS
COMMENT NOT ADDRESSED
30. Sheet 6 of 15 – Revisit the rim elevations of the sanitary manholes in the profile to ensure they correlate
to the grading plan.
31. Sheet 6 of 15 – Provide calculations of the velocity of flow within the gravity sewer mains. PREVIOUS
COMMENT NOT ADDRESSED
Page 9
Page 5
32. Sheet 6 of 15 – Grease traps have been added to the plans. A sampling manhole is required prior to
the connection to the proposed sanitary line. Also provide inverts, rims, and slopes of pipes for grease
trap. PREVIOUS COMMENT NOT ADDRESSED
33. Sheet 7 of 15 – Stationing does not align with tick marks.
34. Sheet 7 of 15 – a straight section of watermain 20-ft in length shall be centered on the 8-inch sanitary
crossing, with a minimum separation of 1.5-ft at approximately Station 3+50.
35. Sheet 7 of 15 – A few pipe symbols do not align with stationing leaders.
36. Sheet 7 of 15 - Hydrant at southwest corner of the building should be located on the southern side of
the pavers.
37. Sheet 7 of 15 – Depict utility crossings, hydrants, and service connection including their stations and
inverts on watermain profile. PREVIOUS COMMENT PARTAILLY ADDRESSED
38. Sheet 7 of 15 – Provide minimum cover depth on watermain profile. PREVIOUS COMMENT NOT
ADDRESSED
39. Sheet 7 of 15 – A 2-inch domestic feed to the dormitory is proposed. As the building will be designed
to accommodate 320 students, confirm the adequacy of the domestic service. Also, confirm the
adequacy if 4-inch service with Project Architect/MEP to accommodate fire service. PREVIOUS
COMMENT NOT ADDRESSED
40. Sheet 8 of 15 – Provide the proposed slopes and elevations of the roadway to be revised to
accommodate fire trucks and along the access aisle west of the proposed dormitory building PREVIOUS
COMMENT PARTIALLY ADDRESSED
41. Sheet 9 of 15 – Provide fire truck detail and turning template on plan. PREVIOUS COMMENT PARTIALLY
ADDRESSED
42. Sheet 9 of 15 – The area apparatus turning movement is not contained within the roadway or
encroached upon a retaining wall at a number of locations and should expand the roadway and remove
obstructions to accommodate movements. For example, the fire truck path is shown outside the edge
of pavement west of the Dakota building and in conflict with the retaining wall near the Texas Building.
PREVIOUS COMMENT PARTIALLY ADDRESSED
43. Sheet 9 of 15 – Provide documentation that grass pavers can support the weight of the aerial apparatus.
Also include signs in the area indicating no stockpiling of snow or parking in the grass paver area. NOT
ADDRESSED
Page 10
Page 6
44. Sheet 9 of 15 – The maximum allowable slope along the path of a fire access shall be 10%. Re-grade
to between 314 and 316 to accommodate the required slopes. PREVIOUS COMMENT PARTIALLY
ADDRESSED
45. Sheet 11 of 15 - Provide specifications for topsoil and permanent and temporary vegetative cover.
PREVIOUS COMMENT NOT ADDRESSED
46. Sheet 11 of 15 - Provide maintenance requirements for each of the erosion and sediment control
measures. PREVIOUS COMMENT NOT ADDRESSED
47. Sheet 11 of 15 – Combine water notes on Sheet 11 and 12 and remove duplicate notes. Also review
notes on Sheet 11 as the notes reference subdivision. Incorporate all water notes from June 25, 2025
comment letter. Notes should indicate no leakage is permitted for water main pressure testing.
PREVIOUS COMMENT NOT ADDRESSED
48. Sheet 11 of 15 – Provide trench details for stormwater pipe. PREVIOUS COMMENT NOT ADDRESSED
49. Sheet 11 of 15 – Remove the wet tap detail and provide a Town of Cortlandt standard gate valve
assembly detail. PREVIOUS COMMENT NOT ADDRESSED
50. Sheet 11 of 15 - Provide details of retaining wall (east of staff housing), parking and traffic signage,
sidewalk, curbing, landscaping, lighting, grass pavers, trench saw cut and repair, ADA ramps, lighting,
etc. PREVIOUS COMMENT NOT ADDRESSED
51. Sheet 11 of 15 – Trenches shall be a minimum of 12-inches on either die of the pipe. Remove the 6-
inch minimum callout. Also, NYSDOT Item 304.14 shall extend to the bottom of pavement subbase.
52. Sheet 11 of 15- Add the following notes to the watermain trench detail:
a. Compact backfill to 95 relative material compacted dry density at optimum moisture in 8-inch
lifts.
b. Recycled Fill/Item 4 is not permitted as Backfill.
c. When determined by DOTS, and as directed, remove unsuitable material and backfill with
NYSDOT Item 304.14 or 3/4 inch crushed stone. Compact in 6-inch lifts.
53. Sheet 12 of 15 - Provide maintenance requirements for each of the erosion and sediment control
measures added to this sheet.
54. Sheet 13 of 15 –Revise and resubmit grease trap with bedding and backfill requirements, structure
volume, dimensions of structure area, depth from bottom of inlet and outlet tee to bottom of structure,
vent, cover specifications, material composition of grease trap and confirmation it can handle loading
from aerial apparatus truck. Please clarify why pipes protrude from the inlet and outlet baffles.
55. Sheet 14 of 15 - Update grease trap calculations to depict all fixtures, assigned fixture units per Table
E 103.3 (2) of the NYS Plumbing Code, and determine demand based upon Table E103.3 (3) of the
plumbing code. Provide a fixture plan.
56. Sheet 14 of 15 – Provide filter fabric around the stone infiltration trench
57. Sheet 14 of 15 – The infiltration trench detail appears to depict a perforated underdrain. The Applicant
should clarify the intent of this and include it in the model if necessary.
58. Sheet 14 of 15 – The infiltration trench detail should be revised to include the grass filter strip and any
other pretreatment practices proposed, as well as detailing and specifying the engineering soils used to
construct the infiltration trench. Means of preventing seeps or breakouts shall also be provided. Refer
to section 6.3.1 and Table 6.12 of the NYS DEC SWDM.
59. Sheet 14 of 15 – Revised the stone material to indicate a no 2 clean washed stone in the infiltration
trench.
60. Sheet 14 of 15 – As per the detail on page 6-36 of the NYS DEC SWDM, provide a 4” pea gravel top
surface and 6” perforated observation well in the infiltration trench design. An alternative to a pea gravel
top layer is topsoil and lawn.
Page 11
Page 7
61. Sheet 14 of 15 – Indicate a 24-inch minimum separation to groundwater and bedrock is required from
the bottom of stone for the infiltration trench detail.
62. Sheet 14 of 15 – Provide bedding and backfill requirements for the hydrodynamic separator. It also
appears notes and a key are missing from the details.
63. Sheet 15 of 15 – Sections of the proposed walking trail traverse through the on-site NYSDEC wetland.
Due to the potential for standing water and saturated soil within wetland areas, the location of the trail
should be reevaluated.
64. Sheet 15 of 15 – What will be the surface of the trail and how will it be constructed? Since portion of
trails considered within the wetland and on-site buffer, does NYSDEC permit application consider such
improvements?
SWPPP
1. Provide a figure depicting the watershed area used in the 100-year flood evaluation presented in
Appendix D.
2. The applicant should perform soil testing in the vicinity of the proposed infiltration system. The results
of this testing should be added to the SWPPP.
3. Based on the predeveloped watershed mapping, it appears that areas of Furnace Dock Road should be
included in the pool watershed. These areas are diverted to the north in the post-developed conditions.
The analysis should be expanded to determine what impact diverting runoff to the north may have on
offsite areas.
4. The project results in an increase in impervious cover. Areas of new impervious are directed to a first
defense unit for treatment. The applicant should provide documentation verifying the first defense unit
meets the treatment requirements for new impervious areas (80% TSS removal) and associated park
water quality discharge. If the selected practice does not meet the required TSS removal or peak water
quality discharge, other practices should be substituted.
5. Areas of new impervious shall be directed toward an acceptable runoff reduction practice.
6. Provide calculations associated with the sizing of practices associated with redevelopment activities in
accordance with Chapter 9.2.1 of the NYS DEC SWDM. Provide a watershed map delineating the existing
impervious areas and redeveloped areas.
7. For the portion of the site classified as redevelopment Runoff Reduction Volume (RRv) should be
provided for the new impervious areas. Provide calculations shows the minimum RRv requirements are
met for the site. It is recommended that supporting documentation utilize the NYSDEC Runoff Reduction
Worksheets on their website.
8. Provide the HydroCAD model for the predeveloped condition in the SWPPP.
9. The existing watershed maps show a small area adjacent to the pool house not captured by either the
pool watershed or the dorm watershed. Revise the mapping as necessary and update the calculations
as needed.
10. The NYS DEC Stormwater Design Manual states a grass filter strip should be provided as pretreatment
for an infiltration trench provided when runoff is conveyed via sheet flow. The filter strip should be sized
per table 6.13 of the NYS SWDM. Based on the approach length of asphalt on the plan, it does not
appear the required length has been provided. Consider implementation of a gravel diaphragm to meet
pretreatment requirements. This should be sized based on the infiltration rate of in-situ/natural soils.
11. The applicant should review section 6.3.1 of the NYS DEC SWDM to ensure the requirements of
infiltration practices in engineering fill materials are met.
12. The stormwater detention pond shows a bottom elevation of 307.9 in the HydroCAD model. This is lower
than the lowest outlet in the stormwater basin. The basin should be modeled as a wet pond with a
Page 12
Page 8
standing water elevation of 308.1 to match the outlet elevation of ES-3. Alternatively, the applicant may
provide a low flow orifice outlet at this location to dewater the pond between storm events.
13. The allowable bottom of the infiltration trench to be considered for storage shall be 310.3 which is 2
feet above the analyzed floodplain.
14. The 100-flood elevation has been calculated to reach 308.28 during the 100-year storm event.
Therefore, runoff would back up into the proposed stormwater basin in the 100-year storm event, the
HydroCAD model should be updated to reflect the impacts of flood elevations on the stormwater
management practices.
15. The HydroCAD model indicates the outlet for the stormwater basin, pond 2P is an 8” culvert with
downstream discharge at an elevation of 307.6. Based on the plans, it does not appear that the outlet
can be constructed as intended. In addition, the plans depict a ~150’ long outlet culvert where the
model includes only a 60’ culvert. Revise the plans and HydroCAD model for consistency. The outlet
should discharge above the analyzed floodplain elevation.
16. The HydroCAD model does not include an infiltration rate for Pond 8P. Following the required soil
testing, update the report to include this discarded flow.
17. The SWPPP should be updated to include sizing calculations to show the required WQv and RRv are
provided by the proposed stormwater management system.
18. The SWPPP should be updated to include sample inspections reports for the proposed stormwater
management practices and erosion control measures during construction.
19. The SWPPP should be updated to include a completed NYS DEC Notice of Intent.
20. The SWPPP should be updated to include a copy of the GP-0-25-001.
21. The SWPPP should be updated to describe how the proposed post developed stormwater management
practices meet the climate change requirements established in Part III.A.2 of the GP-0-25-001.
22. Runoff from the new sidewalks and building additions between the existing Sanctuary and Dallas
building should be captured and treated prior to discharge.
FUTURE RESUBMITTAL FROM THE APPLICANT SHALL INCLUDE A LETTER LISTING THE
COMMENTS ABOVE AND THEIR RESPONSE TO EACH COMMENT.
Page 13
CIARCIA ENGINEERING, P.C.
360 Underhill Avenue • Yorktown Heights • New York 10598 (914) 245-0123 Fax (914) 245-5670
Mr. Chris Kehoe, AICP February 18, 2026
Deputy Director
Director of Planning and Community Development
Town of Cortlandt Town Hall
One Heady Street
Cortlandt Manor, New York 10567
Re: Yeshiva Ohr Hameir (the “Yeshiva”)
141 Furnace Woods Road; Cortlandt Manor, NY 10567
Site Plan Submittal
Dear Chris:
As requested, enclosed is the latest site plan set for the Yeshiva Ohr Hameir campus.
This set of plans consists of the following sheets:
1. Yeshiva Ohr Hameir Proposed Dormitory & Sanctuary Addition dated
February 18, 2026 (cover sheet).
2. Amended Site Plan Prepared for Yeshiva Ohr Hameir, Project Information,
dated 11-17-2025, last revised 2-18-2026 (sheet 1 of 16).
3. Amended Site Plan Prepared for Yeshiva Ohr Hameir, Existing / Demolition
Plan, dated 3-27-2012, last revised 2-18-2026 (sheet 2 of 16).
4. Amended Site Plan Prepared for Yeshiva Ohr Hameir, Site Plan, dated 8-19-
2025, last revised 2-18-2026 (sheet 3 of 16).
5. Amended Site Plan Prepared for Yeshiva Ohr Hameir, Grading & Utility Plan,
dated 3-4-2024, last revised 2-18-2026 (sheet 4 of 16).
6. Amended Site Plan Prepared for Yeshiva Ohr Hameir, Erosion Control Plan,
dated 3-4-2024, last revised 2-18-2026 (sheet 5 of 16).
7. Amended Site Plan Prepared for Yeshiva Ohr Hameir, Proposed On-Site
Sewer Design, dated 3-4-2024, last revised 2-9-2026 (sheet 6 of 16).
8. Amended Site Plan Prepared for Yeshiva Ohr Hameir, Proposed On-Site
Storm Design, dated 3-4-2024, last revised 2-8-2026 (sheet 7 of 16).
9. Amended Site Plan Prepared for Yeshiva Ohr Hameir, Proposed On-Site
Watermain, dated 10-13-2025, last revised 2-9-2026 (sheet 8 of 16).
10. Amended Site Plan Prepared for Yeshiva Ohr Hameir, Proposed Road Profile,
dated 3-24-2024, last revised 2-18-2025 (sheet 9 of 16).
11. Amended Site Plan Prepared for Yeshiva Ohr Hameir, Fire Protection Plan
Fire Truck Turning Analysis, dated 10-13-2025, last revised 2-18-2026 (sheet
10 of 16).
12. Amended Site Plan Prepared for Yeshiva Ohr Hameir, 2025 Fire Code Figure
D103.1 Analysis, dated 10-13-2025, last revised 2-18-2026 (sheet 11 of 16).
Page 14
Mr. Chris Kehoe, AICP February 18, 2026
Yeshiva Ohr Hameir Page 2
13. Amended Site Plan Prepared for Yeshiva Ohr Hameir, Details, dated 3-4-
2024, last revised 2-9-2026 (sheet 12 of 16).
14. Amended Site Plan Prepared for Yeshiva Ohr Hameir, Details, dated 10-13-
2025, last revised 2-9-2026 (Sheet 13 of 16).
15. Amended Site Plan Prepared for Yeshiva Ohr Hameir, Sewer Details, dated
3-4-2024, last revised 2-8-2026 (Sheet 14 of 16).
16. Amended Site Plan Prepared for Yeshiva Ohr Hameir, Misc. Details, dated 1-
26-2026, last revised 2-8-2026 (Sheet 15 of 16)
17. Amended Site Plan Prepared for Yeshiva Ohr Hameir, Walking Trails, dated
6-11-2025, last revised 2-18-26 (sheet 16 of 16).
18. Amended Site Plan Prepared for Yeshiva Ohr Hameir, Lighting Plan, dated 2-
18-26 (sheet LT-1).
19. Amended Site Plan Prepared for Yeshiva Ohr Hameir, Lighting Details, dated
2-18-26, (sheet LT-2).
20. Amended Site Plan Prepared for Yeshiva Ohr Hameir, Walking Trail, prepared
by Tim Miller Associates, dated 11-3-2025, (sheet T1)
21. Amended Site Plan Prepared for Yeshiva Ohr Hameir, Landscape Plan,
prepared by Tim Miller Associates, (sheet L1).
22. Amended Site Plan Prepared for Yeshiva Ohr Hameir, Summary of Proposed
Mitigation Measures, prepared by Tim Miller Associates, dated 11-3-2025, last
revised 2-18-2026 (sheet T1).
23.
Also enclosed is the Stormwater Pollution Prevention Plan (SWPPP), dated February 6,
2026, last revised February 18, 3026.
LaBella, the Town’s engineering consultant, provided a review memo dated February
11, 2026, for our plan set dated February 9, 2026. The responses below are only for the
comments that were highlighted by the consultant as critical issues. The following is in
response to those comments:
Administrative
Comment 2: The portions of the proposed improvements are located with Zone A
Floodplain, as shown on the Flood Insurance Rate Map # 36119C0019F.
Zone A does not have a base flood elevation determined. Per Chapter
175-17.E, within Zone A, when no base flood elevation data is available,
the lowest floor (including basement) shall be elevated at least three feet
above the highest adjacent grade. Modify finish floor elevations should
be depicted on the pans to confirm with the Town Code.
Page 15
Mr. Chris Kehoe, AICP February 18, 2026
Yeshiva Ohr Hameir Page 3
Response 2: A portion if the property is located within Zone A. FEMA maps Zone A
using approximate techniques. Comparing the site topography to Zone A
boundaries, it is clear that the Zone A was mapped using inaccurate
topographic information. FEMA mapped the area directly across Maple
Avenue as Zone AE. This AE area represents the 100-year flood
elevation based on HEC-RAS modeling, and the 100-year flood
elevation was determined to be 307.
The 100-year flood elevation on the Yeshiva Ohr Hameir (YOH) property
was determined using hydrology modeling. The watershed was modeled
based on the area tributary to the culvert and a portion of the watershed
functioning as a detention pond using the culvert under Maple Avenue
as a control structure. The analysis is included in the Stormwater
Pollution Prevention Plan (SWPPP) determined the 100-year flood
elevation to be approximately 308.3.
Comment3: Per Chapter 175-14.B(3) whenever any portion of a floodplain is
authorized for development, the volume of space occupied by the
authorized fill or structure below the base flood elevation shall be
compensated for and balanced by an hydraulically equivalent volume of
excavation taken from below the base flood elevation at or adjacent to
the development site. All such excavations shall be constructed to drain
freely to the watercourse. No area below the water line of a pond or
other body of water can be credited as a compensating excavation.
Calculations shall be provided demonstrated conformance with this
requirement.
Response 3: The revised plans propose an area near the former ski lift building to
compensate for the floodplain volume displaced by the proposed
improvements. A note summarizing the floodplain mitigation is provided
on the site plan (Sheet 3 of 16).
Comment 13: The NYS DEC has taken jurisdiction of the onsite wetlands, and the
applicant is pursuing an Article 24 permit with DEC. The applicant shall
provide the Town Planning Board with copies of correspondence with
the NYSDEC regarding their jurisdictional determination and any permit
to disturb wetlands or adjacent areas.
Response 13: Steve Marino from Tim Miller Associates (TMA) has met with the NYSDEC
to discuss the project scope. We are hoping to have written
correspondence from the NYSDEC in advance of the next Planning Board
meeting indicating their conceptual approval of the proposed buffer
encroachments. The applicant has been waiting for the final site plan
changes to be completed before submitting the Article 24 permit
application. A mitigation plan prepared by Tim Miller Associates (sheet
M1) is included in this submittal.
Page 16
Mr. Chris Kehoe, AICP February 18, 2026
Yeshiva Ohr Hameir Page 4
PLANS
Comment 1: Sheet 1 of 15 – Accessible routes from the dorms and living quarters to
cafeteria shall be depicted and adequate slope conformance provided.
This will require depicting proposed grading and spot elevations, to
confirm slope. A slope of 5.3 % is shown which exceeds maximum
allowable slope of 5% for an ADA path.
Response 1: Revised spot elevations have been provided. The slope along the
assessable path has been reduced to 4.5%.
Comment 2: Sheet 1 of 15 – Adequate slopes for ADA accessible spaces shall be
demonstrated as well as accessible routes to building entries from said
spaces. This will require additional contours and spot elevations at the
end and beginning of each parking space to demonstrate compliance
with maximum allowable ADA parking slope of 2%.
Response 2: Additional spot elevations have been added to the plan to demonstrate
compliance with ADA requirements.
Comment 12: Sheet 4 of 15 – Maximum fire access drive slope is 10%. Grading
revisions need to be made to accommodate the slope.
Response 12: The main site driveway has been regraded to reduce the slope. The
driveway has also been widened to 26 feet.
Comment 13: Sheet 4 of 15 – Depict how roof leaders will be connected to the on-site
drainage system for all improvements and provide pipe sizes and slopes
for all improvements.
Response 13: The locations of the roof drains are depicted on the revised plans. Pipe
sizes and slopes are provided on the revised plans. The pool building
has a flat roof and roof drains will be internal.
Comment 14: Sheet 4 of 15 - Depict how the proposed stormwater basin will
discharge.
Response 14: The discharge from the basin is shown on the revised plans.
Comment 15: Sheet 4 of 15 - Proposed grading is depicted within the NYSDEC
wetland for the fire truck turn around and floodplain mitigation. Please
provide correspondence from the NYSDEC approving this.
Response 15: We anticipate having correspondence from the NYSDEC indicating their
conceptual approval of the proposed buffer disturbances.
Comment 19: Sheet 4 of 15 – Label all rim and invert elevations of drainage structures.
Page 17
Mr. Chris Kehoe, AICP February 18, 2026
Yeshiva Ohr Hameir Page 5
Response 19: The revised plans include rim and invert elevations on the Proposed On-
Site Storm Design plan (Sheet 7 of 16).
Comment 20: Show the analyzed floodplain elevation.
Response 20 The computed 100-year floodplain is indicated on the site plan (Sheet 3
of 16)
Comment 41: Sheet 9 of 14 – Provide fire truck detail and turning template on plan.
Response 41: The drive through analysis based on the Mohegan Fire Department’s
ladder truck incorporates the turning template for that truck. The turning
template is provided on the Fire Protection Plan, Fire Truck Turning
Analysis sheet (Sheet 10 of 16)/
Comment 42: Sheet 9 of 15 – The area apparatus turning movement is not contained
within the roadway at a number of locations and should expand the
roadway and remove obstructions to accommodate movements. For
example, the current access aisle width and wall east of cafeteria
obstructs fire access to the Tex Building.
Response 42: The wall is being relocated and the pavement widened in this location.
During the site visit, Fire Department personnel indicated that they would
handle a fire at Texas with ladders, and the trucks would not drive up to
the building.
Comment 44: Sheet 9 of 15 – The maximum allowable slope along the path of a fire
access shall be 10%. Re-grade to between 314 and 316 to
accommodate the required slopes.
Response 44: The driveway has been regraded in this area to ensure a slope less than
10%.
Comment 57: Sheet 14 of 15 – The infiltration trench detail appears to depict a
perforated underdrain. The Applicant should clarify the intent of this and
include it in the model if necessary.
Response 57: The infiltration trench detail has been revised to eliminate the underdrain
and include a pea gravel diaphragm upstream of the practice. The
revised detail is provided on the Misc Details sheet (Sheet 15 of 16)
Comment 61: Sheet 14 of 15 – Indicate a 24-inch minimum separation to groundwater
and bedrock is required from the bottom of stone for the infiltration
trench detail.
Response 61: The trench drain detail has been revised to address this comment.
Page 18
Mr. Chris Kehoe, AICP February 18, 2026
Yeshiva Ohr Hameir Page 6
SWPPP
Comment 1: Provide a figure depicting the watershed area used in the 100-year flood
evaluation presented in Appendix D.
Response 1: A figure depicting the watershed used for the 100-flood analysis is
provided in the revised SWPPP.
Comment 2: The applicant should perform soil testing in the vicinity of the proposed
infiltration system. The results of this testing should be added to the
SWPPP.
Response 2: Soil testing will be performed to demonstrate the feasibility of the
proposed stormwater management practices.
Comment 3. Based on the predeveloped watershed mapping, it appears that areas of
Furnace Dock Road should be included in the pool watershed. These
areas are diverted to the north in the post-developed conditions. The
analysis should be expanded to determine what impact diverting runoff
to the north may have on offsite areas.
Response 3: A stone wall along Furnace Woods Road keeps the gutter flow out of the
pool watershed. Additionally, a diversion swale located on the north side
of the pool building is proposed to direct runoff from undisturbed areas
away from the watershed being treated.
Comment 4: The project results in an increase in impervious cover. Areas of new
impervious are directed to a first defense unit for treatment. The
applicant should provide documentation verifying the first defense unit
meets the treatment requirements for new impervious areas (80% TSS
removal) and associated park water quality discharge. If the selected
practice does not meet the required TSS removal or peak water quality
discharge, other practices should be substituted.
Response 4: Approvals for the First Defense unit are provided in the appendix of the
revised SWPPP.
Comment 5: Areas of new impervious shall be directed toward an acceptable runoff
reduction practice.
Response 5: New impervious areas are directed toward either the First Defense unit
or the infiltration trench. In addition, the permeable paver area for the fire
truck turn around was designed to capture the 25-year storm. Although
that watershed was not modeled, the paver practice has the capacity to
capture and treat 3,200 cu.ft. of runoff.
Page 19
Mr. Chris Kehoe, AICP February 18, 2026
Yeshiva Ohr Hameir Page 7
Comment 6: Provide calculations associated with the sizing of practices associated
with redevelopment activities in accordance with Chapter 9.2.1 of the
NYS DEC SWDM. Provide a watershed map delineating the existing
impervious areas and redeveloped areas.
Response 6: The revised SWPPP addresses this comment.
Comment 7: For the portion of the site classified as redevelopment Runoff Reduction
Volume (RRv) should be provided for the new impervious areas. Provide
calculations shows the minimum RRv requirements are met for the site.
It is recommended that supporting documentation utilize the NYSDEC
Runoff Reduction Worksheets on their website.
Response 7: The RRv worksheet is provided in the appendix of the revised SWPPP.
Comment 8: Provide the HydroCAD model for the predeveloped condition in the
SWPPP.
Response 8: The model for the predevelopment condition is provided in the revised
SWPPP.
Comment 9: The existing watershed maps show a small area adjacent to the pool
house not captured by either the pool watershed or the dorm watershed.
Revise the mapping as necessary and update the calculations as
needed.
Response 9: The existing and proposed watersheds are identical. The approach was
used to simplify modeling. There is no logical design point to analyze
due to the topography of the site.
Comment 10: The NYS DEC Stormwater Design Manual states a grass filter strip
should be provided as pretreatment for an infiltration trench provided
when runoff is conveyed via sheet flow. The filter strip should be sized
per table 6.13 of the NYS SWDM. Based on the approach length of
asphalt on the plan, it does not appear the required length has been
provided. Consider implementation of a gravel diaphragm to meet
pretreatment requirements. This should be sized based on the infiltration
rate of in-situ/natural soils.
Response 10: The revised infiltration detail includes a pea grave diaphragm.
Comment 11: The applicant should review section 6.3.1 of the NYS DEC SWDM to
ensure the requirements of infiltration practices in engineering fill
materials are met.
Response 11: Minor grading will be required to set the bottom of the infiltration trench.
Percolation tests will be conducted once the fill has been placed.
Page 20
Mr. Chris Kehoe, AICP February 18, 2026
Yeshiva Ohr Hameir Page 8
Comment 12: The stormwater detention pond shows a bottom elevation of 307.9 in the
HydroCAD model. This is lower than the lowest outlet in the stormwater
basin. The basin should be modeled as a wet pond with a standing water
elevation of 308.1 to match the outlet elevation of ES-3. Alternatively, the
applicant may provide a low flow orifice outlet at this location to dewater
the pond between storm events.
Response 12: The 307.9 elevation was a check on the model’s method for computing
pond volume. This elevation was removed from the model.
Comment 13: The allowable bottom of the infiltration trench to be considered for
storage shall be `310.3 which is 2 feet above the analyzed floodplain.
Response 13: The infiltration trench was designed for water quality treatment. The
practice is not being utilized for peak attenuation. The design maximizes
treatment during the majority of storm events. The permeable pavers
have also been designed to capture runoff beyond the water quality
volume (WQv) in that area. The stone volume of the permeable paver
practice is sufficient to capture and treat the 25-year storm.
Comment 14: The 100-flood elevation has been calculated to reach 308.28 during the
100-year storm event. Therefore, runoff would back up into the proposed
stormwater basin in the 100-year storm event, the HydroCAD model
should be updated to reflect the impacts of flood elevations on the
stormwater management practices.
Response 14: The basin has been designed to provide peak attenuation during most
rainfall scenarios. The site topography limits a practical solution to this
issue.
Comment 15: The HydroCAD model indicates the outlet for the stormwater basin, pond
2P is an 8” culvert with downstream discharge at an elevation of 307.6.
Based on the plans, it does not appear that the outlet can be constructed
as intended. In addition, the plans depict a ~150’ long outlet culvert
where the model includes only a 60’ culvert. Revise the plans and
HydroCAD model for consistency. The outlet should discharge above the
analyzed floodplain elevation.
Response 15: The pond outlet has been addressed on the revised plans. Due to the
many site constraints, storage to mitigate the 100-year storm is not
practical. The pond will provide floodplain volume in the 100-year storm
scenario.
Comment 16: The HydroCAD model does not include an infiltration rate for Pond 8P.
Following the required soil testing, update the report to include this
discarded flow.
Page 21
Mr. Chris Kehoe, AICP February 18, 2026
Yeshiva Ohr Hameir Page 9
Response 16: The revised report will consider percolation once the data is available.
Comment 17: The SWPPP should be updated to include sizing calculations to show
the required WQv and RRv are provided by the proposed stormwater
management system.
Response 17: The WQv and RRv calculations are provided in the appendix.
Comment 18: The SWPPP should be updated to include sample inspections reports
for the proposed stormwater management practices and erosion control
measures during construction.
Response 18: Sample inspection forms are provided in the appendix.
Comment 19: The SWPPP should be updated to include a completed NYS DEC Notice
of Intent.
Response 19: The Notice of Intent will be provided in the final version of the SWPPP.
Comment 20: The SWPPP should be updated to include a copy of the GP-0-25-001.
Response 20: The general permit will be provided in the final version of the SWPPP.
Comment 21: The SWPPP should be updated to describe how the proposed post
developed stormwater management practices meet the climate change
requirements established in Part III.A.2 of the GP-0-25-001.
Response 21: The revised SWPPP addresses this comment.
Comment 22: Runoff from the new sidewalks and building additions between the
existing Sanctuary and Dallas building should be captured and treated
prior to discharge.
Response 22: The reconfigured sidewalks in this area have only a minor change in
impervious surfaces. The ski lift building is within this watershed and
being demolished. The existing walkways and the ski lift building have a
combined impervious cover area of 1,996. The new sidewalks and the
Chalet addition add 2,613 sq.ft. This is a negligible increase. It should be
noted that a portion of the Chalet roof runoff will be directed to the
permeable paver practice.
Page 22
Mr. Chris Kehoe, AICP February 18, 2026
Yeshiva Ohr Hameir Page 10
Should you have any questions or require additional information, please call.
Sincerely,
Daniel A. Ciarcia
DAC: mc
Page 23
YESHIVA OHR HAMEIR
PROPOSED DORMITORY & DINING HALL MODIFICATION
FEBRUARY 18, 2026
NOW OR FORMERLY
NOW OR FORMERLY NOW OR FORMERLY THOMAS & IZUMI CORRELL NOW OR FORMERLY
NOW OR FORMERLY SOO YOUNG YANG MATTHEW LAWRENCE KARABAIC 44.12-2-1 PETER HERPICH
JORGE G. INGA SARI 44.8-5-3 44.8-5-24 44.12-2-34
NOW OR FORMERLY
44.8-5-25 MATTHEW LAWRENCE NOW OR FORMERLY
WOO
KARABAIC DAVID RAYMOND GRAFE
DS 44.8-5-24 44.12-2-35
E
N AC
FUR ROAD
4
7
20'
1H
3
NOW OR FORMERLY
DIANA MANHEIMER-
1H
TAYLOR
44.12-1-4
4
2 ENTRANCE
C
L
CLEAR INSIDE
CAB LEGTH
CLEAR INSIDE
CAB WIDTH ENTRANCE
CL
L
C
NOW OR FORMERLY
SARAH B. GILLEN & ROBERT B. JERSEY
26"
44.12-1-6.2
NOW OR FORMERLY
NANCY L. BOUTROSS
44.12-3-5
2H
13
NOW OR FORMERLY
PICCIANO ENTERPRISES LLC.
44.8-6-9.4
JEFFREY L. SHUCHAT
& JACQUELINE K. TURNER
44.12-3-2
NOTE:
THERE SHALL BE NO DEVIATION OF THE APPROVED PLANS WITHOUT PRIOR
WRITTEN AUTHORIZATION BY THE DIRECTOR OF TECHNICAL SERVICES OR
OTHER AUTHORIZED INDIVIDUALS. FAILURE TO COMPLY WILL BE GROUNDS
FOR THE ISSUANCE OF A "STOP WORK ORDER'.
NOW OR FORMERLY
J.D. SUPP NEEDS T
O'CONNOR
44.12-3-1
LANDS OF THE
COUNTY OF
WESTCHESTER
44.11-1-1
NOW OR FORMERLY
CRISTIAN GARCIA
NOW OR FORMERLY 44.12-1-2
36 MONTROSE STATION ROAD NOW OR FORMERLY LANDS OF
44.12-1-1 THE TOWN OF CORTLANDT
44.12-1-7
OWNER: SITE ENGINEER: ATTORNEYS: SURVEYOR: ENVIROMENTAL CONSULTANT: ARCHITECT:
YESHIVA OHR HAMEIR CIARCIA ENGINEERING, P.C. ZARIN & STEINMETZ TC MERRITTS LAND TIM MILLER ASSOCIATES, INC. WEISZ ARCHITECTS
141 FURNANCE WOODS ROAD 360 UNDERHILL AVENUE 81 MAIN STREET 10 NORTH STREET 1515 FOREST AVENUE #101
CORTLANDT MANOR, NY 10567 YORKTOWN HEIGHTS, NY 10598 WHITE PLAINS, NY 10601
SURVEYORS COLD SPRINGS, NY 10516 LAKEWOOD, NJ 08701
UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS
(914) 245-0123 (914) 682-7800 (845) 265-4400 (732) 202-5455 DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE
394 BEDFORD ROAD, PLEASANTVILLE, NY 10570 NEW YORK STATE EDUCATION LAW.
Page 24
16
SHEET NUMBER
ZONING DISTRICT: R-40 & UNIVERSITY, COLLEGE OR SEMINARY (307-50) TOWN NOTES:
EXISTING PROPOSED EXISTING
CAMPUS POPULATION TABLE
1. ALL DISTURBED AREAS SHALL BE 100% STABILIZED AND PLANTED PRIOR
OVERALL TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
DESCRIPTION REQ'D DODGE CITY DORMITORY SANCTUARY
SITE
BLDG BLDG BUILDING 2. THE APPLICANT SHALL SUBMIT AN AS-BUILT SURVEY OF ALL
1
MIN. LOT AREA 25 ACRES 37.18 ACRES NO CHANGE NO CHANGE NO CHANGE IMPROVEMENTS TO BE DEDICATED TO THE TOWN OF CORTLANDT FOR
REVIEW AND APPROVAL PRIOR TO ACCEPTANCE OF THE DEDICATION.
MIN. FRONTAGE 200 FEET 896.5 FEET NO CHANGE NO CHANGE NO CHANGE THIS SHALL INCLUDE TOPOGRAPHY AND UTILITY ELEVATIONS.
MIN. FRONT YARD 100 FEET 49.0 FEET 186.7 193.9 280.3 3. THE APPLICANT SHALL SUBMIT AN AS-BUILT SURVEY OF ALL ON-SITE
IMPROVEMENTS FOR REVIEW AND APPROVAL PRIOR TO ISSUANCE OF
ORIGINAL DATE: 11/17/2025
4 TOWN COMMENTS 2-18-26
1 MISC. REVISIONS 12-17-25
100 FEET 244 FEET 496.1 472.7 386.4 CERTIFICATE OF OCCUPANCY. THIS SHALL INCLUDE TOPOGRAPHY AND
2 MISC REVISIONS 1-26-26
MIN. SIDE YARD
3 MISC. REVISIONS 2-9-26
UTILITY ELEVATIONS.
MIN. REAR YARD 100 FEET 775 FEET 969.8 944.4 989.2
PROJECT NUMBER:
4. PRIOR TO THE BACKFILLING OF ANY STORM WATER BEST MANAGEMENT
MAX. BLDG HEIGHT 70 FEET <35 FT 30 FEET 51.3 FT 28.4 FT PRACTICE, DOTS-ENGINEERING SHALL BE NOTIFIED TO PERFORM AN
INSPECTION.
MAX. BLDG STORIES 2-21 2-1/2 2 3 2
5. ALL PROPOSED IMPORT FILL MUST BE TESTED AND CERTIFIED AS
MAX. BLDG COVERAGE 25% 3.3% 27,126 S.F. 48,228 SF 9,047 S.F. UNRESTRICTED, SUITABLE FOR RESIDENTIAL USE IN ACCORDANCE WITH
TOWN POLICY. CERTIFICATION MUST BE PROVIDED BY A LICENSED
MIN. LANDSCAPED COVER 50% 78.0% PROFESSIONAL. ALL CERTIFICATIONS SHALL BE ADDRESSED TO TOWN’S
PLANNING BOARD ENGINEER. ALL SOIL ANALYTICS AND REPORTS WILL BE
5
PARKING PROVIDED - 35 + 3 HANDICAP SPACES FORWARDED TO THE TOWN’S PLANNING BOARD ENGINEER FOR REVIEW
AND APPROVAL.
BUILDING CODE ANALYSIS 6. PRIOR TO ACCEPTANCE OF THE ROAD AND DRAINAGE FACILITIES, THE
TOWN WILL REQUIRE A CERTIFICATION FROM A NYS ENGINEER THAT THE
PROPERTY DATA COMPLETED SITE WORK AND DRAINAGE IMPROVEMENTS WILL NOT CAUSE
AN ADVERSE IMPACT TO ADJOINING OR DOWNSTREAM PROPERTIES.
PROPERTY OWNER CONGREGATION YESHIVA OHR HAMEIR
APPLICANT CONGREGATION YESHIVA OHR HAMEIR 7. ROCK RIPPING WILL BE USED WHEREVER POSSIBLE. IF BLASTING IS
REQUIRED, IT WILL REQUIRE PRIOR APPROVAL FROM THE TOWN OF
141 FURNACE WOODS ROAD
LOCATION CORTLANDT AND AN AIR QUALITY PERMIT FROM THE WESTCHESTER
CORTLANDT MANOR, NY 10567
COUNTY DEPARTMENT OF HEALTH.
TAX MAP DATA SECTION 44.12 BLOCK 1 LOT 3.1 4.5%ENC
' LOSURE
CIARCIA ENGINEERING, P.C.
8. THERE SHALL NO PROCESSING OF EXCAVATED MATERIALS BY A ROCK
SITE AREA 37.182 ACRES PROPOSED CRUSHER OR SIMILAR EQUIPMENT ON-SITE.
PAVEMENT
9. AN APPLICATION FOR A ROAD OPENING PERMIT SHALL BE SUBMITTED TO
THE DEPARTMENT OF ENVIRONMENTAL SERVICES (DOES).
SURVEY DATA
YORKTOWN HEIGHTS, NY 10598
10. ALL PAVEMENT RESTORATION SHALL MEET AND MATCH EXISTING
1. BOUNDARY SURVEY PREPARED BY BUNNEY ASSOCIATES AND BADEY AND GRADES.
360 UNDERHILL AVENUE
WATSON.
2. TOPOGRAPHIC DATA PREPARED BY TC MERRITTS (NGVD88). 11. NOTIFY DOTS 48 HOURS PRIOR TO INITIATING WORK.
3. WETLANDS FLAGS MAPPED BY TC MERRITTS.
(914) 245-0123
12. CONTRACTOR IS RESPONSIBLE FOR EMPLOYING AND MAINTAINING ALL
TRAFFIC CONTROL AND SAFETY MEASURES DURING CONSTRUCTION.
COMMUNITY DATA 13. BACKFLOW PREVENTION DEVICES SHALL BE DESIGN AND INSTALLED IN
ACCORDANCE WITH UNIVERSITY OF SOUTHERN CALIFORNIA LIST OF
SCHOOL DISTRICT: HENDRICK HUDSON APPROVED BACKFLOW PREVENTION DEVICES, NYSDOH GUIDELINES FOR
NEAREST SCHOOL: BLUE MOUNTAIN MIDDLE SCHOOL (0.6 MILES) DESIGNING BACKFLOW PREVENTION ASSEMBLY INSTALLATIONS, AND
BUILDING CODE
FIRE DISTRICT: MOHEGAN LAKE FIRE DISTRICT
NEAREST FIREHOUSE: 3 MILES
NEAREST PARK: BLUE MOUNTAIN (ADJACENT)
3
ZONING DATA
PERMITTED USES ("PERMITTED BY RIGHT"):
CHURCH OR OTHER PLACE OF WORSHIP INLUDING
RELIGIOUS INSTRUCTION; PRIVATE SCHOOL OFFERING PROPOSED
COURSES IN GENERAL INSTRUCTION. BUILDING
PROJECT INFORMATION
PLANNING BOARD NOTES
1. THE SEWER LINE WILL BE DESIGNED WITH
SUFFICIENT CAPACITY, AS DETERMINED BY
THE DEPARTMENT OF TECHNICAL SERVICES,
TO ACCOMODATE PROPERTIES ALONG, AND IN
THE IMMEDIATE VICINITY OF, THE ROUTE OF
THE PROPOSED SEWER LINE.
2
2. AT THE TIME OF BUILDING PERMIT
APPLICATION, THE APPLICANT SHALL INSPECT
AND REMOVE ALL DEAD, DISEASED AND/OR RELOCATED
HAZARDOUS TREES THAT COULD IMPACT THE PROPANE
TOWN ROAD AND/OR RIGHT OF WAY OF
OIL 4.8%
FURNACE WOODS ROAD FOR A DISTANCE OF TANK
50 FEET FOR THE ENTIRE FRONTAGE OF THE TANK
APPLICANT'S PROPERTY. SAID TREE
INSPECTION WILL BE CONDUCTED BY A TOWN
APPROVED ARBORIST.
PROPOSED PROPOSED
3. AT TIME OF ISSUANCE OF THE CERTIFICATE OF
OCCUPANCY THE APPLICANT SHALL
CURB TRASH
CONSTRUCT AN ON-SITE WALKING PATH TO 4.5%ENC
' LOSURE
THE SATISFACTION OF THE DIRECTOR OF
TECHNICAL SERVICES. PROPOSED
PAVEMENT
FEMA DATA
1. PORTION OF SITE IS WITHIN FEMA ZONE A.
2. AREA ON NORTH SIDE OF MAPLE AVENUE IS IN FEMA ZONE
AE WITH AN ESTABLISHED 100-YEAR ELEVATION OF 307 FT.
2.0%
AMMENDED SITE PLAN
THE 100-YEAR FLOOD ELEVATION ON THE PROPERTY WAS
DETERMINED TO BE 308.3 BASED ON HYDROLOGY
MODELING.
REPLACE
YESHIVA OHR HAMEIR
2H ASPHALT
PAVEMENT
Prepared For
13
LEGEND
EXISTING SIDEWALK
PROPOSED SIDEWALK
ADA ACCESS PATH
DORMITORY CHALET ADA ACCESS DINING HALL ADA ACCESS
UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS
DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE
SCALE: 1"=20' SCALE: 1"=20'
NEW YORK STATE EDUCATION LAW.
Page 25
16
SHEET NUMBER
BUILDING DEMOLITION NOTES CONSTRUCTION NOTES: GENERAL NOTES LEGEND
1. ALL CONSTRUCTION ACTIVITIES SHALL CONFORM TO THE REQUIREMENTS OF THE BUILDING CODE OF 1. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE PROVISIONS OF INDUSTRIAL
NYS CHAPTER 33 SAFEGUARDS DURING CONSTRUCTION AND THE FIRE CODE OF NYS CHAPTER 14 CODE RULE 753 REGULATIONS. EXCAVATORS AND CONTRACTORS MUST CONTACT
FIRE SAFETY DURING CONSTRUCTION AND DEMOLITION.
DIG SAFELY NEW YORK (STAKEOUT REQUESTS: 1-800-962-7962 OR 811) AT LEAST 48
2. ALL INTERIOR WALL FOOTINGS AND FOUNDATIONS AND ANY OTHER BELOW-GRADE STRUCTURES TO
2
HOURS IN ADVANCE OF ANY MECHANIZED DIGGING OR EXCAVATION WORK TO
BE REMOVED SHALL BE EXCAVATED, REMOVED AND ANY VOID CREATED BE BACKFILLED WITH
SELECT COMPACTED FILL MATERIAL, COMPACTED TO 98% UNDER BUILDING SLAB AND FOUNDATIONS, ENSURE UNDERGROUND UTILITY LINES ARE MARKED
AND 95% UNDER PAVEMENT. 2. CONTRACTOR SHALL IDENTIFY ALL EXISTING UNDERGROUND UTILITIES WITHIN THE
3. THE CONTRACTOR SHALL DISPOSE OF ALL ITEMS AND MATERIALS REMOVED AND NOT SALVAGED, LIMITS OF WORK. ALL EXISTING UTILITIES WITHIN THE LIMITS OF WORK SHALL BE
INCLUDING ALL EXCAVATED MATERIAL, OFF-SITE AND IN A LEGAL MANNER.
DISCONNECTED PRIOR TO COMMENCEMENT OF ANY WORK.
REMOVAL NOTES
4 TOWN COMMENTS 10-13-25
5 TOWN COMMENTS 11-17-25
9 TOWN COMMENTS 2-18-26
6 MISC. REVISIONS 12-17-25
ORIGINAL DATE: 3/27/2012
4. CONTRACTOR SHALL USE CARE DURING DEMOLITION TO AVOID DISTURBING OR DAMAGING 3. THE CONTRACTOR SHALL INSTALL TEMPORARY MESH CONSTRUCTION FENCE TO
2 MISC. REVISIONS 6-11-25
3 MISC. REVISIONS 8-19-25
7 MISC. REVISIONS 1-26-26
1 MISC. REVISIONS 4-18-25
8 MISC. REVISIONS 2-9-26
ADJACENT ABOVE-GRADE OR SUBGRADE STRUCTURES, FACILITIES, CURBS, PAVEMENTS, AND PROTECT ALL AREAS OUTSIDE OF THE LIMITS OF DISTURBANCE.
PERIMETER FENCING, WALLS OR LANDSCAPING, ETC. ANY DAMAGE RESULTING FROM THIS WORK
4. CONTRACTOR SHALL VERIFY ALL EXISTING SITE CONDITIONS, BOTH ABOVE AND
PROJECT NUMBER:
WILL BE RESTORED AT THE CONTRACTOR'S EXPENSE. TR* 8 MAPLE
5. THE CONTRACTOR SHALL TAKE EXTREME CARE TO PROTECT THE ROOT SYSTEMS OF EXISTING BELOW THE SURFACE, PRIOR TO COMMENCING WORK. ANY DISCREPANCIES
TREES TO REMAIN. BULK MATERIAL, EQUIPMENT, OR VEHICLES SHALL NOT BE STOCKPILED OR
PARKED WITHIN THE DRIP LINE OF ANY TREE. WHEN NECESSARY, THE CONTRACTOR SHALL
SURVEY DATA BETWEEN THE INFORMATION SHOWN ON THE DRAWINGS SHALL BE BROUGHT TO
THE ATTENTION OF THE OWNER'S FIELD REPRESENTATIVE AND/OR ENGINEER PRIOR
TR* 8 MAPLE
EXCAVATE BY HAND WITHIN THE DRIP LINE OF EXISTING TRESS, OR AS DIRECTED BY THE OWNER'S 1. BOUNDARY SURVEY PREPARED BY BUNNEY ASSOCIATES AND BADEY AND TO COMMENCING WORK.
FIELD REPRESENTATIVE. WATSON.
6. IN AREAS DESIGNATED FOR EXCAVATION, ALL EXISTING PAVEMENTS AND STRUCTURES SHALL BE 5. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CODES, RULES AND
2. TOPOGRAPHIC DATA PREPARED BY TC MERRITTS (NGVD88).
REMOVED ACCORDING TO THE PLANS AND SPECIFICATIONS, AND AS DIRECTED BY THE OWNER'S REGULATIONS GOVERNING THE WORK. THE CONTRACTOR SHALL COORDINATE
3. WETLANDS FLAGS MAPPED BY TC MERRITTS.
FIELD REPRESENTATIVE. DEMOLITION WITH THE (T) CORTLANDT APPLICABLE AGENCIES, UTILITY COMPANIES,
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING, EXCAVATING, AND DISPOSING OF ALL AND/OR SUB-CONTRACTORS.
MATERIALS INDICATED FOR REMOVAL ACCORDING TO THE SITE REMOVALS PLAN.
6. THE CONTRACTOR IS ADVISED THAT OTHER CONTRACTORS AND/OR UTILITY
8. THE OWNER & CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS FROM THE APPROPRIATE
AGENCIES PRIOR TO COMMENCING WORK. COMPANIES MAY BE WORKING IN THE AREA AT THE SAME TIME. THE CONTRACTOR
SHALL COORDINATE WORK SUCH THAT THERE ARE NO CONFLICTS IN OPERATION.
7. ABOVE OR BELOW GROUND TANKS, SHOULD ANY EXIST, MUST BE PROPERLY
EMPTIED, CLEANED AND REMOVED. REMOVAL OF UNDERGROUND TANKS MAY
REQUIRE A TANK PERMIT FROM TOWN OF CORTLANDT BUILDING DEPT.
WETLANDS FLAGGING CONFIRMATION ON WHETHER SOIL REMEDIATION IS REQUIRED SHALL BE PROVIDED,
SHOULD UNDERGROUND TANKS BE DISCOVERED AND REMOVED.
1. STATE WETLANDS BOUNDARY FLAGGED BY STEVEN MARINO FROM TIM MILLER S 20° 22' 30" E
ASSOCIATES AND CONFIRMED BY SARAH A. PAWLICZAK FROM NYSDEC ON JUNE 7, 72.43' S 26° 25' 10" E 8. THE OWNER SHALL OBTAIN AND PROVIDE AN ASBESTOS ABATEMENT CERTIFICATE
2023 AND SEPETMBER 19, 2024. TO THE TOWN OF CORTLANDT BUILDING DEPARTMENT INDICATING THAT IN THE
S 32° 00' 30" E 24.61' S 8° 53' 10" E
2. TOWN OF CORTLANDT WETLANDS FLAGGED BY PAUL J. JAEHNIG ON AUGUST 7, EVENT ASBESTOS IS DISCOVERED WITHIN STRUCTURES, IT WAS PROPERLY
CIARCIA ENGINEERING, P.C.
67.13' 84.10' S 20° 22' 20" E ENCAPSULATED AND REMOVED OFF SITE.
2025
8.70'
3. WETLANDS FLAGS MAPPED BY TC MERRITTS. WOO S 2° 30' 50" W
DS 22.11' S 16° 06' 40" W
S 17° 21' 10" E S 43° 35' 30" E S 21° 15' 30" E
39.13' 22.83' S 1° 50' 40" E
X
S 43° 58' 10" E 8.04' S 10° 55' 50" E 10.36'
S 23° 17' 00" E
140.03'
CE S 46° 28' 50" E
YORKTOWN HEIGHTS, NY 10598
59.11' 14.30'
N A 52.95'
S 36° 33' 30" E 37.99'
X
S 24° 17' 20" E S 35° 45' 00" E
FUR
X
ROAD
360 UNDERHILL AVENUE
S 32° 03' 40" E 23.99' 11.35' 17.34'
FM
S 17° 26' 50" E 36.70' EXISTING WALL TO S 20° 57' 30" E
S 15° 44' 10" E
X
24.78' BE REMOVED S 28° 07' 00" W
FM
65.00'
FM
BUILDINGS TO
X
FM
(914) 245-0123
FM
104.12' BE REMOVED 20.16'
FM
X
X
FM
FM FM
83.52'
FM
FM
20.60' S 16° 06' 10" E
0'
APPROXIMATE LOCATION OF S 30° 17' 40" E
FM
25.17'
48.8
FM
EXISTING 1" COPPER WATER
WALK AND 22.76'
FM
PAVEMENT TO SERVICE TO REMAIN S 38° 23' 20" E
FM
N 81° 03' 20" E BE REMOVED
FM
FM
19.65'
102.52'
FM
FM
FM
APPROXIMATE LOCATION OF
FM
FM
FM
S 78° 42' 00" W EXISTING 2" COPPER WATER
FM
SERVICE TO REMAIN
FM
62.32'
X
FM
X
X
N 8° 59' 00" W S 65° 01' 50" W
2'
53.7
110.00' BUILDING AND 167.88'
X
STAIRS TO
BE REMOVED
EXISTING WALL TO
BE REMOVED
X
N 84° 13' 30" E
33.40'
X
UTILITY POLE
PAVEMENT TO BE REMOVED
EXISTING / DEMOLITION
TO BE REMOVED
X
X
S 3° 22' 40" E
WALK TO BE
REMOVED
X
X
116.36'
N 64° 01' 40" E 13
STAIRS AND WALLS
TO BE REMOVED
S 36° 24' 45" W
ISLAND TO 14.13'
BE REMOVED
PLAN
EXISTING WATER
EXISTING METER TO BE
BASKETBALL RELOCATED
BACKBOARDS TO S 53° 44' 10" W
BE REMOVED 45.67'
ASPHALT TO
2.55'
BE REMOVED
W
PAVEMENT
TO BE REMOVED
EXISTING SSDA
AREA 'D'
TO BE ABANDONED
TREES TO
BE REMOVED
(TYP.)
BUILDING
X
FOUNDATION TO
BE REMOVED X
N 59° 42' 30" E
172.39' EXISTING SSDA
AMMENDED SITE PLAN
AREA 'C'
TO BE ABANDONED
YESHIVA OHR HAMEIR
FEMA ZONE A
UTILITY POLE
TO BE REMOVED
BUILDING TO BE
REMOVED
Prepared For
SEPTIC TANK AND
PUMP WET WELL APPROXIMATE FEMA
TO BE PUMPED ZONE AE 100-YEAR
AND FILLED WITH ELEVATION 308.3
SAND
UTILITY POLE
TO BE REMOVED
PAVEMENT
TO BE REMOVED
N 59° 04' 10" E
228.92'
X:\Details\811Eng_ver_BW.jpg
UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS
DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE
NEW YORK STATE EDUCATION LAW.
SCALE: 1"=40'
Page 26
FLOODPLAIN MITIGATION ANALYSIS
16
SHEET NUMBER
LEGEND
TOTAL AREA OF DISPLACED FLOODPLAIN 10,905 SQ.FT.
AVERAGE ELEVATION OF FILLED AREA 307.0 FT.
TOTAL FLOODPLAIN DISPLACEMENT 10,905 CU.FT.
3
TOTAL MITIGATION FLOODPLAIN MITIGATION AREA 14,903 SQ.FT.
AVERAGE ELEVATION OF MITIGATION AREA 307.2 FT.
TOTAL FLOODPLAIN MITIGATION 11,922 CU.FT.
2 TOWN COMMENTS 11-17-25
1 TOWN COMMENTS 10-13-25
4 TOWN COMMENTS 1-26-26
6 TOWN COMMENTS 2-18-26
3 MISC. REVISIONS 12-17-25
ORIGINAL DATE: 8/19/2025
5 MISC. COMMENTS 2-9-26
PROJECT NUMBER:
2H
LIMITS OF SAW CUT
CIARCIA ENGINEERING, P.C.
WOO
DS
E
YORKTOWN HEIGHTS, NY 10598
NAC
FUR
360 UNDERHILL AVENUE
ROAD
FM
FM
FM
FM
(914) 245-0123
FM
FM
FM
FM
4
FM
FM
7
FM
FM
PROPOSED
FM
CURB
FM
PROPOSED
FM
PAVEMENT
FM
WIDENING
FM
FM
FM
20'
FM
FM
FM
FM
FM
1H
FM
FM
E 3
AL
SW
N
O
SI
V ER
DI PROPOSED
BUILDING
1H
PROPANE
TANK
4
PROPANE
TANK 2
RELOCATED
PROPANE
TANK
PROPOSED PROPOSED
CURB TRASH
ENCLOSURE
PROPOSED
SITE PLAN
26"
PAVEMENT
PROPOSED
CURB
PROPOSED
ON-SITE
WALKING
TRAIL
PROPOSED PROPOSED
GUIDERAIL SIDEWALK
HVAC
OIL
TANK
AMMENDED SITE PLAN
YESHIVA OHR HAMEIR
PROPOSED
ON-SITE WALKING TRAIL
REPLACE
Prepared For
2H ASPHALT
PAVEMENT APPROXIMATE FEMA
ZONE AE 100-YEAR
ELEVATION 308.3
13
APPROXIMATE FEMA PROPOSED ON-SITE
100-YEAR FLOOD WALKING TRAIL 0.42 MI
ELEVATION 308.3
UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS
DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE SCALE: 1"=40'
NEW YORK STATE EDUCATION LAW.
Page 27
LEGEND
16
SHEET NUMBER
4
4 TOWN COMMENTS 11-17-25
3 TOWN COMMENTS 10-13-25
8 TOWN COMMENTS 2-18-26
6 TOWN COMMENTS 1-26-26
5 MISC. REVISIONS 12-17-25
7 TOWN COMMENTS 2-9-26
2 MISC. REVISIONS 4-18-25
1 MISC. REVISIONS 3-28-25
ORIGINAL DATE: 3/4/2024
PROJECT NUMBER:
W W W W W
SMH-2
CIARCIA ENGINEERING, P.C.
PROPOSED NEW
W
WATER VALVES
WOO
W
DS
W
E
W
YORKTOWN HEIGHTS, NY 10598
C
NA
W
FUR ROAD
360 UNDERHILL AVENUE
W
FM
W
FM
FM
FM
(914) 245-0123
FM
W
FM
FM
FM
4
FM
W
FM
20' 7
20'
FM
W
WATERMAIN APPROXIMATE LOCATION OF
FM
EASEMENT
FM
EXISTING 1" COPPER WATER
FM
W
SERVICE TO REMAIN
FM
FM
W
FM
FM
FM
20'
FM
W
W
APPROXIMATE LOCATION OF
FM
FM W
FM
W
EXISTING 2" COPPER WATER
FM
1H SERVICE TO REMAIN
W
FM
FM
W
SMH-1
E 3
AL
SW
W
N PROPOSED 2"COP
SIO DOMESTIC SERV PER
W
ER ICE
V
DI
W
1H
W
W
W
PROPOSED 4"DIP W W
W
CL54 FIRE SERVICE
W
4
W
PROPOSED 4"DIP
PROPOSED 2"COP
GRADING & UTILITY PLAN
W
CL54 FIRE SERVICE PER
W
2 W
W
DOMESTIC SERV ICE
SMH-2 W YD-2
W
W
W
W
W
W
W W
W W
W
W
W W W
W W
W
CB-2 W
W
W W
W
W
W W
W W
W W
W W
W
W W
W
W
W
W
26"
W
SMH-5
W
W
W
W
SMH-6
W
W
W
W
W
W
YD-4
W
CB-1
W
YD-3
W
SMH-3
W
W
CB-4
SMH-4
W
FD-1
W
PROPOSED
GUIDERAIL SMH-7
W
W
YD-1
W
W
W
W
W
W
W
W
W
W
AMMENDED SITE PLAN
W
CB-3
W
PROPOSED
YESHIVA OHR HAMEIR
HYDRANT
W
PROPOSED 4"DIP
TEMPORARY CONS
W
W
W
W
TRUCTIO N FENCE CL54 FIRE SERVICE
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
PROPOSED 2"COP
Prepared For
DOMESTIC SERV PER
2H ICE APPROXIMATE FEMA
ZONE AE 100-YEAR
ELEVATION 308.3
13
APPROXIMATE FEMA
100-YEAR FLOOD
ELEVATION 308.3
TEMPORARY
CONSTRUCTION
FENCE
UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS
DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE
NEW YORK STATE EDUCATION LAW. SCALE: 1"=40'
Page 28
CONSTRUCTION SCHEDULE 5. INSTALL SEDIMENT TRAP IN THE LOCATION SHOWN ON THE PLAN. ONCE SEDIMENT HAS REACHED THE LEGEND
16
SHEET NUMBER
LEVEL INDICATED ON THE SEDIMENT MARKER(SIX INCHES), IT SHALL BE REMOVED FROM THE SEDIMENT
BASIN. SEDIMENT EXCAVATED FROM THE BASIN SHALL NOT BE STOCKPILED AND SHALL BE REMOVED 18. CONSTRUCT REMAINDER OF BUILDING, DRIVEWAY AND PARKING AREAS. FIRST INSTALL CURBS, ASPHALT
PRIOR TO THE BEGINNING OF ANY SITE WORK THE MAJOR FEATURES OF THE CONSTRUCTION MUST BE FIELD STAKED IMMEDIATELY FROM THE SITE. BINDER, AND CONCRETE SIDEWALK. ONCE BINDER COURSE IS INSTALLED, DRAINAGE OUTLET MAY BE
BY A LICENSED SURVEYOR. THESE INCLUDE THE BUILDING, LIMITS OF DISTURBANCE, UTILITY LINES, AND 6. BEGIN ROUGH GRADING THE SITE. CONTRACTOR TO LIMIT EXPOSURE OF DENUDED SOILS BY PROVIDING UNBLOCKED.
STORMWATER PRACTICES. TEMPORARY STABILIZATION FOR WORK AREAS THAT WILL REMAIN UNDISTURBED FOR OVER SEVEN (7) 19. BACKFILL CURBS, GRADE, PLACE FINAL SOIL TOPPING AND PUT IN PLACE PERMANENT VEGETATIVE COVER OVER
DAYS. CHIPPED ROCK THAT IS NOT SUITABLE TO REMAIN ON SITE SHALL BE HAULED AWAY AND PROPERLY ALL DISTURBED AREAS, LANDSCAPE BEDS, SLOPES, ETC.
5
DISPOSED OF AN AREA HAS BEEN PROVIDED FOR THE STOCKPILING OF REMOVED SOIL AND ROCK WHICH IS 20. ONCE SITE STABILIZATION HAS TAKEN PLACE (AN AREA SHALL BE CONSIDERED TO HAVE ACHIEVED FINAL
1. PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, AN OWNER OR OPERATOR SHALL HAVE EACH CONTRACTOR STABILIZATION WHEN IT HAS A MINIMUM UNIFORM 80% PERENNIAL VEGETATIVE COVER OR OTHER PERMANENT
TO BE REMOVED FROM THE SITE.
AND SUBCONTRACTOR, THAT HAS BEEN IDENTIFIED AS BEING RESPONSIBLE FOR IMPLEMENTATION OF THE NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED SURFACE EROSION AND
7. ROUGH GRADE BUILDINGS, DRIVEWAY, AND PARKING AREA.
STORMWATER POLLUTION PREVENTION PLAN (SWPPP), IDENTIFY AT LEAST ONE EMPLOYEE FROM THEIR COMPANY SUBSURFACE CHARACTERISTICS SUFFICIENT TO RESIST SLIDING AND OTHER MOVEMENTS), REMOVE ALL
8. BEGIN CONSTRUCTION OF BUILDING.
(TRAINED CONTRACTOR) THAT HAS RECEIVED 4 HOURS OF ENDORSED E&SC TRAINING. THE TRAINED TEMPORARY EROSION AND SEDIMENT CONTROLS, UNPLUG THE DRAINAGE SYSTEM TO ALLOW RUNOFF TO ENTER
9. BEGIN THE EXCAVATION AND INSTALLATION OF THE STORMWATER MANAGEMENT SYSTEM. PROTECT TRENCHES
CONTRACTOR MUST BE ON SITE DAILY WHEN SOIL DISTURBANCE ACTIVITIES ARE BEING PERFORMED AND WILL BE THE STORMWATER MANAGEMENT SYSTEM.
4 TOWN COMMENTS 11-17-25
3 TOWN COMMENTS 10-13-25
AND OPEN EXCAVATIONS FROM EROSION. ENTRY INTO THE SYSTEM SHALL BE BLOCKED OFF UNTIL SITE
5 TOWN COMMENTS 1-26-26
7 TOWN COMMENTS 2-18-26
RESPONSIBLE FOR IMPLEMENTATION OF THE PRACTICES INCLUDED IN THE SWPPP.
6 TOWN COMMENTS 2-9-26
HAS REACHED FINAL STABILIZATION. ONCE SYSTEM HAS BEEN INSTALLED, BACKFILL, SEED WHERE NECESSARY, LOD LOD LOD
2 MISC. REVISIONS 6-11-25
1 MISC. REVISIONS 4-18-25
ORIGINAL DATE: 3/4/2024
2. AN OWNER OR OPERATOR OF A REGULATED CONSTRUCTION PROJECT, HALL HAVE A QUALIFIED INSPECTOR
AND REINSTALL MEASURES TO CORDON OFF THE SYSTEM FROM DISTURBANCE.
CONDUCT SPECIFIC SITE INSPECTIONS. QUALIFIED INSPECTORS WHO WORK ON THESE SITES (I.E., INDIVIDUALS WINTER STABILIZATION NOTES:
10. DURING SITE CONSTRUCTION MAINTAIN AND RE-ESTABLISH AS REQUIRED EROSION CONTROL AND
WORKING UNDER DIRECT SUPERVISION OF, AND AT THE SAME COMPANY AS, A LICENSED PROFESSIONAL
PROJECT NUMBER:
STABILIZATION MEASURES AS REQUIRED BY THE SITE PLAN AND DETAILS.
ENGINEER OR REGISTERED LANDSCAPE ARCHITECT OF NYS) ARE REQUIRED TO COMPLETE 4 HOURS OF E&SC IF CONSTRUCTION ACTIVITIES ARE EXPECTED TO EXTEND INTO OR OCCUR DURING THE WINTER SEASON THE
11. EXCAVATE TO THE SUB-GRADE LEVEL. SCARIFY THE EXISTING SOIL TO A DEPTH OF 12-INCHES BY ROTOTILLING OR
TRAINING UNDER THE GENERAL PERMIT. CONTRACTOR SHALL ANTICIPATE PROPER STABILIZATION AND SEQUENCING. CONSTRUCTION SHALL BE
OTHER MEANS ACCEPTABLE TO THE ENGINEER. INSTALL ALL COURSES OF STONE AS PER THE SPECIFICATIONS
3. A LICENSED SURVEYOR MUST DEFINE INFRASTRUCTURE LOCATIONS, LIMITS OF DISTURBANCE, SEQUENCED SUCH THAT WHEREVER POSSIBLE AREAS OF DISTURBANCE THAT CAN BE COMPLETED AND
GIVEN ON THE PLAN.
STORMWATER BASIN LIMITS, AND GRADES IN THE FIELD PRIOR TO START OF ANY CONSTRUCTION. LIMITS PERMANENTLY STABILIZED SHALL BE DONE BY APPLYING AND ESTABLISHING PERMANENT VEGETATIVE COVER
12. INSTALL BASE COURSE OF ITEM 4 IN ALL PAVEMENT AREAS. STABILIZE ALL OPEN AREAS WITH SEED AND MULCH.
OF DISTURBANCE SHALL BE MARKED WITH THE INSTALLATION OF CONSTRUCTION FENCE OR APPROVED EQUAL. BEFORE THE FIRST FROST. AREAS SUBJECT TO TEMPORARY DISTURBANCE THAT WILL NOT BE WORKED FOR AN
14. ONCE BASE COURSE HAS BEEN INSTALLED AND OPEN AREAS STABILIZED, BEGIN REMOVAL OF SEDIMENT
THE EXTENTS OF THE STORMWATER MANAGEMENT SYSTEM SHALL BE CORDONED OFF TO MINIMIZE THE EXTENDED PERIOD OF TIME SHALL BE TREATED WITH TEMPORARY SEED, MULCH, AND/OR EROSION BLANKETS.
TRAP. CLEAN OUT THE ACCUMULATED SEDIMENT AND ROUGH GRADE THE REMAINDER OF THE PARKING AREA.
DISTURBANCE ON THIS AREA.
15. COMPLETE INSTALLATION OF STORMWATER MANAGEMENT SYSTEM. POST CONSTRUCTION MAINTENANCE:
4. INSTALL ALL TEMPORARY EROSION CONTROL MEASURES AS SHOWN ON THE EROSION AND SEDIMENT CONTROL
16. PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, AN OWNER OR OPERATOR SHALL HAVE EACH CONTRACTOR
PLAN FOR THE PROJECT'S IMMEDIATE DISTURBANCE AREAS. THIS SHALL INCLUDE, BUT NOT LIMITED TO
AND SUBCONTRACTOR, THAT HAS BEEN IDENTIFIED AS BEING RESPONSIBLE FOR IMPLEMENTATION OF THE
SILT FENCE, STABILIZED CONSTRUCTION ENTRANCES, CONSTRUCTION FENCE, ETC. INSTALL THE SEDIMENT Control to be Inspection Maintenance
STORMWATER POLLUTION PREVENTION PLAN (SWPPP), IDENTIFY AT LEAST ONE EMPLOYEE FROM THEIR COMPANY Maintenance Procedure
TRAP IN THE LOCATION SHOWN ON THE PLANS. THIS SEQUENCE MUST BE FOLLOWED TO INSURE PROPER Inspected Frequency Threshold Criteria
(TRAINED CONTRACTOR) THAT HAS RECEIVED 4 HOURS OF ENDORSED E&SC TRAINING. THE TRAINED
IMPLEMENTATION OF THE EROSION AND SEDIMENT CONTROL PLAN (E&SC) AND STORMWATER POLLUTION
CONTRACTOR MUST BE ON SITE DAILY WHEN SOIL DISTURBANCE ACTIVITIES ARE BEING PERFORMED AND WILL BE Drain Inlets/ Filter Insert Quarterly 3"+ accumulated sediment Remove debris and sediment annually.
PREVENTION PLAN (SWPPP). CORDON OFF STORMWATER PRACTICES AS SHOWN ON THE E&SC PLAN TO PREVENT
RESPONSIBLE FOR IMPLEMENTATION OF THE PRACTICES INCLUDED IN THE SWPPP.
COMPACTION OF UNDERLYING SOILS. DURING CONSTRUCTION, RUNOFF WILL SHEET FLOW ACROSS THE SITE TO Detention Pond Annually 3"+ accumulated sediment Remove debris and sediment annually.
17. AN OWNER OR OPERATOR OF A REGULATED CONSTRUCTION PROJECT, HALL HAVE A QUALIFIED INSPECTOR
THE PERIMETER WHERE IT WILL BE PASS THROUGH SILT FENCING.
CONDUCT SPECIFIC SITE INSPECTIONS. QUALIFIED INSPECTORS WHO WORK ON THESE SITES (I.E., INDIVIDUALS
5. STRIP SITE, CLEAR VEGETATION, AND PLACE TOPSOIL IN STOCKPILE LOCATIONS SHOWN ON THE PLAN.
WORKING UNDER DIRECT SUPERVISION OF, AND AT THE SAME COMPANY AS, A LICENSED PROFESSIONAL
ENGINEER OR REGISTERED LANDSCAPE ARCHITECT OF NYS) ARE REQUIRED TO COMPLETE 4 HOURS OF E&SC
TRAINING UNDER THE GENERAL PERMIT.
LOD
CIARCIA ENGINEERING, P.C.
LOD
WOO
LOD
LOD
DS
LOD
E
YORKTOWN HEIGHTS, NY 10598
C
NA
SCE
LO
FUR
LOD
D
ROAD
360 UNDERHILL AVENUE
FM
LOD
FM
FM
LOD
FM
(914) 245-0123
FM
FM
FM
FM FM
LOD
FM
FM
LOD
APPROXIMATE LOCATION OF
FM
LO LOD
D
FM
LOD
EXISTING 1" COPPER WATER
FM
LOD
SERVICE TO REMAIN
LOD
LO
FM
D LOD
FM
FM
LOD
FM
FM
20' LOD
FM
APPROXIMATE LOCATION OF
FM
FM
LO LO
FM D
LOD SCE
D
EXISTING 2" COPPER WATER
FM
LOD
SERVICE TO REMAIN
FM
LOD LOD
LOD
FM
LO
LOD
LO
D
D
LOD
LOD
E
LOD AL
LOD
LO
LOD
SW
D
LOD
LOD N
IO
RS
LOD
LOD
LOD
LOD
E
LOD IV
LOD
D PROPOSED
LOD
LOD
BUILDING
LOD
LOD
LOD
PROPANE
LOD
LOD
LOD
TANK
LOD
LOD
LOD
LOD
D
LOD
EROSION CONTROL PLAN
LO
LOD LOD
PROPANE
LOD
LOD TANK ENTRANCE
L
C
CLEAR INSIDE
CAB LEGTH
CLEAR INSIDE
CAB WIDTH ENTRANCE
C
L
LOD LOD LOD
LOD YD-2 LOD LOD LOD
D
L
C
LOD
LO
RELOCATED
LOD
LOD LOD
PROPANE
LOD
TANK
D CB-2
LOD
LO
PROPOSED
LOD
LO
D
LO TRASH
D
SCE
ENCLOSURE
LOD
26"
LOD
LOD
LOD
LO
YD-4
D
CB-1
YD-3 LO
LOD LOD
D
LOD
LO LOD
D
LOD
CB-4
LOD
FD-1
SCE
D
LO
PROPOSED
LOD
SIDEWALK
LOD LOD
LOD LOD LOD
LOD
YD-1
LOD
LOD
LOD
HVAC
LO
LOD LOD
D
LOD
OIL
L
TANK
OD
LOD LOD
LOD LOD
AMMENDED SITE PLAN
LOD
LO
LOD
LOD
D
LOD
LOD
LOD
CB-3 D
LO
LOD
LOD
LOD
YESHIVA OHR HAMEIR
LO
D
LOD
LOD
LO
D TEMPORARY CONS
TRUCTION FENCE
LOD
LO
LOD
LOD
D
Prepared For
LOD
LOD
LOD
LO
LOD
D
LOD
LO
D
APPROXIMATE FEMA
LOD
LIMIT OF DISTURBANCE
LOD
100-YEAR FLOOD
LOD
LO
D
ELEVATION 308.3 4.43 ACRES
LOD
LOD
LO
LOD
D
LOD LOD TEMPORARY
LO
D LO
D
CONSTRUCTION
FENCE
LOD
LOD
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
LOD
D
UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS
DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE SCALE: 1"=40'
NEW YORK STATE EDUCATION LAW.
Page 29
16
SHEET NUMBER
PS SMH-1 SMH-2 SMH-3 SMH-4 SMH-5 SMH-6 SMH-7
6 3 TOWN COMMENTS 10-13-25
5 TOWN COMMENTS 1-26-26
4 MISC. REVISIONS 12-17-25
6 TOWN COMMENTS 2-9-26
ORIGINAL DATE: 3/4/2024
PROJECT NUMBER:
I V.
. UMPN
1 DRAFT 1-29-25
330 330
2 DRAFT3-3-2025REVP
320 320
310 310
CIARCIA ENGINEERING, P.C.
YORKTOWN HEIGHTS, NY 10598
300 300
360 UNDERHILL AVENUE
(914) 245-0123
290 290
-0+10
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00
1" = 40' H
1" = 8' V
44.8-5-24 44.12-2-35
E
W
AC
0+50.00
N
X
W
FUR
X
ROAD
W
W
X
X
FM
W
FM
X
X
FM
FM FM
W
FM
FM
W
APPROXIMATE LOCATION OF
FM
PROPOSED
FM
EXISTING 1" COPPER WATER
CURB
PROPOSED ON-SITE
FM
W
PROPOSED SERVICE TO REMAIN
FM
PAVEMENT
FM
W
FM
FM
FM
WIDENING
SEWER DESIGN
FM
W
W
APPROXIMATE LOCATION OF
FM
FM W
FM
W
EXISTING 2" COPPER WATER
FM
SERVICE TO REMAIN
W
FM
X
FM
0+00
0
.00 SMH-1
W
0.0
E
1+5
AL
SW
W
N PROPOSED 2"COP
SIO DOMESTIC SERV PER
W
ER ICE
1+0 DIV PROPOSED
W
0.00 BUILDING
W
W PROPANE
PROPOSED 4"DIP
W
W W
W TANK
CL54 FIRE SERVICE
W
W
2+0 PROPOSED 4"DIP
0.0PROPA
0 TANK
NE W
CL54 FIRE SERVICE PROPOSED 2"COP
PER
W
W
W
CLEAR INSIDE
CAB LEGTH DOMESTIC SERVICE
SMH-2
ENTRANCE
CLEAR INSIDE
CL CAB WIDTH ENTRANCE
CL
W YD-2
W
CL
W
RELOCATED
2+
PROPANE
W
W
W
TANK
50
W
W W
W W
W
W
W W W
W W
.00
W
CB-2 W
W
W W
X
W
W
W W X
PROPOSED W W
PROPOSED W W
W
CURB
W
W
W
W TRASH W
ENCLOSURE
W
W
W
PROPOSED
W
SMH-5 PAVEMENT 6+00.00
W
W
W
W
SMH-6
W
7+00.00
W
PROPOSED W
W
CURB YD-4
W
W
W
3+
.00
00
CB-1
W
00
YD-3
.00
5+
AMMENDED SITE PLAN
W
SMH-3 3+
W
50
.00
4+00.00
W
CB-4
SMH-4
YESHIVA OHR HAMEIR
W
FD-1
W
PROPOSED PROPOSED
GUIDERAIL SMH-7 SIDEWALK
W
7+61.78
W
YD-1
Prepared For
W
W
W
W
W
W
HVAC
W
4+50.00
W
OIL
X
TANK
W
X
W
W
CB-3
W
PROPOSED
HYDRANT
W
PROPOSED 4"DIP
W
W
W
W
W
W
5+5CL54 FIR
0.00 E SERVICE
W
W
W
W W
W
W
6+50.00
W
W
W
W
W
W
W
REPLACE
PROPOSED 2"COP
ASPHALT
DOMESTIC SERV PER
ICE
PAVEMENT
UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS
DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE
NEW YORK STATE EDUCATION LAW.
SCALE: 1"=40'
Page 30
16
SHEET NUMBER
7 3 TOWN COMMENTS 10-13-25
5 TOWN COMMENTS 1-26-26
7 TOWN COMMENTS 2-18-26
4 MISC. REVISIONS 12-17-25
6 TOWN COMMENTS 2-9-26
ORIGINAL DATE: 3/4/2024
PROJECT NUMBER:
I V.
. UMPN
1 DRAFT 1-29-25
2 DRAFT3-3-2025REVP
330 330
320 320
310 310
CIARCIA ENGINEERING, P.C.
YORKTOWN HEIGHTS, NY 10598
300 300
360 UNDERHILL AVENUE
0+00 0+50 1+00 1+50 1+90
(914) 245-0123
CAFETERIA BUILDING STORM PROFILE
1" = 40' H
1" = 8' V
44.8-5-24 44.12-2-35
E
N AC
X
FUR
X
ROAD
X
X
FM
FM
X
X
FM
FM FM
FM
FM
APPROXIMATE LOCATION OF
FM
PROPOSED
FM
EXISTING 1" COPPER WATER
CURB
PROPOSED ON-SITE
FM
PROPOSED SERVICE TO REMAIN
FM
PAVEMENT
FM
FM
FM
FM
WIDENING
STORM DESIGN
FM
APPROXIMATE LOCATION OF
FM
FM
FM
EXISTING 2" COPPER WATER
FM
SERVICE TO REMAIN
FM
X
FM
E
AL
SW
N
SIO
VER
DI PROPOSED
BUILDING
PROPANE
TANK
PROPANE
0
0.0
TANK ENTRANCE
CL
CLEAR INSIDE
CAB LEGTH
CLEAR INSIDE
CAB WIDTH ENTRANCE
CL
YD-2
0+0
CL
RELOCATED
PROPANE
TANK
CB-2 X
X
PROPOSED PROPOSED
CURB TRASH
ENCLOSURE
PROPOSED
PAVEMENT
PROPOSED
CURB YD-4
CB-1
YD-3
0 .00
1+0
AMMENDED SITE PLAN
CB-4
YESHIVA OHR HAMEIR
FD-1
39 PROPOSED PROPOSED
0. GUIDERAIL SIDEWALK
1+9
YD-1
Prepared For
HVAC
OIL
X
TANK
X
CB-3
TEMPORARY CONS
TRUCTION FENCE
REPLACE
ASPHALT
PAVEMENT
UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS
DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE
NEW YORK STATE EDUCATION LAW.
SCALE: 1"=40'
Page 31
16
SHEET NUMBER
8
WATERMAIN PROFILE WATERMAIN INSTALLATION STANDARDS
340 340
ORIGINAL DATE: 10/13/2025
¾” ”
1 MISC. REVISIONS 12-17-25
2 TOWN COMMENTS 2-9-26
1" = 40' H
1" = 8' V
PROJECT NUMBER:
330 330
4
5
3
320 320
310 310
CIARCIA ENGINEERING, P.C.
YORKTOWN HEIGHTS, NY 10598
300 300
360 UNDERHILL AVENUE
(914) 245-0123
290 290
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00
0+00.00
PROPOSED NEW
W
WATER VALVES
WOO
W
DS
W
X
E W
AC
N 0+50.00
X
W
R
FU X ROAD
W
W
X
X
W
X
X
W
20'
.00
20'
PROPOSED ON-SITE
W
WATERMAIN APPROXIMATE LOCATION OF
0
EASEMENT EXISTING 1" COPPER WATER
1+0
W
SERVICE TO REMAIN
W
20'
WATERMAIN
W
W
W
W
APPROXIMATE LOCATION OF
EXISTING 2" COPPER WATER
SERVICE TO REMAIN
W
X
.00
W
SMH-1
0
E
1+5
AL
SW
W
N PROPOSED 2"COP
O PER
SI DOMESTIC SERV
W
ER ICE
V
DI
W
W
2+00.00
W
PROPOSED 4"DIP
W
W W
W
CL54 FIRE SERVICE
W
W
PROPOSED 4"DIP
W
CL54 FIRE SERVICE PROPOSED 2"COP
PER
W
W
W
CLEAR INSIDE
CAB LEGTH
DOMESTIC SERV ICE
SMH-2
ENTRANCE
CLEAR INSIDE
CL CAB WIDTH ENTRANCE
CL
W YD-2
W
CL
W
W
2+
W
W
50
W
W W
W W
W
W
W W W
W W
.00
W
CB-2 W
W
W W
X
W
W
W W X
W W
W W
W W
¾”
W
W W
W
W
W
W
26"
W
SMH-5
W
3+
W
W
SMH-6
00
W
W
.00
W
W
W
W
W
YD-4
W
AMMENDED SITE PLAN
CB-1
W
YD-3
W
3+
SMH-3 ¾”
W
50
¾”
YESHIVA OHR HAMEIR
.00
W
CB-4
SMH-4
W
FD-1
W
PROPOSED
GUIDERAIL SMH-7
W
Prepared For
4+00.00
W
YD-1
W
W
W
W
W
W
W
4+50.00
W
X
W
X
W
W
CB-3
W
6+78.38
PROPOSED
5+
HYDRANT
00
W
.0
PROPOSED 4"DIP
0
W
W
W
W
W
5+5CL 54 FIR
0.00 E SERVICE
W
6+00.00
W
W
W
W
W
W
W
6+50.00
W
W
W
W
W
W
W
PROPOSED 2"COP
DOMESTIC SERV PER UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS
ICE DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE
NEW YORK STATE EDUCATION LAW.
SCALE: 1"=40'
Page 32
16
SHEET NUMBER
8
WATERMAIN PROFILE WATERMAIN INSTALLATION STANDARDS
340 340
ORIGINAL DATE: 10/13/2025
¾” ”
1 MISC. REVISIONS 12-17-25
2 TOWN COMMENTS 2-9-26
1" = 40' H
1" = 8' V
PROJECT NUMBER:
330 330
4
5
3
320 320
310 310
CIARCIA ENGINEERING, P.C.
YORKTOWN HEIGHTS, NY 10598
300 300
360 UNDERHILL AVENUE
(914) 245-0123
290 290
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00
0+00.00
PROPOSED NEW
W
WATER VALVES
WOO
W
DS
W
X
E W
AC
N 0+50.00
X
W
R
FU X ROAD
W
W
X
X
W
X
X
W
20'
.00
20'
PROPOSED ON-SITE
W
WATERMAIN APPROXIMATE LOCATION OF
0
EASEMENT EXISTING 1" COPPER WATER
1+0
W
SERVICE TO REMAIN
W
20'
WATERMAIN
W
W
W
W
APPROXIMATE LOCATION OF
EXISTING 2" COPPER WATER
SERVICE TO REMAIN
W
X
.00
W
SMH-1
0
E
1+5
AL
SW
W
N PROPOSED 2"COP
O PER
SI DOMESTIC SERV
W
ER ICE
V
DI
W
W
2+00.00
W
PROPOSED 4"DIP
W
W W
W
CL54 FIRE SERVICE
W
W
PROPOSED 4"DIP
W
CL54 FIRE SERVICE PROPOSED 2"COP
PER
W
W
W
CLEAR INSIDE
CAB LEGTH
DOMESTIC SERV ICE
SMH-2
ENTRANCE
CLEAR INSIDE
CL CAB WIDTH ENTRANCE
CL
W YD-2
W
CL
W
W
2+
W
W
50
W
W W
W W
W
W
W W W
W W
.00
W
CB-2 W
W
W W
X
W
W
W W X
W W
W W
W W
¾”
W
W W
W
W
W
W
26"
W
SMH-5
W
3+
W
W
SMH-6
00
W
W
.00
W
W
W
W
W
YD-4
W
AMMENDED SITE PLAN
CB-1
W
YD-3
W
3+
SMH-3 ¾”
W
50
¾”
YESHIVA OHR HAMEIR
.00
W
CB-4
SMH-4
W
FD-1
W
PROPOSED
GUIDERAIL SMH-7
W
Prepared For
4+00.00
W
YD-1
W
W
W
W
W
W
W
4+50.00
W
X
W
X
W
W
CB-3
W
6+78.38
PROPOSED
5+
HYDRANT
00
W
.0
PROPOSED 4"DIP
0
W
W
W
W
W
5+5CL 54 FIR
0.00 E SERVICE
W
6+00.00
W
W
W
W
W
W
W
6+50.00
W
W
W
W
W
W
W
PROPOSED 2"COP
DOMESTIC SERV PER UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS
ICE DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE
NEW YORK STATE EDUCATION LAW.
SCALE: 1"=40'
Page 33
16
SHEET NUMBER
9 3 TOWN COMMENTS 10-13-25
5 TOWN COMMENTS 1-26-26
7 TOWN COMMENTS 2-18-26
4 MISC. REVISIONS12-17-25
6 TOWN COMMENTS 2-9-26
ORIGINAL DATE: 3/4/2024
340 340
PROJECT NUMBER:
GRADE BREAK STA = 0+00.75
110.949VC
I V.
. UMPN
1 DRAFT 1-29-25
50.000VC
2 DRAFT3-3-2025REVP
-6.4
6%
ELEV = 324.091
330 330
50.000VC
81.738VC
GRADE BREAK STA = 2+59.89
-3.48%
330 330 320 -8.9 320
6%
ELEV = 310.139
0.19%
75.000VC -0.10%
CIARCIA ENGINEERING, P.C.
320 -10
.81 320 310 310
%
YORKTOWN HEIGHTS, NY 10598
360 UNDERHILL AVENUE
-1.03%
310 310 300 300
(914) 245-0123
300 300 290 290
0+00 0+50 1+00 1+50 2+00 2+50 2+70 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50
1" = 40' H 1" = 40' H
1" = 8' V 1" = 8' V
0+00.00
W
0 OO
BP: 0+00.0 DS
PROPOSED ROAD PROFILE
A CE
FU RN ROAD
.42
PC: 0+41
0+50.00
FM
FM
FM
FM
FM
FM
FM
4
FM
7
FM
Mid: 0+6
8.51
FM
PROPOSED
FM
CURB PROPOSED
PAVEMENT
FM
.00
20' WIDENING
0
FM
0.0
0
FM
1+5 1+00.
1+0
FM
00
FM
PT
: 0+
FM
0+50. 1H
00 95.
FM
0+00. 60
E 00
00
AL 3
SW 1+50.00 PC
2+00.
O
N : 1+
R SI 24.
VE 08
DI PROPOSED
BUILDING
1H Mid: 1+63.33
.57 PROPANE
+ 02 TANK
:2
0 .0
PT
2+
4
026+50
00
PROPANE
TANK 2
.00
YD-2
2+70.
RELOCATED
PROPANE
TANK
CB-2
2+
PROPOSED PROPOSED
50
CURB TRASH
ENCLOSURE
.00
PROPOSED
26"
PAVEMENT
4
PROPOSED 8.3
CURB +0
:3
3+
YD-4
PCCB-1
00
YD-3
.00
AMMENDED SITE PLAN
11
3 +36.
Mid:
CB-4
3+50.00
YESHIVA OHR HAMEIR
FD-1
PROPOSED PROPOSED
GUIDERAIL SIDEWALK
PT: 3+63.89
YD-1
Prepared For
4+00.00
HVAC
OIL
TANK
PT: 5+03.89
EP: 6+50.31
73
4+50.00
CB-3
7 7.
+
:4
PC:id4+51.56
M
TEMPORARY CONS
TRUCTION FENCE
5+00.0
0 5+50.00
6+00.00
REPLACE 6+
6+50
50.0
.301
2H ASPHALT
PAVEMENT
13
APPROXIMATE FEMA
100-YEAR FLOOD
ELEVATION 308.3
UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS
DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE
NEW YORK STATE EDUCATION LAW.
SCALE: 1"=50'
Page 34
16
SHEET NUMBER
FIRE TRUCK DATA ADDITIONAL TOWN NOTES:
10 1 TOWN COMMENTS 12-10-25
ORIGINAL DATE: 10/13/2025
5 TOWN COMMENTS 2-18-26
3 TOWN COMMENTS 1-26-26
2 MISC. REVISIONS 12-17-25
4 TOWN COMMENTS 2-9-26
PROJECT NUMBER:
MOHEGAN FIRE DEPARTMENT
LADDER TRUCK TEMPLATE ’
’
CIARCIA ENGINEERING, P.C.
WOO
DS
CE
YORKTOWN HEIGHTS, NY 10598
Mohegan 43
A
RN
Mohegan 43
FU ROAD
360 UNDERHILL AVENUE
FM
FM
FM
FM
(914) 245-0123
FM
FM
FM
FM
4
FM
FM
7
FM
APPROXIMATE LOCATION OF
FM
FM
EXISTING 1" COPPER WATER
FM
SERVICE TO REMAIN
FM
FM
FM
FM
FM
20'
FM
APPROXIMATE LOCATION OF
FM
FM
FM
EXISTING 2" COPPER WATER
FM
1H SERVICE TO REMAIN
FM
FM
3
1H
4
3
Mohegan 4
2
FIRE TRUCK TURNING ANALYSIS
YD-2
FIRE PROTECTION PLAN
CB-2
26"
YD-4
CB-1
YD-3
CB-4
FD-1
Mohegan 43
PROPOSED
GUIDERAIL
YD-1
AMMENDED SITE PLAN
CB-3
YESHIVA OHR HAMEIR
TEMPORARY CONS
TRUCTION FENCE
Prepared For
2H
13
APPROXIMATE FEMA
100-YEAR FLOOD
ELEVATION 308.3
TEMPORARY
CONSTRUCTION
FENCE
UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS
DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE SCALE: 1"=40'
NEW YORK STATE EDUCATION LAW.
Page 35
16
SHEET NUMBER
11 1 TOWN COMMENTS 12-10-25
ORIGINAL DATE: 10/13/2025
5 TOWN COMMENTS 2-18-26
3 TOWN COMMENTS 1-26-26
2 MISC. REVISIONS 12-17-25
4 TOWN COMMENTS 2-9-26
PROJECT NUMBER:
CIARCIA ENGINEERING, P.C.
WOO
X
DS
CE
YORKTOWN HEIGHTS, NY 10598
A
RN
X
X
FU ROAD
360 UNDERHILL AVENUE
FM
X
FM
FM
X
FM
(914) 245-0123
FM
FM
X
X
FM
FM
4
FM
FM
7
FM
APPROXIMATE LOCATION OF
FM
FM
EXISTING 1" COPPER WATER
FM
SERVICE TO REMAIN
FM
FM
FM
FM
20'
FM
FM
APPROXIMATE LOCATION OF
FM
FM
FM
20' EXISTING 2" COPPER WATER
FM
1H SERVICE TO REMAIN
FM
X
FM
E 3
AL
SW
N
O
SI
V ER
DI
1H
4
2
X
FIGURE D103.1 ANALYSIS
X
38.6'
25'
2025 FIRE CODE
26'
20'
15'
R26'
150'
PROPOSED
GUIDERAIL
26'WIDE AERIAL FIRE
APPARATUS 26'
ACCESS ROAD
150'
32.3'
X
20' X
AMMENDED SITE PLAN
R28'
PROPOSED
PORUS PAVER
YESHIVA OHR HAMEIR
60' ACCESS ROAD
DEAD-END
APPARATUSFIR E
26'
ACCESS RO
LENGTH 327AD
'
Prepared For
2H
13
APPROXIMATE FEMA
100-YEAR FLOOD
20' ELEVATION 308.3
UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS
DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE SCALE: 1"=40'
NEW YORK STATE EDUCATION LAW.
Page 36
16
SHEET NUMBER
WOVEN WIRE FENCE SYMBOL
(MIN. 14 1/2 GAUGE 50'MIN. EXISTING SYMBOL
W/ MAX. 6" MESH PAVEMENT
3' 5 OPTIONAL SEDIMENT BASIN DEWATERING
12
10' MAX. C. TO C.
SPACING) :1 FLOW
6"MIN.
DEVICE - I WITH 6" MIN. PERFORATED RISER
36" MIN. LENGTH FENCE FILTER MOUNTABLE BERM
EXISTING
POSTS DRIVEN MIN. 16" CLOTH PROFILE (OPTIONAL)
GROUND CAP END UNLESS EQUAL TO
INTO GROUND. OR GREATER THAN ELEV. OF
50'MIN.
TOP OF FILL PRIMARY RISER CREST
ANTI-VORTEX
DEVICE
2 TOWN COMMENTS 10-13-25
HEIGHT OF FILTER
10'MIN.
= 16" MIN. 1" PERFORATIONS
3 TOWN COMMENTS 2-9-26
1 MISC. REVISIONS 4-18-25
ORIGINAL DATE: 3/4/2024
EXISTING 2
1 MIN. 6"
GROUND
W RISER DIAMETER CMP FILTER CLOTH OVER
8" MIN.
LO W
PROJECT NUMBER:
F O 12'MIN. EXISTING FLOW WIRE MESH
FL 12'MIN.
PAVEMENT FLOW APPROXIMATE ORIFICE PLATE
PERSPECTIVE VIEW LOCATION
PLAN VIEW MIN. 6" DIA. NYS DOT #2 STONE
10'MIN.
36" MIN. FENCE POST PIPE CORE CONTINUOUS BAND
EXCAVATED AREA (AS REQUIRED)
WOVEN WIRE FENCE (MIN. 14 1/2
BARREL
GAUGE W/ MAX. 6" MESH SPACING)
WITH FILTER CLOTH 20"MIN.
CONSTRUCTION SPECIFICATIONS SIDE SLOPE 2:1
RISER BASE BASE PLATE (1/4")
FLOW
4
5
SIZE: D+24
UNDISTURBED GROUND 1. STONE SIZE - USE 2" STONE, OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT. PERFORATIONS OR SLITS MUST NOT
BE MADE ANY LOWER THAN 6" ABOVE
COMPACTED SOIL 2. LENGTH - NOT LESS THAN 50 FEET (EXCEPT ON A SINGLE RESIDENCE LOT WHERE EXCAVATED DEPTH TOP OF HORIZONTAL OUTFALL BARREL.
16"MIN. A 30 FOOT MINIMUM LENGTH WOULD APPLY). MIN. 1' TO A MAX. 2' WEEP HOLES GRAVEL SUPPORTED BY
EMBED FILTER CLOTH
BELOW TOP OF FOR HARDWARE CLOTH TO PERFORATIONS - 6" SPACING HORIZONTAL &
A MIN. OF 6" IN GROUND. 3. THICKNESS - NOT LESS THAN SIX (6) INCHES.
4"
INLET. DEWATERING ALLOW DRAINAGE AND RESTRICT VERTICAL LOCATED IN CONCAVE.
SECTION VIEW 4. WIDTH - TWELVE (12) FOOT MINIMUM, BUT NOT LESS THAN THE FULL WIDTH AT SEDIMENT MOVEMENT.
POINTS WHERE INGRESS OR EGRESS OCCURS. TWENTY-FOUR (24) FOOT IF SINGLE
ENTRANCE TO SITE.
CONSTRUCTION SPECIFICATIONS OPTIONAL SEDIMENT BASIN DEWATERING
5. FILTER CLOTH - WILL BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING
OF STONE. DEVICE - II
1. WOVEN WIRE FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES
OR STAPLES. POSTS SHALL BE STEEL EITHER "T" OR "U" TYPE OR HARDWOOD. 6. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CON- POND
STRUCTION ENTRANCES SHALL BE PIPED ACROSS THE ENTRANCE. IF PIPING IS CONSTRUCTION SPECIFICATIONS EMBANKMENT
CIARCIA ENGINEERING, P.C.
2. FILTER CLOTH TO BE TO BE FASTENED SECURELY TO WOVEN WIRE 6" X 1/2" DIAM. ROD BOLTED OR
IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED. WELDED TO RISER
FENCE WITH TIES SPACED EVERY 24" AT TOP AND MID SECTION.
FENCE SHALL BE WOVEN WIRE, 12 1/2 GAUGE, 6" MAXIMUM MESH OPENING. 7. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL 1. CLEAR THE AREA OF ALL DEBRIS THAT WILL HINDER EXCAVATION. 8" MIN. DIAMETER PERFORATED PIPE
PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHTS-OF-WAY, ALL WRAPPED WITH FILTER 20'
2. GRADE APPROACH TO THE INLET UNIFORMLY AROUND THE BASIN. MIN.
3. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE OVER- SEDIMENT SPILLED, DROPPED, WASHED OR TRACTED ONTO PUBLIC RIGHTS-OF-WAY CLOTH.
LAPPED BY SIX INCHES AND FOLDED. FILTER CLOTH SHALL BE EITHER FILTER X, MUST BE REMOVED IMMEDIATELY. 3. WEEP HOLES SHALL BE PROTECTED BY GRAVEL. 12"MIN. LAYER NYS DOT #2 STONE
YORKTOWN HEIGHTS, NY 10598
MIRAFI 100X, STABILINKA T140N, OR APPROVED EQUIVALENT. 8. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON A AREA STABILIZED WITH OUTFLOW
4. UPON STABILIZATION OF CONTRIBUTING DRAINAGE AREA, SEAL WEEP HOLES,
STONE AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. 12"MIN. LAYER NYS DOT #2 STONE
FILL EXCAVATION WITH STABLE SOIL TO FINAL GRADE, COMPACT IT PROPERLY
360 UNDERHILL AVENUE
4. PREFABRICATED UNITS SHALL BE GEOFAB, ENVIROFENCE, OR APPROVED EQUIVALENT.
AND STABILIZE WITH PERMANENT SEEDING. CAP END WELDED OR CEMENTED JOINT
9. PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH
5. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN RAIN. MAXIMUM DRAINAGE AREA 1 ACRE OF PIPE (WITH ADAPTER IF NECESSARY)
"BULGES" DEVELOP IN THE SILT FENCE.
(914) 245-0123
U.S. DEPARTMENT OF AGRICULTURE STABILIZED ADAPTED FROM DETAILS PROVIDED BY: USDA - NRCS,
U.S. DEPARTMENT OF AGRICULTURE NATURAL RESOURCES CONSERVATION SERVICE
EXCAVATED DROP
ADAPTED FROM DETAILS PROVIDED BY: USDA - NRCS, RISER PIPE
NATURAL RESOURCES CONSERVATION SERVICE
SILT FENCE NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION CONSTRUCTION NEW YORK STATE DEPARTMENT OF TRANSPORTATION, NEW YORK STATE DEPARTMENT OF TRANSPORTATION,
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION NEW YORK STATE SOIL & WATER CONSERVATION COMMITTEE NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION,
INLET PROTECTION NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION, DEWATERING DEVICES
NEW YORK STATE SOIL & WATER CONSERVATION COMMITTEE
ENTRANCE NEW YORK STATE SOIL & WATER CONSERVATION COMMITTEE NEW YORK STATE SOIL & WATER CONSERVATION COMMITTEE
TO BE USED WHERE TOPSOIL PRESERVATION IS NECESSARY FOR REGRADING AND
VEGETATING DISTURBED AREAS. TOPSOIL IS APPLIED TO SUBSOILS THAT ARE DROUGHTY
(HAVING LOW AVAILABLE MOISTURE FOR PLANTS), STONY, SALTY, HAVE LOW
PERMEABILITY, OR ARE EXTREMELY ACID. IT IS ALSO USED TO BACKFILL AROUND SHRUB
AND TREE TRANSPLANTS. PRESERVATION OF EXISTING TOPSOIL IS BENEFICIAL FOR ALL
TYPES OF LAWN OR ORNAMENTAL PLANTINGS.
DETAILS
TEMPORARY STOCKPILE STABILIZATION MEASURES INCLUDE VEGETATIVE COVER, MULCH,
NON- VEGETATIVE COVER, AND PERIPHERAL SEDIMENT TRAPPING BARRIERS. THE
STABILIZATION MEASURE(S) SELECTED SHOULD BE APPROPRIATE FOR THE TIME OF YEAR,
SITE CONDITIONS, AND REQUIRED DURATION OF USE.
1. AREA CHOSEN FOR STOCKPILING OPERATIONS SHALL BE DRY AND
STABLE.
2.MAXIMUM SLOPE OF STOCKPILE SHALL BE 1:2.
3.UPON COMPLETION OF SOIL STOCKPILING, EACH PILE SHALL BE
SURROUNDED WITH EITHER SILT FENCING OR STRAW BALES, THEN
STABILIZED WITH VEGETATION OR COVERED.
CATCH BASIN
STORM DRAIN/ SOIL STOCKPILING
N.T.S.
SANITARY SEWER
WATER MAIN CROSSING
WATER SERVICE
CONNECTION
STORM/SANITARY SEWER
AMMENDED SITE PLAN
WATER LINE
10 FT. MIN.
VALVES SHALL BE "MUELLER"
SEPARATION
YESHIVA OHR HAMEIR
NON-RISING STEM
Prepared For
STORM SEWER/WATER SEPARATION WATER CONNECTIONS SECTION
WATERMAIN BEDDING
ALL THRUST BLOCKS SHALL BE A MINIMUM OF 3,500 PSI CONCRETE.
UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS THRUST BLOCK DETAIL
DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE
NEW YORK STATE EDUCATION LAW. N.T.S.
Page 37
16
SHEET NUMBER
SYMBOL
13
CLEAN WATER
DISCHARGE HOSE
PUMP
A
ORIGINAL DATE: 10/13/2025
1 TOWN COMMENTS 2-9-26
EDGE OF DISTURBED AREA
12 - 18"
PROJECT NUMBER:
TYPICAL SECTION GROUND WATER GROUND
TABLE WATER TABLE
DRIP LINE
PLAN
12"-24" DIAMETER
PERFORATED
CORRUGATED OR SIDE SLOPE
4
2
5
3
PVC PIPE VARIABLE
NYS DOT #2 OR
EQUIVALENT
WASHOUT SIGN
12"
CIARCIA ENGINEERING, P.C.
WATERMAIN INSTALLATION STANDARDS
CONCRETE WASHOUT STATION
TREE PROTECTION FENCE ¾” ”
CONSTRUCTION SPECIFICATIONS
YORKTOWN HEIGHTS, NY 10598
1. PIT DIMENSIONS ARE VARIABLE.
360 UNDERHILL AVENUE
4"- 6" Instructions Staple Pattern
(10 - 15cm) 2. THE STANDPIPE SHOULD BE CONSTRUCTED BY PERFORATING A 12-24" DIAMETER
1. Prepare soil before installing rolled erosion control Guide
CORRUGATED OR PVC PIPE.
(914) 245-0123
products (RECPs), including any necessary application
of lime, fertilizer, and seed. Ground surface must be
12" (30 cm)
free of debris, rocks, clay clods and raked smooth 4 - 6" 3. A BASE OF NYS DOT #2 OR EQUIVALENT AGGREGATE SHOULD BE PLACED IN THE
sufficient to allow intimate contact of the RECP with Plan View 10 - 15 cm
PIT TO A DEPTH OF 12". AFTER INSTALLING THE STANDPIPE, THE PIT SURROUNDING
the soil over the entirety of the installation.
4 2. Begin at the top of the slope by anchoring the RECPs THE STANDPIPE SHOULD BE BACKFILLED WITH NYS DOT #2 OR EQUIVALENT AGGREGATE.
6"
(15 cm) in a 6" (15 cm) deep X 6" (15 cm) wide trench.
Anchor the RECPs with a row of staples/stakes/pins 4. THE STANDPIPE SHOULD EXTEND 12-18" ABOVE THE LIP OF THE PIT.
spaced at ST apart in the bottom of the trench. ST
Backfill and compact the trench after stapling and 5. IF DISCHARGE WILL BE PUMPED DIRECTLY TO A STORM DRAINAGE SYSTEM,
3B 2 fold the roll over downslope. Secure RECPs over ST
LT
compacted soil with a row of staples/stakes/pins THE STANDPIPE SHOULD BE WRAPPED WITH FILTERCLOTH BEFORE INSTALLATION.
spaced at ST apart across the width of the RECPs. ST IT IS RECOMMENDED THAT 1/4"-1/2" HARDWARE CLOTH MAY BE PLACED AROUND THE
3. Roll the RECPs (A) down or (B) horizontally across the
slope. RECPs will unroll with appropriate side against STANDPIPE, PRIOR TO ATTACHING THE FILTERCLOTH.
the soil surface. All RECPs must be securely fastened WT
to soil surface by placing staples/stakes/pins in Unroll
Direction
appropriate locations as shown in the staple pattern 4" OUTLET ADAPTED FROM DETAILS PROVIDED BY: USDA - NRCS,
guide. RollMax RECPs and ECBs should utilize Staple
Pattern C, TRMs and VMax materials should utilize
NEW YORK STATE DEPARTMENT OF TRANSPORTATION, DEWATERING
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION,
Staple Pattern D.
4. The edges of parallel RECPs must be stapled with
Underneath
Roll Roll Overlap NEW YORK STATE SOIL & WATER CONSERVATION COMMITTEE
SUMP PIT
approximately 4" - 6" (10 - 15 cm) overlap.
4"- 6" 5. Consecutive RECPs spliced down the slope must Upper Roll
(10 - 15cm) overlapped with the upstream mat atop the Pin / Staple / Twist Pin, as
downstream mat (shingle style). The overlap should appropriate for field conditions
be 4" - 6" (10 - 15 cm).
3A 6. At the terminal end, secure each mat across the
Staple Pattern
width with a row of staples/stakes/pins spaced at ST.
5
If exposed to flow, foot traffic, wind uplift or other
disruption, trench the terminal end in as shown in
Dimension C D TOWN OF CORTLANDT NOTES:
detail. WT 30" (75 cm) 24" (60 cm) 1. ALL SEWER MAINS & SEWER SERVICES SHOWN ON THESE PLANS
1 7. Fasteners should provide a minimum of twenty SHALL BE POLYVINYL CHLORIDE (PVC) SDR35 OR SDR26.
pounds of pullout resistance. Six-inch (10 cm) X LT 30" (75 cm) 20" (50 cm)
12" (30 cm) one-inch (2.5 cm) eleven gauge staples are typically 2. HEAVY-DUTY WHITE FITTINGS AS MANUFACTURED BY GPK
adequate. In loose soils, longer staples may be ST 18" (45 cm) 18" (45 cm) PRODUCTS, INC. OR APPROVED EQUAL SHALL BE USED FOR THE
necessary, twist pins can provide the greatest pullout CONSTRUCTION OF THE PVC SEWER SYSTEM.
6" Nominal
resistance. In hard or rocky soils, straight pins may by 1.7 / SY 3.0 / SY
DETAILS
(15 cm) Frequency
used where staples or twist pins are refused, provided
the minimum pullout requirements are met. ECB TRM
3. SEWERS SHALL BE LAID AT LEAST 10 FEET HORIZONTALLY FROM
Bio-degradable fasteners shall not be used with VMax
Application
(Degradable) (Permanent) ANY EXISTING OR PROPOSED WATER MAIN. THE DISTANCE SHALL
6 (TRM) or TMax (HPTRM) materials. BE MEASURED EDGE TO EDGE. IN CASES WHERE IT IS NOT
*Note: Staple Pattern A and B used prior to 8/2019 PRACTICAL TO MAINTAIN A 10 FOOT SEPARATION, THE
have been discontinued. WESTCHESTER COUNTY DEPARTMENT OF HEALTH MAY ALLOW
6" (15 cm) DEVIATION ON A CASE-BY-CASE BASIS, IF SUPPORTED BY DATA
FROM THE DESIGN ENGINEER.
EROSION BLANKET 4. SEWERS CROSSING WATER MAINS SHALL BE LAID TO PROVIDE A
MINIMUM VERTICAL DISTANCE OF 18 INCHES BETWEEN THE
OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF THE SEWER.
THIS SHALL BE THE CASE WHERE THE WATER MAIN IS EITHER
ABOVE OR BELOW THE SEWER. THE CROSSING SHALL BE
ARRANGED SO THAT THE SEWER JOINTS WILL BE EQUIDISTANT
AND AS FAR AS POSSIBLE FROM THE WATER MAIN JOINTS.
WHERE A WATER MAIN CROSSES UNDER A SEWER, ADEQUATE
STRUCTURAL SUPPORT SHALL BE PROVIDED FOR THE SEWER TO
MAINTAIN LINE AND GRADE.
EROSION CONTROL NOTES:
5. SANITARY SEWER SERVICE LINES SHALL BE TESTED IN
CONJUNCTION WITH THE SEWER MAINS TO THE PROPERTY LINE
OR EASEMENT LINE IN ACCORDANCE WITH THE LATEST
WESTCHESTER COUNTY DEPARTMENT OF HEALTH RULES &
REGULATIONS.
6. TESTING OF THE MANHOLES WITH THE PIPELINE SHALL NOT BE
PERMITTED. MANHOLES & SANITARY SEWER LINES SHALL BE
TESTED INDEPENDENTLY OF EACH OTHER.
AMMENDED SITE PLAN
7. MANHOLES & SANITARY SEWER LINES SHALL BE TESTED TO
CONFORM WITH WESTCHESTER COUNTY DEPARTMENT OF HEALTH
RULES & REGULATIONS IN THAT THE INFILTRATION/EXFILTRATION
YESHIVA OHR HAMEIR
SHALL NOT EXCEED ONE HUNDRED (100) GALLONS/INCH
DIAMETER OF PIPE/MILE/DAY.
GUIDERAIL DETAIL 8. AIR & VACUUM TESTING MAY BE PERFORMED ON THE SANITARY
SEWER LINES AND MANHOLES IN LIEU OF HYDROSTATIC TESTING.
AIR TESTING OF THE SANITARY SEWER LINES SHALL BE IN
ACCORDANCE WITH ASTM F1417-92 ASTANDARD TEST METHOD
Prepared For
FOR INSTALLATION ACCEPTANCE OF PLASTIC GRAVITY SEWER
LINES USING LOW-PRESSURE AIR@. VACUUM TESTING OF THE
MANHOLES SHALL BE IN ACCORDANCE WITH THE LATEST RELEASE
OF ATTACHMENT B AVACUUM TESTING OF MANHOLES@ FROM
¾” THE WESTCHESTER COUNTY DEPARTMENT OF HEALTH.
9. ALL REQUIRED APPROVALS BY GOVERNING AGENCIES SHALL BE
PROVIDED TO THE TOWN OF CORTLANDT PRIOR TO THE START OF
CONSTRUCTION.
10. THE OWNER/APPLICANT SHALL BE RESPONSIBLE FOR ACQUIRING
SUPERVISION OF THE CONSTRUCTION OF THE SANITARY SEWER
MAIN SYSTEM BY A PERSON OR FIRM QUALIFIED TO PRACTICE
PROFESSIONAL ENGINEERING IN THE STATE OF NEW YORK.
¾”
¾” 11. THE OWNER/APPLICANT SHALL BE RESPONSIBLE FOR PROVIDING
THREE (3) COPIES OF AS-BUILT DRAWINGS AND ONE (1) MYLAR
SIGNED AND SEALED BY A LICENSED NEW YORK LAND SURVEYOR
AND A COPY OF THE AS-BUILT PLAN IN AUTOCAD RELEASE TO THE
TOWN OF CORTLANDT AT THE COMPLETION OF CONSTRUCTION.
12. COPIES OF ALL CERTIFICATIONS, TESTING RESULTS, COMPLETED
WORKS, ETC. SHALL BE PROVIDED TO THE TOWN OF CORTLANDT
UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS AT THE COMPLETION OF CONSTRUCTION.
DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE
NEW YORK STATE EDUCATION LAW.
Page 38
SANITARY SEWER NOTES:
16
SHEET NUMBER
WYE 45° BEND
IN SEWER
MAIN
PVC OR DIP SEWER SERVICE LINE FINISHED GRADE
14
TOPSOIL (4" MIN.), SEED AND
MIN. SLOPE 1/4" PER FT., (2%) MULCH OR WHEN IN PAVEMENT
48" SEE PAVEMENT DETAIL
GROUND SURFACE
3'-6" MIN. (SEWER SERVICE)
PVC SANITARY SEWER SERVICE LINES AND SEWER MAINS
IN OFF ROAD AREAS SHALL HAVE METALLIC TAPE LABELED
4' MIN. (SEWER MAINS)
Exterior Of Manhole Shall "CAUTION SEWER LINE BELOW" SET AT BOTH 12" AND 24"
12"
4"-6" MIN. 3/4" WASHED Bench Have A Bitumastic Coating BELOW FINISHED GRADE OVER CENTERLINE OF SEWER PIPES.
GRAVEL OR CRUSHED STONE
Reinforced Polypropylene
Steps (see detail) PIPES SHALL BE BACKFILLED WITH SELECT FILL MATERIAL FROM 6" TO 24"
2 TOWN COMMENTS 10-13-25
NOTE:
DEPTH VARIES
ABOVE THE TOP OF THE PIPE. SELECT FILL SHALL CONSIST OF SOIL WITH
5 TOWN COMMENTS 2-18-26
3 MISC. REVISIONS 12-17-25
NO STONES GREATER THAN 2" IN DIAMETER.
1 MISC. REVISIONS 4-18-25
ORIGINAL DATE: 3/4/2024
ALL CONNECTIONS BETWEEN EXISTING
4 MISC. REVISIONS 2-9-26
SANITARY SEWER SERVICE LINES AND NEW ALL BACKFILL MATERIAL SHALL BE FREE OF ORGANIC AND FROZEN MATERIAL,
SANITARY SEWER SERVICE LINES SHALL BE Inlet and Outlet Height Less Than PLACED IN 12" LIFTS (PRIOR TO COMPACTION) AND COMPACTED WITH A
MADE BY SOLID SLEEVE RIGID COUPLINGS 24 Inches. MECHANICAL TAMPER TO 85%.
shall have a
PROJECT NUMBER:
45 DEG. MAX. OR APPROVED EQUAL. ALL CONNECTIONS Kor-N-Seal Boot
BETWEEN PVC SANITARY SEWER SERVICE Included in
LINES AND CAST IRON SANITARY SEWER Manhole Item INITIAL BACKFILL
3/4" WASHED GRAVEL SERVICE LINES SHALL BE MADE BY GPK HAND OR MACHINE PLACED LITTLE OR
OR CRUSHED STONE TRANSITION COUPLING FITTING OR 8" NO TAMPING REQUIRED ON TOP OF PIPE
APPROVED EQUAL.
PIPE EMBEDMENT
6"
UNDISTURBED EARTH Base and Riser Section
Monolithic Pour
12" Min. 3/4" Crushed Stone SPRINGLINE
D 3/4" WASHED GRAVEL OR
SEWER MAIN CONTRACTOR SHALL BUILD INVERT 60" CRUSHED STONE
TO HALF DIAMETER OF PIPE IN Undisturbed Earth HAUNCHING
FIELD. INVERT SHALL BE
SEWER SERVICE CONNECTION TO NEW MAIN DETAIL TROWELED TO A SMOOTH FINISH. SIEVE DESIGNATION % PASSING
6"
BEDDING
INCLUDED UNDER MANHOLE ITEM 2" 100%
1" 25-50%
4
NO.40 5-25%
NOTE: DETAIL OF CHUTE TROUGH IN MANHOLE UNDISTURBED EARTH NO.200 0-10%
FOR BACKFILLING REQUIREMENTS OF SEWER SERVICE TRENCH WIDTH = D+2' MIN. NYSDOT ITEM#304.14
SEE "SEWER MAIN/SEWER SERVICE TRENCH DETAIL". PAYMENT LIMITS, BEDDING, HAUNCHING SEWER MAIN & SEWER SERVICE
AND INITIAL BACKFILLS
SEWER MAIN/SEWER SERVICE TRENCH DETAIL
NOTES:
#5 Reinforcing 8. CRUSHED STONE SHALL EXTEND TO 12-INCEHS ABOVE SPRING LINE OF
1. NO ROCK IS TO PROJECT INTO WITHIN THE EDGES OF THE TRENCH. IN ROCK
Bars Top & Bottom EXCAVATION PIPE SHALL BE A MIN. OF 6" OVER AND AWAY FROM ROCK. PIPE.
CIARCIA ENGINEERING, P.C.
10. TRENCH BACKFILL, PIPE BEDDING, AND PIPE ZONE BACKFILL SHALL BE
.
2. BACKFILL SHALL BE PLACED SO AS TO NOT DISTURB THE PIPE ALIGNMENT COMPACTED TO 95% MODIFIED PROCTOR.
11. WITHIN THE SPECIFICATION FOR TRENCH BACKFILL (REFERRED TO AS
3. CONTRACTOR SHALL SURROUND THE NEW PIPE WITH 6" OF NYSDOT ITEM SELECT FILL IN DETAIL) REMOVE LINE INDICATING BACKFILL MATERIAL MAY
304.14 ALL AROUND THE OUTSIDE OF THE PIPE. CONTAIN STONES UP TO 6INCHES IN THEIR GREATESTDIMENSION FROM
24-INCEHS ABOVE THE TOP OF PIPE FROM TO BOTTOM OF SUBGRADE.
4. WHEN DETERMINED BY ENGINEER OR DOTS, AND AS DIRECTED, REMOVE
YORKTOWN HEIGHTS, NY 10598
3
UNSUITABLE MATERIAL, AND BACKFILL WITH NYSDOT ITEM 304.14
4" OR SPECIFY THE FOLLOWING SIEVE DESIGNATIONS FOR SELECT BACKFILL.
WASHED GRAVEL AND CRUSHED STONE. COMPACT IN 6" LIFTS.
Area of Circumferential
360 UNDERHILL AVENUE
Steel, .12sq. in per lin. ft.
SIEVE DESIGNATION % PASSING
Both ways 5. FOR CL-54 CEMENTED LINED DIP WATER MAIN AND CI-52 CEMENT LINED DIP 2” 100%
SEWER MAIN, TRENCH SHAL BE 30 INCHES PLUS THE O.D. OF PIPE, AND PIPE 1" 25-50%
4
SHALL BE IN CENTER OF THE TRENCH. NO.40 5-25%
(914) 245-0123
NO. 200 0-10%
6. REMOVE ALL BEDROCK WITHIN 6 INCHES OF PIPE.
7. CONTRACTOR SHALL FOLLOW ALL GUIDELINES ESTABLISHED BY OSHA (TITLE
29 PART 1926.650-652 (SUBPART-P) FOR TRENCHING OPERATIONS. TRENCHES
REINFORCEMENT GREATER THAN 5-FEET IN DEPTH REQUIRE A PROTECTIVE SYSTEM. PRIOR TO
LAYOUT FOR SLAB ANY WORK, CONTRACTOR SHALL SUBMIT TO DOTS FOR REVIEW A TRENCHING
PLAN.
8. RECYCLED FILL / ITEM 4 IS NOT PERMITTED AS BACKFILL.
SEWER MAIN STANDARDS
"
6
/1
3
1
Manhole Wall
3 3/8"
1 3/8"
5/8" "
6
/1
Butyl Rubber 7
5 ”
Federal Specification 1
9 3/4"
SS-S-00210 (GSA-FSS)
”
1"
STEEL REINFORCING
“ ”
1 1/2"
STEP
CROSS SECTION
JOINT DETAIL
DETAIL OF PRECAST CONCRETE MANHOLE - FLAT TOP DETAIL OF REINFORCED
SEWER DETAILS
POLYPROPYLENE MANHOLE STEP
H. THE CONTRACTOR SHALL TEST ALL SEWER MAIN PIPES FOR MAXIMUM DEFLECTION OF 5% OF
OUTSIDE DIAMETER. DEFLECTION TESTS SHALL BE PERFORMED USING A CIRCULAR STEEL BALL
ON A SLED 1/16 INCH IN DIAMETER SMALLER THAN ALLOWABLE INSIDE DIAMETER OF SEWER MAIN
PIPE WHEN DEFLECTED TO A MAXIMUM OF 5% OF OUTSIDE DIAMETER. DEFLECTION OF ANY PIPE
WITHIN AN AREA OF CUT SHALL BE DONE NO SOONER THAN 30 DAYS AFTER THE DATE OF
INSTALLATION OF THE PIPE; AND WITHIN AN AREA OF FILL SHALL BE DONE NO SOONER THAN 60
DAYS, AFTER THE DATE OF INSTALLATION OF THE PIPE.
I. ’
C
L
CLEANOUT ASSEMBLY DETAIL
1. ALL CLEAN-OUT FRAMES AND COVERS SHALL BE MADE IN THE U.S.A., HEAVY
DUTY, SUITABLEFOR TRAFFIC LOADING WITH A MACHINED MATING SURFACE
FOR A TIGHT NON-ROCKING FIT.
2. CLEAN-OUT COVERS SHALL CONTAIN THE WORD "SEWER" CAST IN RAISED
LETTERS.
Manhole Frame and Covers Shall Be 3. THE CONTRACTOR SHALL BE RESPONSIBLE TO KEEP THE COVER PATTERN
As Manufactured By Campbell Foundry. CLEAN AND FREE OF EXCESS PAVEMENT, MORTAR, AND DIRT THAT MAY
(See notes Below). HINDER REMOVAL OR OBSCURE THE LETTERING UNTIL THE MUNICIPALITY
HAS ACCEPTED THE SEWER.
AMMENDED SITE PLAN
Outlet
YESHIVA OHR HAMEIR
Concrete Invert Trowel
Finished. Half Pipe
Concrete Invert and Bench. Diameter. Full Width
Trowel Finished. Half Pipe of Manhole.
Existing Sewer Main Diameter. Full Width
MANHOLE FRAME AND COVER of Manhole.
Prepared For
Existing Sewer Main Center Line of Pipe
MANHOLE FRAME AND COVER NOTES
Pitch
1" per ft. Ø0 Ø0
Contractor shall
1. ALL MANHOLE FRAMES AND COVERS SHALL BE MADE IN THE U.S.A., HEAVY DUTY, SUITABLE provide a watertight
FOR TRAFFIC LOADING WITH A MACHINED MATING SURFACE FOR A TIGHT NON-ROCKING seal at connection Contractor shall provide a
FIT. Existing around new pipe. watertight seal around new pipe
Manhole (Base) at connection to existing manhole
2. MANHOLE COVERS:
A. STANDARD MANHOLE COVERS - SHALL BE SOLID NON-VENTED CASTINGS AS
MANUFACTURED BY CAMPBELL CAMPBELL FOUNDRY, MODEL NO. 1011B. COVERS
Pipe Alignment Varies Existing GREASE TRAP
SHALL CONTAIN TWO WATERTIGHT CONCEALED PICKHOLES, AND THE WORD Pipe Alignment Varies and is Dependent on Manhole (Base)
"SEWER"/"DRAIN" CAST IN TWO INCH HIGH RAISED LETTERS. Field Conditions. ZURN PROCEPTOR® MODEL GMC 500
DETAIL OF PRECAST CONCRETE MANHOLE - CONE SECTION
Inlet
B. EASEMENT MANHOLE COVERS - SHALL BE SOLID NON-VENTED CASTINGS AS SECTION
MANUFACTURED BY CAMPBELL FOUNDRY, MODEL NO. 1454B. COVERS SHALL HAVE A RATED FOR 100 GPM
LOCKING MECHANISM, CONTAIN TWO WATERTIGHT CONCEALED PICKHOLES, AND NTS
THE WORD "SEWER"/"DRAIN" CAST IN TWO INCH HIGH RAISED LETTERS.
`
3. THE CONTRACTOR SHALL BE RESPONSIBLE TO KEEP THE COVER PATTERN CLEAN AND TYPICAL DETAIL OF TIE IN TO EXISTING MANHOLE
FREE OF EXCESS PAVEMENT, MORTAR, AND DIRT THAT MAY HINDER REMOVAL OR
OBSCURE THE LETTERING UNTIL THE MUNICIPALITY HAS ACCEPTED THE. SEWER
UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS
DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE
NEW YORK STATE EDUCATION LAW.
Page 39
16
GREASE TRAP DESIGN:
SHEET NUMBER
This narrative provides the basis-of-design for the grease waste system serving all kitchen fixtures. The
design includes fixture routing, flow calculations, NYS Plumbing Code compliance, and grease interceptor
WET TAP DETAIL sizing per the 2014 NYSDEC 30-minute detention standard. The kitchen operates with staggered fixture use
15
and does not run multiple sinks or equipment simultaneously.
N.T.S.
Fixtures Routed to Grease
Hand sink - 10×13×5 in
2-compartment sink - (18×24×14 in) ×2 bowls
3-compartment sink - 24×24×17, 24×24×17, 36×24×17 in
Vegetable prep sink - 20×20×14 in
2 TOWN COMMENTS 2-18-26
ORIGINAL DATE: 1-26-2026
1 TOWN COMMENTS 2-9-26
Mop/service sink - 18×19×14 in
Floor drain - kettle/skillet area
PROJECT NUMBER:
Pre-rinse sprayer - assumed 2.0 gpmHobart 6460 potato peeler - assumed 10 gpm intermittent
Methodology
NOTES: Grease interceptor sizing is based on:
1. THE SUBSURFACE GRADE FOR THE PROPOSED ROAD
SHALL BE INSPECTED AND APPROVED PRIOR TO ANY ITEM 4 a) Fixture bowl volume calculations using 75% usable volume and a 2-minute drain-down.
BEING PLACED AND COMPACTED. b) NYS Plumbing Code DFU values for drainage sizing.
2. IF THE SOIL IS DEEMED QUESTIONABLE GEOGRID MATERIAL
SHALL BE INSTALLED PRIOR TO THE ITEM 4 PLACEMENT. c) Peak flow (Q_peak) based on the largest credible simultaneous discharge event.
d) A required 30-minute detention time per NYSDEC Design Standards for Intermediate Sized
4
5
3
WastewaterTreatment Systems (2014).
TYPICAL ROAD SECTION
Updated Peak Flow Calculation (Realistic Operation)
The kitchen does not operate multiple sinks or equipment simultaneously. Sinks are filled and drained a
maximum of twice per day, and the Hobart potato peeler operates only 1.5 hours per week. The credible
peak flow is therefore limited to the largest sink drain with minor concurrent flow:
3-compartment sink drain: 55.6 gpm
Pre-rinse sprayer allowance: 2.0 gpm
Minor concurrency factor: 3-5 gpm
Resulting realistic Q_peak: **60-65 gpm**
CIARCIA ENGINEERING, P.C.
Grease Interceptor Sizing (Updated to 2,000 gallons)
Per NYSDEC, required working volume is:
Q_peak × 30 minutes
8'
YORKTOWN HEIGHTS, NY 10598
• At 60 gpm: 1,800 gallons
2' • At 65 gpm: 1,950 gallons
360 UNDERHILL AVENUE
The appropriate standard tank size is therefore **2,000 gallons**. This tank size is justified based on actual
kitchen operation and meets the required 30-minute detention time.
(914) 245-0123
5'
2' MIN TO GW OR
ROCK
INFILTRATION TRENCH
N.T.S.
MISC. DETAILS
1
6
4
VARIES (SEE NOTE 5)
3
5
TRASH ENCLOUSURE
1 PIPE INVERTS: 71 in / 5.92 ft
4
PREASSEMBLY REFERENCE: 47 3/4 in / 3.98 ft
AMMENDED SITE PLAN
BOTTOM OF INTERNALS: 30 3/8 in / 2.53 ft
YESHIVA OHR HAMEIR
A A 2
240° SUMP: 0 in / 0.00 ft
Prepared For
SECTION A-A
2 5 Notes:
FIRST DEFENSE FD-6HC
3 6 FT. HYDRODYNAMIC SEPARATOR
N.T.S. 1. AVOID OVER COMPACTION OF THE NATURAL SUBGRADE SOILS. UNDERDRAINS MAY BE
USED TO PROVIDE POSITIVE DRAINAGE.
2. OPEN GRADED BASE MATERIAL TO BE INSTALLED IN 6" LIFTS AND COMPACTED. THERE
Inlet pipe(s) can SHOULD BE A MINIMUM OF FOUR PASSES WITH NO VISIBLE MOVEMENT OF THE MATERIAL.
enter anywhere
3. PRESS #8 STONE INTO TOP OF #57 STONE WITH COMPACTION EQUIPMENT.
within 240° arc.
4. PAVERS TO BE SET USING 5000 LBF PLATE COMPACTOR.
PROCEPTOR MODEL GMC 1300 UPC DETAIL
PERMEABLE PAVER DETAIL N.T.S.
UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS
DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE N.T.S.
NEW YORK STATE EDUCATION LAW.
Page 40
16
SHEET NUMBER
16 1 TOWN COMMENTS 10-13-25
4 TOWN COMMENTS 2-18-26
3 TOWN COMMENTS 1-26-26
2 MISC. REVISIONS 12-17-25
ORIGINAL DATE: 6/11/2025
PROJECT NUMBER:
LIMITS OF SAW CUT
APPROXIMATE LOCATION
OF EXISTING 2" COPPER
WATER SERVICE TO BE
ABANDONED
WOO
LOD
DS
CE
5
NA
FUR ROAD
LOD
FM
FM
FM
FM
4
7
FM
LOD
LOD
LOD APPROXIMATE LOCATION OF
PROPOSED
FM
EXISTING 1" COPPER WATER
LOD CURB PROPOSED SERVICE TO REMAIN
PAVEMENT
FM
LOD
LO
FM
20' WIDENING
FM
D
FM
APPROXIMATE LOCATION OF
LOD EXISTING 2" COPPER WATER
FM
1H SERVICE TO REMAIN
LOD
LO
E 3 D
AL
LOD
LOD SW
LOD
N
IO
LOD RS
VE
DI PROPOSED
BUILDING
1H
LOD
LOD
LOD PROPANE
TANK
CIARCIA ENGINEERING, P.C.
4 LOD
Mohegan 43
PROPANE
D
LOD TANK 2
LO
LOD LOD
YD-2 LOD
RELOCATED
LOD PROPANE
LOD TANK
CB-2
D
LO PROPOSED PROPOSED
CURB TRASH
ENCLOSURE
PROPOSED
26"
YORKTOWN HEIGHTS, NY 10598
LOD PAVEMENT
PROPOSED
CURB YD-4
360 UNDERHILL AVENUE
YD-3
PROPOSED CB-1 LOD
LO ON-SITE
D WALKING
TRAIL LOD
CB-4
FD-1
LOD
(914) 245-0123
PROPOSED PROPOSED
GUIDERAIL SIDEWALK
LOD
YD-1
LOD
LOD HVAC
OIL
LO
TANK
D
LOD
LOD
LOD CB-3
LOD
D
LO
LOD
LO PROPOSED TEMPORAR
LOD
D Y CONSTRUCTION
ON-SITE WALKING TRAIL FENCE
REPLACE
ASPHALT
LOD
2H
PAVEMENT
LOD
13
LO
D
LOD
APPROXIMATE FEMA PROPOSED ON-SITE
LOD
100-YEAR FLOOD LIMIT OF DISTURBA
WALKING NCEMI
4.43 TRAIL 0.42
ACRES
LOD
ELEVATION 308.3
LO LOD TEMPORARY
D CONSTRUCTION
FENCE
LOD
LOD
LO
D
LOD
LOD
LOD
WALKING TRAILS
AMMENDED SITE PLAN
YESHIVA OHR HAMEIR
Prepared For
UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS
DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE SCALE: 1"=80'
NEW YORK STATE EDUCATION LAW.